Focused Issue: The Use of Information in Managing Supply Chains, Part 2 of 2: Coordinating Production and Delivery Under a (z, Z)-Type Vendor-Managed Inventory Contract

This paper models a type of vendor-managed inventory (VMI) agreement that occurs in practice called a (z, Z) contract. We investigate the savings due to better coordination of production and delivery facilitated by such an agreement. The optimal behavior of both the supplier and the retailer are characterized. The optimal replenishment and production policies for a supplier are found to be up-to policies, which are shown to be easily computed by decoupling the periods when the supplier outsources from those when the supplier does not outsource. A simple application of the newsvendor relation is used to define the retailer's optimal policy. Numerical analysis is conducted to compare the performance of a single supplier and a single retailer operating under a (z, Z) VMI contract with the performance of those operating under traditional retailer-managed inventory (RMI) with information sharing. Our results verify some observations made in industry about VMI and show that the (z, Z) type of VMI agreement performs significantly better than RMI in many settings, but can perform worse in others.

[1]  Christopher S. Tang,et al.  The Value of Information Sharing in a Two-Level Supply Chain , 2000 .

[2]  Tom Andel,et al.  MANAGE INVENTORY, OWN INFORMATION , 1996 .

[3]  Stephen C. Graves,et al.  A Review of Production Scheduling , 1981, Oper. Res..

[4]  S. Karlin,et al.  Studies in the Mathematical Theory of Inventory and Production, by K.J. Arrow, S. Karlin, H. Scarf with contributions by M.J. Beckmann, J. Gessford, R.F. Muth. Stanford, California, Stanford University Press, 1958, X p.340p., $ 8.75. , 1959, Bulletin de l'Institut de recherches économiques et sociales.

[5]  Fernando Bernstein,et al.  Pricing and Replenishment Strategies in a Distribution System with Competing Retailers , 2003, Oper. Res..

[6]  Gérard P. Cachon Stock Wars: Inventory Competition in a Two-Echelon Supply Chain with Multiple Retailers , 2001, Oper. Res..

[7]  Chung-Yee Lee,et al.  Stock Replenishment and Shipment Scheduling for Vendor-Managed Inventory Systems , 2000 .

[8]  C. Mangano Risky business. , 2003, The Journal of thoracic and cardiovascular surgery.

[9]  M. Savelsbergh,et al.  The Stochastic Inventory Routing Problem , 2000 .

[10]  Kamran Moinzadeh,et al.  A Multi-Echelon Inventory System with Information Exchange , 2002, Manag. Sci..

[11]  Gérard Cachon Fuqua Campbell Soup ’ s Continuous Replenishment Program : Evaluation and Enhanced Inventory Decision Rules ¤ , 1996 .

[12]  Martin W. P. Savelsbergh,et al.  The Stochastic Inventory Routing Problem with Direct Deliveries , 2002, Transp. Sci..

[13]  Janice H. Hammond,et al.  REENGINEERING CHANNEL REORDERING PROCESSES TO IMPROVE TOTAL SUPPLY‐CHAIN PERFORMANCE , 1997 .

[14]  William S. Lovejoy,et al.  Response Time Design in Integrated Order Processing/Production Systems , 1995, Oper. Res..

[15]  Daniel P. Heyman,et al.  Stochastic models in operations research , 1982 .

[16]  Gérard P. Cachon,et al.  Managing Supply Chain Demand Variability with Scheduled Ordering Policies , 1999 .

[17]  Paul H. Zipkin,et al.  Customer-order information, leadtimes, and inventories , 1995 .

[18]  S. Karlin,et al.  Studies in the Mathematical Theory of Inventory and Production, by K.J. Arrow, S. Karlin, H. Scarf with contributions by M.J. Beckmann, J. Gessford, R.F. Muth. Stanford, California, Stanford University Press, 1958, X p.340p., $ 8.75. , 1959, Bulletin de l'Institut de recherches économiques et sociales.

[19]  Marshall L. Fisher,et al.  Supply Chain Inventory Management and the Value of Shared Information , 2000 .

[20]  David F. Pyke,et al.  Exploiting timely demand information to reduce inventories , 1996 .

[21]  M. Savelsbergh,et al.  The Inventory Routing Problem , 1998 .

[22]  Paul Glasserman,et al.  Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems , 1995 .

[23]  R. Kapuściński,et al.  Value of Information in Capacitated Supply Chains , 1999 .

[24]  S. Elmaghraby The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .

[25]  R. Wets,et al.  Stochastic programming , 1989 .

[26]  J. Arthur Stochastic Models in Operations Research, Volume II. Stochastic Optimization (Daniel P. Heyman and Matthew J. Sobel) , 1985 .

[27]  M. Reiman,et al.  Echelon Reorder Points, Installation Reorder Points, and the Value of Centralized Demand Information , 1998 .

[28]  A. F. Veinott Optimal Policy for a Multi-product, Dynamic Non-Stationary Inventory Problem , 1965 .