Measuring the performance of value management studies in construction : critical review

Value management (VM) is a useful method to use when dealing with issues such as budget and schedule challenges arising in the construction industry. However, little research has been done to measure the performance of VM studies, which has made many potential users reluctant to use VM. This paper presents a critical review of the development of performance measurement in general and the performance measurement in the construction industry, with a special focus on the performance measurement of VM studies in construction. The strengths and weaknesses of the existing measurement frameworks are investigated in the context of VM studies. It is concluded that traditional performance measurement of VM studies focusing on cost reduction is insufficient. Many other perspectives, such as clarifying objectives, and improving communication among stakeholders, should be considered seriously when making the measurement. This paper reveals that the existing frameworks to measure VM studies are inappropriate. It suggests that perspectives such as multicriteria measurement, flexible framework for different practice, and benchmarking to identify best practice could be adapted to develop a performance measurement framework for VM studies.

[1]  A. Neely The performance measurement revolution: why now and what next? , 1999 .

[2]  Terry Thomas,et al.  Simple durability test for cement stabilized blocks , 2004 .

[3]  Chau Kwong Wing,et al.  The ranking of construction management journals , 1997 .

[4]  Naomi Garnett,et al.  Benchmarking for construction: theory and practice , 2000 .

[5]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[6]  Kelvin F. Cross,et al.  The “SMART” way to define and sustain success , 1988 .

[7]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[8]  R. Kaplan Accounting Lag: The Obsolescence of Cost Accounting Systems , 1986 .

[9]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[10]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[11]  Umit Bititci,et al.  Integrated performance measurement systems: a development guide , 1997 .

[12]  William C. McElligott,et al.  Value Management in Construction , 1995 .

[13]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[14]  Andy Neely,et al.  The Performance Prism: The Scorecard for Measuring and Managing Business Success , 2002 .

[15]  Sai On Cheung,et al.  PPMS: a Web-based construction Project Performance Monitoring System , 2004 .

[16]  Wickham Skinner,et al.  The Productivity Paradox , 1986, The Productivity-Inclusiveness Nexus.

[17]  Scott Fernie,et al.  The Value Management Benchmark: a Good Practice Framework for Clients and Practitioners , 1998 .

[18]  R. Kaplan Measuring manufacturing performance: a new challenge for managerial accounting research , 1983 .

[19]  Lawrence D. Miles,et al.  Techniques Of Value Analysis And Engineering , 1961 .

[20]  Qiping Shen,et al.  A knowledge based structure for implementing Value Management in the design of office buildings , 1993 .

[21]  Luis F. Alarcón,et al.  Benchmarking System for Evaluating Management Practices in the Construction Industry , 2004 .

[22]  Mohan M. Kumaraswamy,et al.  Systematizing Construction Project Evaluations , 1996 .

[23]  T Chamberlain,et al.  THE CONSTRUCTION INDUSTRY INSTITUTE , 1990 .

[24]  Qiping Shen,et al.  Is the Hong Kong construction industry ready for value management , 2000 .

[25]  Steven Male,et al.  Holistic appraisal of value engineering in construction in United States , 1996 .

[26]  Steve R. Sanders,et al.  PEER-REVIEWED PAPER:Partnering Continuum , 1998 .

[27]  Peter E.D. Love,et al.  Partnering research in construction , 2000 .

[28]  Scott Fernie,et al.  The Value Management Benchmark: Research Results of an International Benchmarking Study , 1998 .

[29]  Alfred J. Nanni,et al.  The New Performance Challenge: Measuring Operations for World-Class Competition , 1990 .

[30]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[31]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[32]  David Arditi,et al.  Assessing contractor quality performance , 2002 .

[33]  Andrew D.F. Price,et al.  Performance Measurement in Construction , 2004 .

[34]  Roberto Pietroforte,et al.  ASCE Journal of Construction Engineering and Management: Review of the Years 1983-2000 , 2004 .

[35]  T. Thorpe,et al.  KPIs: a critical appraisal of their use in construction , 2004 .

[36]  Qiping Shen,et al.  Critical Success Factors for Value Management Studies in Construction , 2003 .

[37]  Jacky K.H. Chung,et al.  A group decision support system for value management studies in the construction industry , 2002 .

[38]  S. Ward,et al.  Objectives and performance in construction projects , 1991 .

[39]  Anthony Walker,et al.  Evaluation of project outcomes , 1998 .

[40]  Graham Winch,et al.  Benchmarking on-site productivity in France and the UK: a CALIBRE approach , 2001 .