Periodic and Sequential Inspection Policies with Mission Failure Probabilities

When a unit should provide reliability at mission time, the mission success probability or failure probability becomes an important constraint of planing inspection policies. From this viewpoint, this paper considers the optimization problems of periodic and sequential inspection policies with mission failure probabilities. In this paper, the mission time is also considered as a renewal point for inspection polices, but the failure cost occurred at mission time is higher than the total cost of inspection and failure detection. We give an upper limit of the failure probability at mission time, i.e., mission failure probability, to minimize the total expected cost of inspection policies. In addition, the extended models of inspection policies for an mission interval, a constant renewal time and the random mission times are given directly.

[1]  Min Xie,et al.  An imperfect maintenance policy for mission-oriented systems subject to degradation and external shocks , 2016, Comput. Ind. Eng..

[2]  A. Myers Probability of Loss Assessment of Critical $k$-Out-of-$n$:G Systems Having a Mission Abort Policy , 2009, IEEE Transactions on Reliability.

[3]  Toshio Nakagawa,et al.  Optimal inspection policies for a storage system with degradation at periodic tests , 2000 .

[4]  Ming Zhao,et al.  A combinatorial estimation approach for storage reliability with initial failures based on periodic testing data , 2017, Commun. Stat. Simul. Comput..

[5]  T. Yorozu,et al.  Electron Spectroscopy Studies on Magneto-Optical Media and Plastic Substrate Interface , 1987, IEEE Translation Journal on Magnetics in Japan.

[6]  Won Young Yun,et al.  Reliability Analysis for One-Shot Systems with Periodic Inspection , 2016 .

[7]  Won Young Yun,et al.  Determining the inspection intervals for one-shot systems with support equipment , 2018, Reliab. Eng. Syst. Saf..

[8]  蒋仁言 An efficient quasi-periodic inspection scheme for a one-component system , 2015 .

[9]  Antoine Grall,et al.  Sequential condition-based maintenance scheduling for a deteriorating system , 2003, Eur. J. Oper. Res..

[10]  Toshio Nakagawa,et al.  Optimal inspection policies for a system in storage , 1992 .

[11]  Christophe Bérenguer,et al.  Optimal inspection and maintenance for a repairable k-out-of-n: G warm standby system , 2020, Reliab. Eng. Syst. Saf..

[12]  Xin Liu,et al.  Storage reliability assessment for the stored equipment under periodical inspection , 2018, Advances in Mechanical Engineering.

[13]  Sharareh Taghipour,et al.  Periodic inspection frequency and inventory policies for a k-out-of-n system , 2016 .

[14]  B. Noble,et al.  On certain integrals of Lipschitz-Hankel type involving products of bessel functions , 1955, Philosophical Transactions of the Royal Society of London. Series A, Mathematical and Physical Sciences.

[15]  Gregory Levitin,et al.  Optimal mission abort policy for systems in a random environment with variable shock rate , 2018, Reliab. Eng. Syst. Saf..

[16]  Z. A. Lomnicki,et al.  Mathematical Theory of Reliability , 1966 .

[17]  H. E. Chandler,et al.  Technical writer's handbook , 1982, IEEE Transactions on Professional Communication.

[18]  Joo-Ho Lee,et al.  Optimal Two-Stage Periodic Inspection Policy for Maintaining Storage Reliability , 2008 .

[19]  Antoine Grall,et al.  A sequential condition‐based repair/replacement policy with non‐periodic inspections for a system subject to continuous wear , 2003 .

[20]  中川 覃夫,et al.  Maintenance theory of reliability , 2005 .

[21]  Junlin Xiong,et al.  Redundancy optimization of cold-standby systems under periodic inspection and maintenance , 2018, Reliab. Eng. Syst. Saf..

[22]  Won Young Yun,et al.  Storage availability of one-shot system under periodic inspection considering inspection error , 2019, Reliab. Eng. Syst. Saf..

[23]  Toshio Nakagawa,et al.  Optimal periodic and random inspections with first, last and overtime policies , 2015, Int. J. Syst. Sci..

[24]  R. Jiang,et al.  Optimization of alarm threshold and sequential inspection scheme , 2010, Reliab. Eng. Syst. Saf..

[25]  Yada Zhu,et al.  Multi-stage optimization for periodic inspection planning of geo-distributed infrastructure systems , 2015, Eur. J. Oper. Res..