Stochastic time–cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance

[1]  William J. Moonan Linear Transformation to a Set of Stochastically Dependent Normal Variables , 1957 .

[2]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[3]  D. R. Fulkerson A Network Flow Computation for Project Cost Curves , 1961 .

[4]  Charles E. Clark,et al.  Letter to the Editor—The PERT Model for the Distribution of an Activity Time , 1962 .

[5]  J W Fondahl,et al.  A non-computer approach to the critical path method , 1962 .

[6]  W. J. Conover,et al.  Practical Nonparametric Statistics , 1972 .

[7]  C. Perry,et al.  Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis , 1975 .

[8]  M. Dessouky,et al.  Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept , 1977 .

[9]  Srilal Perera Linear Programming Solution to Network Compression , 1980 .

[10]  J. E. Selvidge,et al.  ASSESSING THE EXTREMES OF PROBABILITY DISTRIBUTIONS BY THE FRACTILE METHOD , 1980 .

[11]  Bruce W. Schmeiser,et al.  Bivariate Gamma Random Vectors , 1982, Oper. Res..

[12]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[13]  Robert I. Carr,et al.  TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES , 1989 .

[14]  Simaan M. AbouRizk,et al.  Visual Interactive Fitting of Beta Distributions , 1991 .

[15]  Ali Touran,et al.  Monte Carlo Technique with Correlated Random Variables , 1992 .

[16]  S. Abourizk,et al.  STATISTICAL PROPERTIES OF CONSTRUCTION DURATION DATA , 1992 .

[17]  A. Touran Probabilistic Cost Estimating with Subjective Correlations , 1993 .

[18]  D. Keefer,et al.  Better estimation of PERT activity time parameters , 1993 .

[19]  Foad Farid,et al.  Simulation verifies queuing program for selecting loader-truck fleets , 1994 .

[20]  Erik Demeulemeester,et al.  Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .

[21]  Chung-Wei Feng,et al.  Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .

[22]  David M. Wall,et al.  Distributions and correlations in Monte Carlo simulation , 1997 .

[23]  A. Touran,et al.  RANK CORRELATIONS IN SIMULATING CONSTRUCTION COSTS , 1997 .

[24]  Peter E.D. Love,et al.  Using improved genetic algorithms to facilitate time-cost optimization , 1997 .

[25]  R. Nelsen An Introduction to Copulas , 1998 .

[26]  Stephen J. Wright,et al.  Numerical Optimization , 2018, Fundamental Statistical Inference.

[27]  Heng Li,et al.  Using machine learning and GA to solve time-cost trade-off problems , 1999 .

[28]  Sou-Sen Leu,et al.  GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .

[29]  Tarek Hegazy Optimization of construction time-cost trade-off analysis using genetic algorithms , 1999 .

[30]  Chung-Wei Feng,et al.  Stochastic construction time-cost trade-off analysis , 2000 .

[31]  Wei-Chih Wang,et al.  Application example for evaluating networks considering correlation , 2000 .

[32]  Albert P.C. Chan Time–cost relationship of public sector projects in Malaysia , 2001 .

[33]  Wei-Chih Wang,et al.  Simulation‐Facilitated Model for Assessing Cost Correlations , 2002 .

[34]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[35]  Maurice Clerc,et al.  The particle swarm - explosion, stability, and convergence in a multidimensional complex space , 2002, IEEE Trans. Evol. Comput..

[36]  Wei-Chih Wang SIM-UTILITY: Model for Project Ceiling Price Determination , 2002 .

[37]  Samuel T. Ariaratnam,et al.  RISK-BASED LIFE-CYCLE COSTING OF INFRASTRUCTURE REHABILITATION AND CONSTRUCTION ALTERNATIVES , 2003 .

[38]  John C. Goodpasture Quantitative Methods in Project Management , 2003 .

[39]  Cengiz Haksever,et al.  Flexible Model for Time'Cost Tradeoff Problem , 2004 .

[40]  Mohan M. Kumaraswamy,et al.  Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization , 2005 .

[41]  Amir Azaron,et al.  A genetic algorithm approach for the time-cost trade-off in PERT networks , 2005, Appl. Math. Comput..

[42]  Cliff Schexnayder,et al.  Describing a beta probability distribution function for construction simulation , 2005 .

[43]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[44]  Simon Smith,et al.  Lognormal Distribution Provides an Optimum Representation of the Concrete Delivery and Placement Process , 2005 .

[45]  Daniel W. Halpin,et al.  Productivity and Cost Regression Models for Pile Construction , 2005 .

[46]  Riccardo Poli,et al.  Particle swarm optimization , 1995, Swarm Intelligence.

[47]  I-Tung Yang,et al.  Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis , 2007 .

[48]  Hamed R. Tareghian,et al.  A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , 2007, Appl. Math. Comput..

[49]  I-Tung Yang,et al.  Risk Modeling of Dependence among Project Task Durations , 2007, Comput. Aided Civ. Infrastructure Eng..

[50]  Avraham Shtub,et al.  The stochastic time–cost tradeoff problem: A robust optimization approach , 2007 .

[51]  I-Tung Yang,et al.  Distribution-Free Monte Carlo Simulation: Premise and Refinement , 2008 .

[52]  S. Thomas Ng,et al.  Optimizing Construction Time and Cost Using Ant Colony Optimization Approach , 2008 .

[53]  Sanjay Srivastava,et al.  Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling , 2008 .

[54]  I-Tung Yang,et al.  Probabilistic simulation for developing likelihood distribution of engineering project cost , 2009 .

[55]  A. Samer Ezeldin,et al.  Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects , 2009 .

[56]  Hua Ke,et al.  Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem , 2009, Appl. Math. Comput..

[57]  Abdollah Aghaie,et al.  Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation , 2009 .

[58]  I-Tung Yang,et al.  Multiobjective optimization for manpower assignment in consulting engineering firms , 2011, Appl. Soft Comput..