Life cycle inventory processes of the integrated steel plant (ISP) in Krakow, Poland-continuous casting of steel (CCS): a case study

PurposeThe purpose of this study is to perform the life cycle inventory (LCI) to continuous casting of steel (CCS) process in integrated steel plant (ISP) in Krakow, Poland. The present LCI is representative for year 2015 by application of PN-EN ISO 14040 (2009). The system boundary was labeled as gate to gate. The background input and output data from the CCS has been inventoried as follows: consumption of energy and fuels, materials inputs, and waste.MethodsIn this paper, LCI CCS process on integrated permit (secondary data), literature information, and expert consultations was developed. The functional unit (FU) is represented by 1 t of steel slabs produced by CCS. Operating parameters as well as air emissions associated with the CCS process were presented. The production data (slabs) was given. The emissions of dust, Fe, PM10 and PM2.5, and waste (iron dust, iron particles, the others) are outcomes of the CCS processes.Results and discussionAnnually production of steel slabs in CCS plant amounted to 200,000 t. Coke oven gas, natural gas, steam, air, oxygen, casting powders for crystallizer and for intermediate tundish, refractory material, oil, lubricant, argon, and industrial water amounts were in the order of 2,750,000 Nm3/year, 770,000 Nm3/year, 2000 t/year, 90,000,000 Nm3/year, 970 t/year, 1300 t/year, 810 t/year, 30 t/year, 45 t/year, 330 t/year, and 13,175,300 m3/year, respectively. The average heat and electric energy consumptions were about 0.023 to 0.068 GJ/t and 12.0 to 17.2 kWh/t, respectively. Emissions in air of dust, Fe, PM10, and PM2.5 were in the order of 1.3, 0.1, 0.5, and 0.44 kg/h, respectively. The amounts of iron dust and the other waste were 200 t/year and 240 t, respectively. No information is available on CO2 emission.ConclusionsThe LCI study resulted in the development of a database with an inventory of secondary data regarding CCS process referring to the year 2015. The scope of this study considered input items needed in CCS production (entry gate) to the final delivery of steel slabs (exit gate). The raw materials, supplies, and equipment to the CCS plant and infrastructure are not taken into consideration in the analysis. The FU is 1 t of steel slabs.Recommendations and outlookThe LCI offers environmental information consisting of the list of environmental loads. The impact assessment phase aims to present more understandable results from the inventory analysis, and life cycle impact assessment will be the direction for future research.

[1]  Ernst Worrell,et al.  International comparison of CO2 emission trends in the iron and steel industry , 2002 .

[2]  Bogusław Bieda,et al.  Life cycle inventory processes of the Mittal Steel Poland (MSP) S.A. in Krakow, Poland—blast furnace pig iron production—a case study , 2012, The International Journal of Life Cycle Assessment.

[3]  巢志成,et al.  Life Cycle Inventory for Steel in Taiwan , 2001 .

[4]  Clare Broadbent,et al.  Steel’s recyclability: demonstrating the benefits of recycling steel to achieve a circular economy , 2016, The International Journal of Life Cycle Assessment.

[5]  Jean-Pierre Birat,et al.  REDUCTION OF CO 2 EMISSIONS IN THE STEEL INDUSTRY BASED ON LCA METHODOLOGY , 2009 .

[6]  David Hunkeler,et al.  The Future of Life Cycle Assessment , 2005 .

[7]  Brian G. Thomas,et al.  Calibration of Thermal Models of Continuous Casting of Steel , 2012 .

[8]  Xiaoxu Zhou,et al.  Real-Time, Model-Based Spray-Cooling Control System for Steel Continuous Casting , 2011 .

[9]  Caterina Micale,et al.  A novel approach for uncertainty propagation applied to two different bio-waste management options , 2016, The International Journal of Life Cycle Assessment.

[10]  Daman K. Panesar,et al.  Criteria for the evaluation of life cycle assessment software packages and life cycle inventory data with application to concrete , 2016, The International Journal of Life Cycle Assessment.

[11]  Dorota Burchart-Korol,et al.  Life cycle assessment of heat production from underground coal gasification , 2016, The International Journal of Life Cycle Assessment.

[12]  Joanna Kulczycka,et al.  Life cycle thinking in small and medium enterprises: the results of research on the implementation of life cycle tools in Polish SMEs—Part 3: LCC-related aspects , 2014, The International Journal of Life Cycle Assessment.

[13]  Dominique Millet,et al.  Does the potential of the use of LCA match the design team needs , 2007 .

[14]  J. Sarasa,et al.  Influence of Composition on the Environmental Impact of a Cast Aluminum Alloy , 2016, Materials.

[15]  A. Bokota,et al.  Numerical Model of Thermal and Flow Phenomena the Process Growing of the CC Slab , 2011 .

[16]  G. Bennett Integrated Life-Cycle and Risk Assessment for Industrial Processes , 2004 .

