Editorial: integrating “infrastructure project management” with its “built asset management”
暂无分享,去创建一个
[1] Mohan M. Kumaraswamy,et al. Contracting for community development: a case study based perspective of a public sector client initiative in Hong Kong , 2007 .
[2] Eran A. Edirisinghe,et al. Decision Making for Predictive Maintenance in Asset Information Management , 2009 .
[3] Mohan M. Kumaraswamy,et al. Object-oriented framework for durability assessment and life cycle costing of highway bridges , 2005 .
[4] Mohan M. Kumaraswamy,et al. Targeting relationally integrated teams for sustainable PPPS , 2007 .
[5] Chimay J. Anumba,et al. An integrated framework for concurrent life-cycle design and construction , 1998 .
[6] John L. Dettbarn,et al. Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry. , 2004 .
[7] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[8] Francis Tekyi Edum-Fotwe,et al. Developing project management competency: perspectives from the construction industry , 2000 .
[9] Peter E.D. Love,et al. Toward the sustainable adaptation of existing facilities , 2009 .
[10] Vivian W. Y Tam,et al. Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators , 2006 .
[11] Alistair G.F. Gibb,et al. Designing Facilities Management Needs into Infrastructure Projects: Case from a Major Hospital , 2003 .