Capacity management of modular assembly systems

Companies handling large product portfolio often face challenges that stem from market dynamics. Therefore, in production management, efficient planning approaches are required that are able to cope with the variability of the order stream to maintain the desired rate of production. Modular assembly systems offer a flexible approach to react to these changes, however, there is no all-encompassing methodology yet to support long and medium term capacity management of these systems. The paper introduces a novel method for the management of product variety in assembly systems, by applying a new conceptual framework that supports the periodic revision of the capacity allocation and determines the proper system configuration. The framework has a hierarchical structure to support the capacity and production planning of the modular assembly systems both on the long and medium term horizons. On the higher level, a system configuration problem is solved to assign the product families to dedicated, flexible or reconfigurable resources, considering the uncertainty of the demand volumes. The lower level in the hierarchy ensures the cost optimal production planning of the system by optimizing the lot sizes as well as the required number of resources. The efficiency of the proposed methodology is demonstrated through the results of an industrial case study from the automotive sector. © 2017 The Society of Manufacturing Engineers

[1]  E. Westkämper,et al.  Assembly and Disassembly Processes in Product Life Cycle Perspectives , 2003 .

[2]  Botond Kádár,et al.  Capacity Planning and Resource Allocation in Assembly Systems Consisting of Dedicated and Reconfigurable Lines , 2014 .

[3]  Ahmed M. Deif,et al.  A control approach to explore the dynamics of capacity scalability in reconfigurable manufacturing systems , 2006 .

[4]  G. Zhang,et al.  An Analytical Comparison on Cost and Performance among DMS, AMS, FMS and RMS , 2006 .

[5]  Yoram Koren,et al.  Scalability planning for reconfigurable manufacturing systems , 2012 .

[6]  Alain Bernard,et al.  Product Variety Management , 1998 .

[7]  Waguih ElMaraghy,et al.  Investigating optimal capacity scalability scheduling in a reconfigurable manufacturing system , 2007 .

[8]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .

[9]  Tullio Tolio,et al.  SPECIES—Co-evolution of products, processes and production systems , 2010 .

[10]  Y. Koren,et al.  Manufacturing capacity planning strategies , 2009 .

[11]  Manfredi Bruccoleri,et al.  Economical Models for Reconfigurable Manufacturing Systems , 2006 .

[12]  Joaquim Borges Gouveia,et al.  Product mix strategy and manufacturing flexibility , 2012 .

[13]  Paolo Renna,et al.  A Decision Investment Model to Design Manufacturing Systems based on a genetic algorithm and Monte-Carlo simulation , 2017, Int. J. Comput. Integr. Manuf..

[14]  Steven Peters,et al.  Assessment of flexible quantities and product variants in production , 2010 .

[15]  László Monostori,et al.  Matching Demand and System Structure in Reconfigurable Assembly Systems , 2012 .

[16]  John B. Shoven,et al.  I , Edinburgh Medical and Surgical Journal.

[17]  Mauro Onori,et al.  The IDEAS project: plug & produce at shop‐floor level , 2012 .

[18]  Botond Kádár,et al.  Capacity management for assembly systems with dedicated and reconfigurable resources , 2014 .

[19]  Angelo Oreste Andrisano,et al.  A review on artificial intelligence applications to the optimal design of dedicated and reconfigurable manufacturing systems , 2014, The International Journal of Advanced Manufacturing Technology.

[20]  Goran D. Putnik,et al.  Scalability in manufacturing systems design and operation: State-of-the-art and future developments roadmap , 2013 .

[21]  Ayman M. A. Youssef,et al.  Investigating Best Capacity Scaling Policies for Different Reconfigurable Manufacturing System Scenarios , 2014 .

[22]  Xiuli Meng,et al.  Modeling of reconfigurable manufacturing systems based on colored timed object-oriented Petri nets , 2010 .

[23]  Ahmed Azab,et al.  Change in Manufacturing – Research and Industrial Challenges , 2012 .

[24]  Andrew Kusiak,et al.  Design of assembly systems for modular products , 1997, IEEE Trans. Robotics Autom..

[25]  Hoda A. ElMaraghy,et al.  Transition of interarrival time patterns between automated and manual configurations of assembly systems , 2007 .

[26]  Yoram Koren,et al.  Design of reconfigurable manufacturing systems , 2010 .

[27]  Hoda A. ElMaraghy,et al.  Optimal configuration selection for Reconfigurable Manufacturing Systems , 2007 .

[28]  Hans-Peter Wiendahl,et al.  Changeable and Reconfigurable Assembly Systems , 2009 .

[29]  Hoda A. ElMaraghy,et al.  Smart Adaptable Assembly Systems , 2016 .

[30]  Peter Nyhuis,et al.  Changeable Manufacturing - Classification, Design and Operation , 2007 .

[31]  Yoram Koren,et al.  General RMS Characteristics. Comparison with Dedicated and Flexible Systems , 2006 .

[32]  Steven Peters,et al.  Integrated capacity planning over highly volatile horizons , 2012 .

[33]  Hoda A. ElMaraghy,et al.  Flexible and reconfigurable manufacturing systems paradigms , 2005 .

[34]  Paolo Renna,et al.  Capacity reconfiguration management in reconfigurable manufacturing systems , 2010 .

[35]  Hoda A. ElMaraghy,et al.  Economic and strategic perspectives on investing in RMS and FMS , 2007 .

[36]  Mahmoud Houshmand,et al.  Production planning and performance optimization of reconfigurable manufacturing systems using genetic algorithm , 2011 .

[37]  Yoram Koren,et al.  Co-Evolution of Product Families and Assembly Systems , 2007 .