The three-stage assembly flowshop scheduling problem
暂无分享,去创建一个
[1] Chung-Yee Lee,et al. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .
[2] Chris N. Potts,et al. The Two-Stage Assembly Scheduling Problem: Complexity and Approximation , 1995, Oper. Res..
[3] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[4] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[5] Chris N. Potts,et al. A New Heuristic for Three-Machine Flow Shop Scheduling , 1996, Oper. Res..
[6] Fennell Burns,et al. Technical Note - Three-Stage Flow-Shops with Recessive Second Stage , 1978, Oper. Res..
[7] Leslie A. Hall,et al. Approximability of flow shop scheduling , 1995, Proceedings of IEEE 36th Annual Foundations of Computer Science.
[8] Sergey Vasil'evich Sevast'janov,et al. Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops , 1995, Math. Oper. Res..
[9] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..