Project System Vulnerability to Political Risks in International Construction Projects: The Case of Chinese Contractors

This study aims to explore the variables affecting the project system vulnerability to political risks in international construction projects. A questionnaire survey was conducted and 138 responses were received from both academia and industry. The exploratory factor analysis was then adopted to uncover the relationships among these variables. The results showed that three exposure factors (i.e., attribute-based exposure, strategy-based exposure, and transaction-based exposure) and three capacity factors (i.e., core competitive capacity, relative bargain capacity, and integrate adaptive capacity) were believed to be the significant underlying factors for the project system vulnerability to political risks. Also, case studies were conducted and the results indicated that the emergent framework was suitable and tractable for application in the future. This study provides a method for measuring the project system vulnerability to political risks; thus, international construction enterprises can decrease their risk exposure and enhance their capacity for dealing with political risks in international construction projects.

[1]  Xianggui Qu,et al.  Multivariate Data Analysis , 2007, Technometrics.

[2]  W. Adger,et al.  Theory and Practice in Assessing Vulnerability to Climate Change andFacilitating Adaptation , 2000 .

[3]  R. Tiong,et al.  Political Risks: analysis of Key Contract Clauses in China’s BOT Project , 1999 .

[4]  J. Steenkamp,et al.  The Effects of Supplier Fairness on Vulnerable Resellers , 1995 .

[5]  J. Palutikof,et al.  Climate change 2007 : impacts, adaptation and vulnerability , 2001 .

[6]  I. Alon,et al.  A stranger in a strange land: Micro political risk and the multinational firm , 2009 .

[7]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[8]  Yuquan Shi,et al.  Cultural influences on organizational processes in international projects: two case studies , 2001 .

[9]  James Agarwal,et al.  Political Risk and the Internationalization of Firms: An Empirical Study of Canadian-based Export and FDI Firms , 2007 .

[10]  Llewellyn D. Howell,et al.  Models of political risk for foreign investment and trade: An assessment of three approaches , 1994 .

[11]  David Arditi,et al.  Performance of International Joint Ventures in Construction , 2010 .

[12]  W. Powell,et al.  The iron cage revisited institutional isomorphism and collective rationality in organizational fields , 1983 .

[13]  C. R. Kennedy Political risk management: A portfolio planning model , 1988 .

[14]  Eleanor M.M. Davies,et al.  Managerial perceptions of political risk in international projects , 2007 .

[15]  Yadong Luo,et al.  A coopetition perspective of MNC-host government relations , 2004 .

[16]  M. Watts,et al.  The space of vulnerability: the causal structure of hunger and famine , 1993 .

[17]  R. Sitgreaves Psychometric theory (2nd ed.). , 1979 .

[18]  David B. Ashley,et al.  Political Risks in International Construction , 1987 .

[19]  Tillmann Sachs,et al.  The Quantification and Financial Impact of Political Risk Perceptions on Infrastructure Projects in Asia , 2008 .

[20]  L. Zhuang,et al.  Managing business risks in China , 1998 .

[21]  W. Adger,et al.  The determinants of vulnerability and adaptive capacity at the national level and the implications f , 2005 .

[22]  Essam Mahmoud,et al.  Political risk forecasting by Canadian firms , 1990 .

[23]  Jennifer M. Oetzel,et al.  Smaller may be beautiful but is it more risky? Assessing and managing political and economic risk in Costa Rica , 2005 .

[24]  M. Brooke Managing Political Risk Assessment , 1983 .

[25]  Seung Heon Han,et al.  Causes of Bad Profit in Overseas Construction Projects , 2007 .

[26]  E. Iankova,et al.  Strategies for political risk mediation by international firms in transition economies: the case of Bulgaria , 2003 .

[27]  Kamel Mellahi,et al.  Political risks as firm-specific (dis)advantages: evidence on transnational oil firms in Nigeria , 2003 .

[28]  Irem Dikmen,et al.  Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects , 2011 .

[29]  H. Jauch Chinese Investments in Africa , 2011 .

[30]  P. Olomolaiye,et al.  Factors and procedures used in matching project managers to construction projects in Bangkok , 2002 .

[31]  H. Kaiser An index of factorial simplicity , 1974 .

[32]  R. Rummel Applied Factor Analysis , 1970 .

[33]  Ka Chi Lam,et al.  A material supplier selection model for property developers using Fuzzy Principal Component Analysis , 2010 .

[34]  Hongliang Zhang,et al.  A redefinition of the project risk process: Using vulnerability to open up the event-consequence link , 2007 .

[35]  Jo Jakobsen Old problems remain, new ones crop up: Political risk in the 21st century , 2010 .

[36]  Florence Yean Yng Ling,et al.  Political, Economic, and Legal Risks Faced in International Projects: Case Study of Vietnam , 2010 .

[37]  David G. W. Birch,et al.  Risk analysis for Information Systems , 1992, J. Inf. Technol..

[38]  Jieh-Haur Chen,et al.  Quantifying Impact Factors of Corporate Financing: Engineering Consulting Firms , 2008 .

[39]  R. Kasperson,et al.  Linking vulnerability, adaptation, and resilience science to practice: Pathways, players, and partnerships , 2007 .

[40]  J. R. Turner,et al.  Towards a theory of project management: The nature of the project governance and project management , 2006 .

[41]  B. Smit,et al.  Adaptation, adaptive capacity and vulnerability , 2006 .

[42]  Charles Pahud de Mortanges,et al.  Political risk assessment: Theory and the experience of Dutch firms , 1996 .

[43]  Florence Yean Yng Ling,et al.  Risks faced by Singapore firms when undertaking construction projects in India , 2006 .

[44]  Yacov Y Haimes,et al.  On the Definition of Resilience in Systems , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[45]  R. Ramamurti The Obsolescing ‘Bargaining Model’? MNC-Host Developing Country Relations Revisited , 2001 .

[46]  Seung Heon Han,et al.  Approaches for Making Risk-Based Go/No-Go Decision for International Projects , 2001 .

[47]  Katharina Thywissen,et al.  Components of risk: a comparative glossary , 2006 .

[48]  M. Bartlett A Note on the Multiplying Factors for Various χ2 Approximations , 1954 .

[49]  W. Adger,et al.  THEORY AND PRACTICE IN ASSESSING VULNERABILITY TO CLIMATE CHANGE AND FACILITATING ADAPTATION , 2000 .

[50]  Stephen J. Kobrin,et al.  Foreign enterprise and forced divestment in LDCs , 1980, International Organization.

[51]  Xueqing Zhang,et al.  Factor Analysis of Public Clients’ Best-Value Objective in Public–Privately Partnered Infrastructure Projects , 2006 .

[52]  R. Grosse The bargaining relationship between foreign mnes and host governments in latin america , 1996 .

[53]  Robert L. K. Tiong,et al.  Evaluation and management of foreign exchange and revenue risks in China's BOT projects , 2000 .

[54]  D. Gerbing,et al.  Viability of exploratory factor analysis as a precursor to confirmatory factor analysis , 1996 .

[55]  J. D. L. Torre,et al.  Forecasting political risks for international operations , 1988 .

[56]  Monika Schnitzer,et al.  Who is Afraid of Political Risk? Multinational Firms and Their Choice of Capital Structure , 2007, SSRN Electronic Journal.

[57]  J. V. Wyk Political Sources of International Business Risk: An Interdisciplinary Framework , 2010 .

[58]  Stephanie Boehm,et al.  Applied Multivariate Techniques , 2016 .

[59]  David A. Smith,et al.  The Retreat of the State: The Diffusion of Power in the World Economy , 1998 .