Development of generic key performance indicators for PMBOK® using a 3D project integration model

Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs) that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr) is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

[1]  Anton de Wit,et al.  Measurement of project success , 1988 .

[2]  A. K. Munns,et al.  The role of project management in achieving project success , 1996 .

[3]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[4]  John Wateridge,et al.  How can IS/IT projects be measured for success? , 1998 .

[5]  A. Sohal,et al.  International Journal of Quality and Reliability Management , 1999 .

[6]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[7]  A. Shenhar,et al.  Project Success: A Multidimensional Strategic Concept , 2001 .

[8]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[9]  Tzvi Raz,et al.  An empirical analysis of the relationship between project planning and project success , 2003 .

[10]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[11]  David Bryde,et al.  Modelling project management performance , 2003 .

[12]  Albert P.C. Chan,et al.  Key performance indicators for measuring construction success , 2004 .

[13]  D. Bryde Methods for Managing Different Perspectives of Project Success , 2005 .

[14]  D. Bryde,et al.  Client versus contractor perspectives on project success criteria , 2005 .

[15]  R. Müller,et al.  The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project , 2007 .

[16]  Joyce Fortune,et al.  Framing of project critical success factors by a systems model , 2006 .

[17]  Kumar Neeraj Jha,et al.  Commitment, coordination, competence and the iron triangle , 2007 .

[18]  Magnus Hellström,et al.  Integration as a project management concept: A study of the commissioning process in industrial deliveries , 2007 .

[19]  Ofer Zwikael,et al.  The Relative Importance of the PMBOK® Guide's Nine Knowledge Areas during Project Planning , 2009 .

[20]  Lavagnon A. Ika Project Success as a Topic in Project Management Journals , 2009 .

[21]  G. Fernández-Sánchez,et al.  A methodology to identify sustainability indicators in construction project management—Application to infrastructure projects in Spain , 2010 .

[22]  Stephen O. Ogunlana,et al.  Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects , 2010 .

[23]  Zakaria Harun,et al.  Future criteria for success of building projects in Malaysia , 2011 .

[24]  Yudha Andrian Saputra,et al.  Project Reliability: Probability of a Project Meets its Quality-Cost-Time Target under Uncertainty , 2011, Int. J. Electron. Bus. Manag..

[25]  Kumar Neeraj Jha,et al.  Success Traits for a Construction Project , 2012 .

[26]  Gilbert Silvius,et al.  Sustainability In Project Management , 2012, Corporate Sustainability.

[27]  Bon-Gang Hwang,et al.  Project management knowledge and skills for green construction: Overcoming challenges , 2013 .

[28]  Alex Hope,et al.  Re-imagining the Iron Triangle: Embedding Sustainability into Project Constraints , 2013 .

[29]  Kenneth H. Rose A Guide to the Project Management Body of Knowledge (PMBOK® Guide)—Fifth Edition , 2013 .

[30]  K. Davis Different stakeholder groups and their perceptions of project success , 2014 .