[17]  Dorota Burchart-Korol,et al.  Life cycle assessment of steel production in Poland: a case study , 2013 .

[18]  Hans-Jürgen Dr. Klüppel,et al.  The Revision of ISO Standards 14040-3 - ISO 14040: Environmental management – Life cycle assessment – Principles and framework - ISO 14044: Environmental management – Life cycle assessment – Requirements and guidelines , 2005 .

[20]  Kirana Chomkhamsri,et al.  10-year experience with the Thai national LCI database: case study of “refinery products” , 2017, The International Journal of Life Cycle Assessment.

[21]  M. Bahadir Analysis of the environmental effects of international outsourcing: Study of the iron casting industry , 2016 .

[22]  Brian G. Thomas,et al.  Utilization of CON1D at ArcelorMittal Dofasco's No. 2 Continuous Caster for Crater End Determination , 2009 .

[23]  Yuichi Moriguchi,et al.  Modelling CO2policies for the Japanese iron and steel industry , 2002, Environ. Model. Softw..

[24]  Yuichi Moriguchi,et al.  CO2 in the iron and steel industry: an analysis of Japanese emission reduction potentials , 2002 .

[25]  B. Thomas,et al.  Calibration of thermal models of steel continuous casting molds , 2013 .

[26]  Hao Sun,et al.  Identification of main influencing factors of life cycle CO2 emissions from the integrated steelworks using sensitivity analysis , 2010 .

[27]  Anna Lewandowska,et al.  Life cycle thinking in small and medium enterprises: the results of research on the implementation of life cycle tools in Polish SMEs—part 2: LCA related aspects , 2014, The International Journal of Life Cycle Assessment.

[28]  W. O. Berry,et al.  Preface , 1988, Brain Research Bulletin.

[29]  Anne Miller,et al.  THE USE OF LCA TO INTRODUCE LIFE-CYCLE THINKING INTO DECISION-MAKING FOR THE PURCHASE OF MEDICAL DEVICES IN THE NHS , 2000 .

[30]  Jean-Pierre Birat,et al.  Physicochemical modelling of the classical steelmaking route for life cycle inventory analysis , 2010 .

[31]  David Pennington,et al.  Recent developments in Life Cycle Assessment. , 2009, Journal of environmental management.

[32]  Germán Aroca,et al.  Environmental assessment of the production and addition of bioethanol produced from Eucalyptus globulus to gasoline in Chile , 2017, The International Journal of Life Cycle Assessment.

[33]  Brian G. Thomas,et al.  Continuous Casting of Steel , 2001 .

[34]  Bartłomiej Gaweł,et al.  Life cycle inventory processes of the integrated steel plant (ISP) in Krakow, Poland—coke production, a case study , 2015, The International Journal of Life Cycle Assessment.

[35]  Johannes Gediga,et al.  Lead industry life cycle studies: environmental impact and life cycle assessment of lead battery and architectural sheet production , 2016, The International Journal of Life Cycle Assessment.

[36]  Sohail Yasin,et al.  Statistical analysis of use-phase energy consumption of textile products , 2016, The International Journal of Life Cycle Assessment.

[37]  Susanna Horn,et al.  Eco-efficiency indicator framework implemented in the metallurgical industry: part 1—a comprehensive view and benchmark , 2016, The International Journal of Life Cycle Assessment.

[38]  Mohammed Ali,et al.  Cradle-to-gate life cycle assessment of global manganese alloy production , 2016, The International Journal of Life Cycle Assessment.

[39]  Brian G. Thomas,et al.  ROUND CONTINUOUS CASTING WITH EMS-CFD COUPLED , 2014 .

[40]  Jędrzej Kasprzak,et al.  The Polish Centre for Life Cycle Assessment—the centre for life cycle assessment in Poland , 2011 .

[41]  Bogusław Bieda,et al.  Life cycle inventory processes of the ArcelorMittal Poland (AMP) S.A. in Kraków, Poland—basic oxygen furnace steel production , 2012, The International Journal of Life Cycle Assessment.

[42]  Serge Roudier,et al.  Best Available Techniques (BAT) Reference Document for Iron and Steel Production: Industrial Emissions Directive 2010/75/EU: Integrated Pollution Prevention and Control , 2012 .

[43]  Gjalt Huppes,et al.  Three Strategies to Overcome the Limitations of Life‐Cycle Assessment , 2004 .

[44]  Bogusław Bieda,et al.  Life cycle inventory of energy production in ArcelorMittal steel power plant Poland S.A. in Krakow, Poland , 2011 .

[45]  Susanna Horn,et al.  Eco-efficiency indicator framework implemented in the metallurgical industry: part 2—a case study from the copper industry , 2016, The International Journal of Life Cycle Assessment.

[46]  Bing Xue,et al.  A life cycle co-benefits assessment of wind power in China , 2015 .

[47]  Sangwon Suh,et al.  Interoperability between ecoinvent ver. 3 and US LCI database: a case study , 2016, The International Journal of Life Cycle Assessment.