Lean design and analysis of a milk-run delivery system: Case study

Multiple discrete event simulation models are developed to represent a milk-run delivery system in an automobile emissions system production facility as part of a logistics system overhaul. The aim of this study is to analyze resupply configurations and variability in key model inputs in order to make recommendations based on supply train utilization and workstation starvation. This study includes three experiments that compare optimized routing, recommended routing, and on-demand resupply systems. Sensitivity analyses are conducted to measure the effects of various factors such as number of supply trains, travel speeds, and load and unload times to find the best combination of input parameters. The results of the proposed simulation models demonstrated potential impacts of a milk-run delivery framework on pull systems with limited transport capabilities, but diminished improvements on systems with multiple supply trains.

[1]  F. Al-Shamali,et al.  Author Biographies. , 2015, Journal of social work in disability & rehabilitation.

[2]  A. Gunasekaran Just-in-time purchasing:: An investigation for research and applications , 1999 .

[3]  Maurice Bonney,et al.  Trends in inventory management , 1994 .

[4]  J. D. Haan,et al.  Zero inventory management: facts or fiction? Lessons from Japan , 1999 .

[5]  大野 耐一,et al.  Just-in-time for today and tomorrow , 1988 .

[6]  Liping Cheng,et al.  AN EFFECTIVE MIXED-MODEL ASSEMBLY LINE SEQUENCING HEURISTIC FOR JUST-IN-TIME PRODUCTION SYSTEMS , 1993 .

[7]  新郷 重夫,et al.  A study of the Toyota production system from an industrial engineering viewpoint , 1989 .

[8]  Przemyslaw Korytkowski,et al.  Simulation-based efficiency analysis of an in-plant milk-run operator under disturbances , 2015, The International Journal of Advanced Manufacturing Technology.

[9]  Akintola Akintoye,et al.  Just-in-Time application and implementation for building material management , 1995 .

[10]  Robin Hanson,et al.  Impact of unit load size on in-plant materials supply efficiency , 2011 .

[11]  B. Williams,et al.  Operations management. , 2001, Optometry.

[12]  Yavuz A. Bozer,et al.  Performance evaluation of small-batch container delivery systems used in lean manufacturing – Part 1: system stability and distribution of container starts , 2013 .

[13]  J. Miltenberg,et al.  Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .

[14]  Nesa L'abbe Wu,et al.  Linear programming and extensions , 1981 .

[15]  Nils Boysen,et al.  Level Scheduling for batched JIT supply , 2009 .

[16]  William Feld,et al.  Lean Manufacturing: Tools, Techniques, and How to Use Them , 2000 .

[17]  Patricia J. Daugherty,et al.  Just‐in‐time Functional Model , 1994 .

[18]  William Grant Ireson Factory planning and plant layout , 1952 .