Decomposition Model Framework of Trading Volume of Cascade Hydropower Stations Under the Linking Mode of Medium-Long Term and Spot Market
暂无分享,去创建一个
Xie Mengfei | Zhang Maolin | Liu Xiangrui | Ma Gaoquan | He Peishan | Zhang Maolin | He Peishan | Xie Mengfei | Liu Xiangrui | Ma Gaoquan
[1] N. G. F. Sancho,et al. A new algorithm for the solution of multi-state dynamic programming problems , 1975, Math. Program..
[2] Peng Lu,et al. Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints , 2016 .
[3] Chuntian Cheng,et al. Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm1 , 2012 .
[4] Liu Yuan,et al. Medium-Term Hydro Generation Scheduling (MTHGS) with Chance Constrained Model (CCM) and Dynamic Control Model (DCM) , 2017, Water Resources Management.