Optimizing Design on Emergency Power Supply of Large Dynamotor Unit
暂无分享,去创建一个
Lei Zhou | Duo Wang | Nan Yang | Shuqin Sun
[1] Joon-Eon Yang,et al. A quantitative analysis of a risk impact due to a starting time extension of the emergency diesel generator in optimized power reactor-1000 , 2007, Reliab. Eng. Syst. Saf..
[2] Dong Jing-we. Diesel generator selection and power room design , 2011 .
[3] Wang Jian,et al. Simulation of auxiliary power system operating state for 600 MW air-cooling units , 2008, 2008 China International Conference on Electricity Distribution.
[4] S. A. Eide,et al. Detailed Study of Emergency Diesel Generator Performance Using EPIX/RADS Database , 2008 .
[5] Weibo Li,et al. Comparison with Three Projects of Auxiliary Power Wiring for 1000MW Unit Based on ETAP , 2009, 2009 Asia-Pacific Power and Energy Engineering Conference.
[6] D. Sarussi,et al. Design of emergency power systems for reliable uninterrupted high power applications , 2007, 2007 9th International Conference on Electrical Power Quality and Utilisation.
[7] K. Raja,et al. Emergency power supply system of a Nuclear Power Plant-modelling and simulation studies of Diesel generators and load pickup on emergency transfer , 2011, 2011 1st International Conference on Electrical Energy Systems.
[8] Cui Xun. Discussion on Function Modification and Startup Test of Emergency Diesel Generator in Power Plant , 2010 .
[9] Jian Wang,et al. Study on Large Asynchronous Motor Starting Check for Auxiliary Power System , 2010, 2010 Asia-Pacific Power and Energy Engineering Conference.
[10] K. E. Yeager,et al. Modeling of emergency diesel generators in an 800 megawatt nuclear power plant , 1993 .
[11] Zou Xuan. Discussion on the connection scheme of AC emergency power supply for 300MW unit thermal power plant , 2010 .