Improving Changeover Time: A Tailored SMED Approach for Welding Cells
暂无分享,去创建一个
[1] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[2] Geraint W Owen,et al. A formal design for changeover methodology. Part 1: Theory and background , 2006 .
[3] N. Nayab. Kaizen: The key to Japan‚s competitive success , 2009 .
[4] Geraint W Owen,et al. A critical evaluation of Shingo's 'SMED' (Single Minute Exchange of Die) methodology , 2000 .
[5] Hanif D. Sherali,et al. A quantitative approach for scheduling activities to reduce set-up in multiple machine lines , 2008, Eur. J. Oper. Res..
[6] J. Kidd. Management Teams: Why They Succeed or Fail , 1982 .
[7] Geraint W Owen,et al. Changeover improvement: A maintenance perspective , 2001 .
[8] Shigeo Shingo. A Revolution in Manufacturing: The SMED System , 1985 .
[9] Manoj K. Malhotra,et al. Operations Management: Processes and Supply Chains , 2012 .
[10] Antony R Mileham,et al. Review of fast tool change systems , 1995 .
[11] R. Meredith Belbin,et al. Management Teams: Why They Succeed or Fail (3rd ed.) , 2011 .
[12] Antony R Mileham,et al. Improving Changeover Performance- A strategy for becoming a lean and responsive manufacture , 2001 .
[13] Hendrik Van Landeghem,et al. Rules for integrating fast changeover capabilities into new equipment design , 2002 .
[14] Mehmet Cakmakci. Process improvement: performance analysis of the setup time reduction-SMED in the automobile industry , 2009 .