External Change in Large Engineering Design Projects: The Role of the Client

A problem facing the management of large engineering design projects is: Why do clients often adopt an early commitment strategy on design decision-making when they want to speed up project delivery, yet allow late changes to the project definition to accommodate the resolution of (un)foreseen external uncertainties? Empirical findings illustrate this problem and underpin a 2-stage model of the concept development process, in which conceptualization is followed by design, and stochastic pre-emption simulates asymmetric changes. Simulation experiments demonstrate that when clients make commitments early on in conditions of high uncertainty, they increase the likelihood (upside risk) of speeding up delivery if external events do not materialize; however, if these events do materialize, they increase the likelihood (downside risk) of causing design rework and losing process predictability-especially when the ability to reuse design work after a change is limited. We show that moderate design postponement is appropriate if clients relinquish some of the upside risk of finishing the design sooner. Moderate design postponement does not increase the downside risk of overrunning the delivery completion date in relation to the risk clients incur when they commit earlier because it reduces expected variability in design. These insights highlight the client's role in foreseeing external uncertainties and judiciously instructing changes to design teams. They also demonstrate the applicability of postponement to large engineering design projects where external uncertainty emerges as a fundamental contingency

[1]  Tom R. Burns,et al.  The Management of Innovation. , 1963 .

[2]  Joan C. Woodward Industrial Organization: Theory and Practice , 1966 .

[3]  P. Lawrence,et al.  Organization and Environment: Managing Differentiation and Integration , 1967 .

[4]  Jay R. Galbraith Designing Complex Organizations , 1973 .

[5]  C. Perry,et al.  Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis , 1975 .

[6]  T. Allen Managing the flow of technology , 1977 .

[7]  M. Manen Linking Ways of Knowing with Ways of Being Practical , 1977 .

[8]  T. Jick Mixing Qualitative and Quantitative Methods: Triangulation in Action. , 1979 .

[9]  Henry Mintzberg,et al.  The structuring of organizations : a synthesis of the research , 1980 .

[10]  Daniel Robey,et al.  User Involvement in Information System Development: A Conflict Model and Empirical Test , 1982 .

[11]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[12]  William R. King,et al.  Systems analysis and project management , 1983 .

[13]  Lee W. Schruben,et al.  Simulation modeling with event graphs , 1983, CACM.

[14]  C. Elliot Sigal,et al.  Management Decision Making: A Network Simulation Approach , 1983 .

[15]  Barry M. Staw,et al.  Expo 86: An Escalation Prototype. , 1986 .

[16]  Colin M. Sorrill Risk Analysis for Large Projects: Models, Methods and Cases , 1987 .

[17]  Jeffrey K. Pinto,et al.  Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.

[18]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[19]  R. B. Rowen,et al.  Software project management under incomplete and ambiguous specifications , 1990 .

[20]  David Robertson,et al.  Product development performance: Strategy, organization, and management in the world auto industry , 1992 .

[21]  M. Leahy,et al.  Bioremediation: optimizing results , 1994 .

[22]  Matthew B. Miles,et al.  Qualitative Data Analysis: An Expanded Sourcebook , 1994 .

[23]  J. Morse Designing funded qualitative research. , 1994 .

[24]  Peter W. G. Morris,et al.  The management of projects , 1994 .

[25]  N. Repenning,et al.  Unanticipated side effects of successful quality programs: exploring a paradox of organizational improvement , 1997 .

[26]  Paul S. Adler,et al.  From project to process management: an empirically-based framework for analyzing product development time , 1995 .

[27]  Børge Obel,et al.  The validity of computational models in organization science: From model realism to purpose of the model , 1995, Comput. Math. Organ. Theory.

[28]  Durward K. Sobek,et al.  The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .

[29]  M. Iansiti Shooting the Rapids: Managing Product Development in Turbulent Environments , 1995 .

[30]  G. E. Gibson,et al.  Benchmarking Preproject Planning Effort , 1996 .

[31]  H. Simon,et al.  The sciences of the artificial (3rd ed.) , 1996 .

