The impact of engineering changes on materials planning

Purpose – The purpose of this paper is to increase the understanding of the impact of engineering changes on the materials planning process. Design/methodology/approach – This study is based on a conceptual discussion and empirical data from a case study of a supply chain in the automotive industry, including end producers (two OEM companies) and first, second and third tier suppliers. Findings – A framework comprising the situational dimensions of the engineering change was derived from the conceptual discussion and described in terms of product, supply, manufacturing, demand and materials planning characteristics. The empirical study shows the characteristics of the engineering change in the case company and how these have both positive and negative, as well as direct and indirect, influences on the materials scrap, administrative and transport/handling costs. The impact of the actual materials planning strategies is also shown. Another finding was that different engineering change situations exist within the same company. Thus, it is necessary to distinguish between them and to use different planning strategies for each situation. The paper discusses how such differentiated strategies could be developed in the case companies and in general. Research limitations/implications – The case study focused on a specific product and materials planning situation in the automotive supply chain. Other products and materials planning situations resulting from the same engineering change would have different characteristics and should, therefore, be planned and controlled accordingly. However, the developed framework is a general one. Practical implications – The appropriateness of a materials planning strategy differs between different engineering change situations. This calls for differentiated materials planning strategies based on the engineering change situation and materials planning characteristics. The framework developed in this paper describes the entire materials planning environment in engineering change situations in order to understand when and how to differentiate materials planning strategies. Originality/value – This paper fulfils a need for a framework that describes the impact on materials planning from an engineering change perspective. This framework is the first step in the designing of a normative guideline for differentiated materials planning strategies in an engineering change situation.

[1]  Luk N. Van Wassenhove,et al.  The effect of engineering changes and demand uncertainty on MRP lot sizing: a case study , 1985 .

[2]  Keith R. Plossl Engineering for the control of manufacturing , 1987 .

[3]  Hal Mather,et al.  Bills of materials , 1987 .

[4]  Sander de Leeuw,et al.  Distribution control at exhaust systems Europe , 1996 .

[5]  Jing Li,et al.  Progressive engineering changes in multi-level product structures , 1997 .

[6]  William L. Berry,et al.  Linking Systems to Strategy , 1992 .

[7]  George William Plossl,et al.  Production and Inventory Control; Principles and Techniques , 1976 .

[8]  Jimmie Browne,et al.  Production Management Systems: An Integrated Perspective , 1996 .

[9]  Jerrt Clement,et al.  Manufacturing Data Structures; Building Foundations for Excellence with Bills of Materials and.. , 1992 .

[10]  Tom Yager,et al.  Embracing Change , 2019, Think Like a Dog.

[11]  H.L. Lee,et al.  Aligning Supply Chain Strategies with Product Uncertainties , 2002, IEEE Engineering Management Review.

[12]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[13]  H Mather,et al.  Reschedule the reschedules you just rescheduled - Way of life for MRP? , 1977 .

[14]  George Q. Huang,et al.  Current practices of engineering change management in UK manufacturing industries , 1999 .

[15]  Paul Schönsleben Varying concepts of planning and control in enterprise logistics , 2000 .

[16]  Carl Wänström Assessing the Information Quality in the Materials Phase-in and Phase-out Process , 2003 .

[17]  Barrie Dale,et al.  Engineering change administration: the key issues , 1992 .

[18]  B. G. Dale The management of engineering change procedure , 1982 .

[19]  Patrik Jonsson,et al.  The implications of fit between planning environments and manufacturing planning and control methods , 2003 .

[20]  Kamel Rouibah,et al.  Change management in concurrent engineering from a parameter perspective , 2003, Comput. Ind..

[21]  V. Sridharan,et al.  Linking manufacturing planning and control to the manufacturing environment , 1995 .

[22]  C. Gopinath,et al.  LINKING COMPETITIVE STRATEGY AND MANUFACTURING PROCESS TECHNOLOGY , 1995 .

[23]  Yuh-Min Chen,et al.  Distributed engineering change management for allied concurrent engineering , 2002, Int. J. Comput. Integr. Manuf..

[24]  Helena Forslund,et al.  The existence of logistics quality deficiencies and the impact of information quality in the dyadic order fulfillment process , 2004 .

[25]  Chrwan-Jyh Ho,et al.  Evaluating the impact of frequent engineering changes on MRP system performance , 1994 .

[26]  B. G. Dale,et al.  Interchangeability: the key to effective engineering change control , 1989 .

[27]  Ashok Kochhar,et al.  A rule‐base for the specification of manufacturing planning and control system activities , 2002 .

[28]  Ronald H. Ballou,et al.  Business logistics management : planning, organizing, and controlling the supply chain , 1999 .

[29]  P. Gu,et al.  Real-time part dispatching within manufacturing cells using fuzzy logic , 1997 .

[30]  Stig Arne Mattsson,et al.  The selection and application of material planning methods , 2002 .

[31]  D. Lambert,et al.  Strategic Logistics Management , 1987 .

[32]  Roger Maull,et al.  The role of the bill-of-materials as a CAD/CAPM interface and the key importance of engineering change control , 1992 .

[33]  Chrwan Jyh Ho,et al.  MRP system performance under lumpy demand environments , 2001 .

[34]  F. Robert Jacobs,et al.  MANUFACTURING PLANNING AND CONTROL SYSTEMS FOR SUPPLY CHAIN MANAGEMENT , 2004 .