Assembly Time Modeling through Connective Complexity Metrics

This paper presents the development of a model for predicting the assembly time of a system based on complexity metrics of the system architecture. A convention for modeling architecture is presented, followed by ten analyzed systems. These systems are subjected to complexity metrics developed for other applications. A model is developed based on a recognizable trend and a regression of that trend. The regression is then further refined based on its similarities to additional metrics other than that used in regression. The final model uses average path length, part count, and path length density to predict assembly time to within ±16% of that predicted by the Boothroyd and Dew Hurst design for assembly analysis method.

[1]  Geoffrey Boothroyd,et al.  Product design for manufacture and assembly , 1994, Comput. Aided Des..

[2]  Y. Yamigiwa,et al.  Life cycle design achieving a balance between economic considerations and environmental impact with assembly-disassembly evaluation/design: DAC (design for assembly/disassembly cost-effectiveness) , 1999, Proceedings First International Symposium on Environmentally Conscious Design and Inverse Manufacturing.

[3]  G. Boothroyd,et al.  Assembly Automation and Product Design , 1991 .

[4]  Just L. Herder,et al.  Design of a Statically Balanced Tensegrity Mechanism , 2006 .

[5]  Minoru Iwata,et al.  Extended Assemblability Evaluation Method (AEM) , 2002 .

[6]  Geoffrey Boothroyd Assembly Automation and Product Design, Second Edition (Manufacturing Engineering and Materials Processing) , 2005 .

[7]  H. J. Warnecke,et al.  Design for Assembly — Part of the Design Process , 1988 .

[8]  James L. Mathieson,et al.  Complexity Metrics for Directional Node-Link System Representations: Theory and Applications , 2010 .

[9]  Gregory M. Mocko,et al.  Engineering design complexity: an investigation of methods and measures , 2008 .

[10]  Joshua D. Summers,et al.  Reasoning: Source of Variability in the Boothroyd and Dewhurst Assembly Time Estimation Method , 2012 .

[11]  G. Boothroyd,et al.  Design for Assembly and Disassembly , 1992 .

[12]  Jami J. Shah,et al.  Mechanical Engineering Design Complexity Metrics: Size, Coupling, and Solvability , 2010 .

[13]  A. H. Redford,et al.  Design for Assembly , 1983, Methods and Tools for Computer Integrated Manufacturing.

[14]  Christian Mascle Decision support system in a design for assembly and desassembly methodology , 2003, Proceedings of the IEEE International Symposium onAssembly and Task Planning, 2003..

[15]  Joshua D. Summers,et al.  Information Generation in the Design Process , 2009 .

[16]  Jack M. Walker,et al.  Handbook of manufacturing engineering , 1996 .

[17]  Jian S. Dai,et al.  Proceedings of the ASME 2010 International Design Engineering Technical Conferences & Computers and Information in Engineering Conference , 2006 .

[18]  Ieee Robotics,et al.  Proceedings of the 2003 IEEE International Symposium on Assembly and Task Planning (ISATP2003) : from the assembly and disassembly of manufactured products to the design and manufacturing of micromachines, July 10-11, 2003, Besançon, France, , 2003 .

[19]  Graham Jared,et al.  Design for assembly: Influencing the design process , 2000 .

[20]  K. G. Swift,et al.  Design for assembly , 1983 .

[21]  Guo Q. Huang,et al.  Design for X : concurrent engineering imperatives , 1996 .

[22]  Joshua D. Summers,et al.  Relational DSMs in Connectivity Complexity Measurement , 2009 .