Adaptive Blending of Model and Observations for Automated Short-Range Forecasting: Examples from the Vancouver 2010 Olympic and Paralympic Winter Games

An automated short-range forecasting system, adaptive blending of observations and model (ABOM), was tested in real time during the 2010 Vancouver Olympic and Paralympic Winter Games in British Columbia. Data at 1-min time resolution were available from a newly established, dense network of surface observation stations. Climatological data were not available at these new stations. This, combined with output from new high-resolution numerical models, provided a unique and exciting setting to test nowcasting systems in mountainous terrain during winter weather conditions. The ABOM method blends extrapolations in time of recent local observations with numerical weather predictions (NWP) model predictions to generate short-range point forecasts of surface variables out to 6 h. The relative weights of the model forecast and the observation extrapolation are based on performance over recent history. The average performance of ABOM nowcasts during February and March 2010 was evaluated using standard scores and thresholds important for Olympic events. Significant improvements over the model forecasts alone were obtained for continuous variables such as temperature, relative humidity and wind speed. The small improvements to forecasts of variables such as visibility and ceiling, subject to discontinuous changes, are attributed to the persistence component of ABOM.

[1]  P. Joe,et al.  Roundhouse (RND) Mountain Top Research Site: Measurements and Uncertainties for Winter Alpine Weather Conditions , 2012, Pure and Applied Geophysics.

[2]  William H. Press,et al.  Numerical recipes in C , 2002 .

[3]  B. Golding Nimrod: a system for generating automated very short range forecasts , 1998 .

[4]  The Monitoring Network of the Vancouver 2010 Olympics , 2012, Pure and Applied Geophysics.

[5]  T. Başar,et al.  A New Approach to Linear Filtering and Prediction Problems , 2001 .

[6]  A. Zadra,et al.  The 15‐km version of the Canadian regional forecast system , 2006 .

[7]  A. Seed,et al.  STEPS: A probabilistic precipitation forecasting scheme which merges an extrapolation nowcast with downscaled NWP , 2006 .

[8]  H. Glahn,et al.  The Use of Model Output Statistics (MOS) in Objective Weather Forecasting , 1972 .

[9]  George A. Isaac,et al.  Weather Services, Science Advances, and the Vancouver 2010 Olympic and Paralympic Winter Games , 2010 .

[10]  T. Haiden,et al.  Combining 2-m temperature nowcasting and short range ensemble forecasting , 2011 .

[11]  B. Denis,et al.  An Experimental High-Resolution Forecast System During the Vancouver 2010 Winter Olympic and Paralympic Games , 2012, Pure and Applied Geophysics.

[12]  Judy E. Ghirardelli,et al.  The Meteorological Development Laboratory’s Aviation Weather Prediction System , 2010 .

[13]  George A. Isaac,et al.  ENVIRONMENT CANADA'S EXPERIMENTAL NUMERICAL WEATHER PREDICTION SYSTEMS FOR THE VANCOUVER 2010 WINTER OLYMPIC AND PARALYMPIC GAMES , 2010 .

[14]  T. Haiden,et al.  The Integrated Nowcasting through Comprehensive Analysis (INCA) System and Its Validation over the Eastern Alpine Region , 2011 .

[15]  J. P. Burg,et al.  Maximum entropy spectral analysis. , 1967 .

[16]  F. Fabry,et al.  Airport Vicinity Icing and Snow Advisor (AVISA) , 2006 .

[17]  Marcel Vallée,et al.  The Canadian Updateable Model Output Statistics (UMOS) System: Design and Development Tests , 2002 .

[18]  George A. Isaac,et al.  The Canadian Airport Nowcasting System (CAN‐Now) , 2014 .

[19]  T. Wigley,et al.  Downscaling general circulation model output: a review of methods and limitations , 1997 .

[20]  M. Bailey,et al.  Science of Nowcasting Olympic Weather for Vancouver 2010 (SNOW-V10): a World Weather Research Programme Project , 2012, Pure and Applied Geophysics.

[21]  Barbara G. Brown,et al.  Forecast verification: current status and future directions , 2008 .