[32]  Stefan H. Thomke,et al.  The Role of Flexibility in the Development of New Products , 1997 .

[33]  Audley Genus Managing large-scale technology and inter-organizational relations: the case of the Channel Tunnel , 1997 .

[34]  Robert P. Smith,et al.  A predictive model of sequential iteration in engineering design , 1997 .

[35]  Kathleen M. Carley,et al.  A Theoretical Study of Organizational Performance Under Information Distortion , 1997 .

[36]  M. Hobday Product complexity, innovation and industrial organisation , 1998 .

[37]  Aaron J. Shenhar,et al.  From theory to practice: toward a typology of project-management styles , 1998 .

[38]  Yan Jin,et al.  Simulating Project Work Processes and Organizations: Toward a Micro-Contingency Theory of Organizational Design , 1999 .

[39]  M. Engle Book Review: Qualitative Data Analysis: An Expanded Sourcebook (2nd Ed.) , 1999 .

[40]  Anton Geyer,et al.  Managing project–system interfaces: case studies of railway projects in restructured UK and German markets , 2000 .

[41]  D. Gann,et al.  Innovation in project-based, service-enhanced firms: the construction of complex products and systems , 2000 .

[42]  Paul Nightingale,et al.  The product-process-organisation relationship in complex development projects , 2000 .

[43]  A. Davies,et al.  Organisational capabilities and learning in complex product systems: towards repeatable solutions , 2000 .

[44]  Rema Padman,et al.  Project Contracts and Payment Schedules: The Client's Problem , 2001, Manag. Sci..

[45]  A. Prencipe,et al.  Inter-project learning: processes and outcomes of knowledge codification in project-based firms , 2001 .

[46]  Karl T. Ulrich,et al.  Special Issue on Design and Development: Product Development Decisions: A Review of the Literature , 2001, Manag. Sci..

[47]  Aaron J. Shenhar,et al.  One Size Does Not Fit All Projects: Exploring Classical Contingency Domains , 2001, Manag. Sci..

[48]  Christoph H. Loch,et al.  Special Issue on Design and Development: Project Management Under Risk: Using the Real Options Approach to Evaluate Flexibility in R...D , 2001, Manag. Sci..

[49]  Roger Miller,et al.  Strategizing for anticipated risks and turbulence in large-scale engineering projects , 2001 .

[50]  Christoph H. Loch,et al.  On Uncertainty, Ambiguity, and Complexity in Project Management , 2002, Manag. Sci..

[51]  Tyrone S. Pitsis,et al.  Governmentality Matters: Designing an Alliance Culture of Inter-Organizational Collaboration for Managing Projects , 2002 .

[52]  Matthew J. Liberatore,et al.  Factors influencing the usage and selection of project management software , 2003, IEEE Trans. Engineering Management.

[53]  B. Flyvbjerg,et al.  Megaprojects and Risk , 2003 .

[54]  Marton Marosszeky,et al.  Constructing the Olympic Dream: A Future Perfect Strategy of Project Management , 2003, Organ. Sci..

[55]  Mark Keil,et al.  Why software projects escalate: the importance of project management constructs , 2003, IEEE Trans. Engineering Management.

[56]  M. Engwall No project is an island: linking projects to history and context , 2003 .

[57]  B. Flyvbjerg,et al.  Megaprojects and Risk: An Anatomy of Ambition , 2003 .

[58]  Iris D. Tommelein,et al.  Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .

[59]  P. John Clarkson,et al.  Change and customisation in complex engineering domains , 2004 .

[60]  Dov Dvir,et al.  Plans are nothing, changing plans is everything: the impact of changes on project success , 2004 .

[61]  Fred D. Davis,et al.  Toward preprototype user acceptance testing of new information systems: implications for software project management , 2004, IEEE Transactions on Engineering Management.

[62]  Christoph H. Loch,et al.  Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty , 2004, Manag. Sci..

[63]  Iris D. Tommelein,et al.  Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries , 2005 .

[64]  Seth D. Guikema,et al.  Optimal use of budget reserves to minimize technical and management failure risks during complex project development , 2005, IEEE Transactions on Engineering Management.