Electronic Kanban System for Rubber Seals Production

A key success for automotive suppliers relies on its on-time delivery and efficient manufacturing process. A case-study rubber seal manufacturer is using just in time (JIT) techniques, requiring efficient process flow with low wastes. However, the majority of the current processes still rely on workers’ expertise that can lead to process errors. In 2011, 699 events of rubber supplying delays were found and 525 events or 75.11% of these delays are due to inappropriate ordering and management of the Kanban system in the rubber preparation process. The objective of this research is, therefore, to improve the rubber preparation process by developing a logical method to identify appropriate times for each step and designing information management for the Electronic Kanban System (E-Kanban) to be able to deliver effective and accurate signaling. This E-Kanban system must be able to automatically indicate when each step in the rubber preparation should start so that the rubbers are prepared and ready for the next moulding process by the time they are needed. We also design user interface for an effective use of the system in actual operation. After the developed E-Kanban system was implemented in the factory from July to October 2012, we found that the number of rubber supplying delays could be reduced to 86 events and only 11 events or 12.79% of these delays are from the rubber preparation process.

[1]  S. K. Mukhopadhyay *,et al.  Kanban implementation at a tyre manufacturing plant: a case study , 2005 .

[2]  Batoul Modarress,et al.  Just-in-Time Purchasing , 1990 .

[3]  Raymond S. Louis Custom Kanban: Designing the System to Meet the Needs of Your Environment , 2006 .

[4]  Adnan M. Mukattash,et al.  Design and analysis of production control scheme for Kanban-based JIT environment , 2006, J. Frankl. Inst..

[5]  I. A. Kouri,et al.  The Principles and Planning Process of an Electronic Kanban System , 2008 .

[6]  R. John Milne,et al.  Literature review of material flow control mechanisms , 1995 .

[7]  Felix T.S. Chan Effect of kanban size on just-in-time manufacturing systems , 2001 .

[8]  Jürgen Strohhecker,et al.  Integrating Kanban principles in a pharmaceutical campaign production system , 2014 .

[9]  Vikas Kumar,et al.  Supplier replenishment policy using e-Kanban: A framework for successful implementation , 2014 .

[10]  Richard J. Schonberger,et al.  Just-in-Time Purchasing: A Challenge for U.S. Industry , 1983 .

[11]  Valerie Tardif,et al.  An adaptive approach to controlling kanban systems , 2001, Eur. J. Oper. Res..

[12]  Muris Lage Junior,et al.  Variations of the kanban system: Literature review and classification , 2010 .

[13]  Bruce D. Henderson THE LOGIC OF KANBAN , 1986 .

[14]  Hussein M. Reda A review of “kanban”—the Japanese “Just-In-Time” production system , 1987 .

[15]  Surendra M. Gupta,et al.  Flexible kanban system , 1999 .