A bi-objective multi-period series-parallel inventory-redundancy allocation problem with time value of money and inflation considerations
暂无分享,去创建一个
Madjid Tavana | Raja Ariffin Raja Ghazilla | Ezutah Udoncy Olugu | Seyed Mohsen Mousavi | Najmeh Alikar | M. Tavana | S. Mousavi | E. U. Olugu | R. Ghazilla | Najmeh Alikar
[1] Qingwei Chen,et al. Multi-objective reliability redundancy allocation in an interval environment using particle swarm optimization , 2016, Reliab. Eng. Syst. Saf..
[2] Lothar Thiele,et al. Multiobjective Optimization Using Evolutionary Algorithms - A Comparative Case Study , 1998, PPSN.
[3] B. Sarkar,et al. An inventory model with variable demand, component cost and selling price for deteriorating items , 2013 .
[4] Yoshikazu Fukuyama,et al. Practical distribution state estimation using hybrid particle swarm optimization , 2001, 2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194).
[5] Seyed Taghi Akhavan Niaki,et al. A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: An NSGA-II with tuned parameters , 2014, Comput. Oper. Res..
[6] TavanaMadjid,et al. A bi-objective inventory optimization model under inflation and discount using tuned Pareto-based algorithms , 2016 .
[7] Jinn-Tsair Teng,et al. Two inventory systems with trapezoidal-type demand rate and time-dependent deterioration and backlogging , 2016, Expert Syst. Appl..
[8] Seyed Hamid Reza Pasandideh,et al. A priority-based modified encoding–decoding procedure for the design of a bi-objective SC network using meta-heuristic algorithms , 2016 .
[9] Biswajit Sarkar,et al. An EOQ model with delay in payments and time varying deterioration rate , 2012, Math. Comput. Model..
[10] R. Eberhart,et al. Empirical study of particle swarm optimization , 1999, Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No. 99TH8406).
[11] Biswajit Sarkar,et al. Easy and Improved Algorithms to Joint Determination of the Replenishment Lot Size and Number of Shipments for an Epq Model with Rework , 2013 .
[12] B. Sarkar. Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products , 2016 .
[13] Samad Ahmadi,et al. Optimizing a bi-objective reliable facility location problem with adapted stochastic measures using tuned-parameter multi-objective algorithms , 2016, Knowl. Based Syst..
[14] Steven Li,et al. Solving the redundancy allocation problem with multiple strategy choices using a new simplified particle swarm optimization , 2015, Reliab. Eng. Syst. Saf..
[15] Madjid Tavana,et al. A bi-objective inventory optimization model under inflation and discount using tuned Pareto-based algorithms: NSGA-II, NRGA, and MOPSO , 2016, Appl. Soft Comput..
[16] Jason R. Schott. Fault Tolerant Design Using Single and Multicriteria Genetic Algorithm Optimization. , 1995 .
[17] Seyed Hamid Reza Pasandideh,et al. A bi-objective remanufacturing problem within queuing framework: An imperialist competitive algorithm , 2015 .
[18] H. S. Shukla,et al. Economic production quantity model for defective items under deterioration , 2016 .
[19] Seyed Taghi Akhavan Niaki,et al. Optimizing multi-item multi-period inventory control system with discounted cash flow and inflation: Two calibrated meta-heuristic algorithms , 2013 .
[20] B. Sarkar,et al. Partial Trade-Credit Policy of Retailer with Exponentially Deteriorating Items , 2015 .
[21] Seyed Taghi Akhavan Niaki,et al. Two parameter tuned multi-objective evolutionary algorithms for a bi-objective vendor managed inventory model with trapezoidal fuzzy demand , 2015, Appl. Soft Comput..
[22] Mostafa Zandieh,et al. Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach , 2010, Expert Syst. Appl..
[23] Biswajit Sarkar,et al. Retailer’s optimal strategy for fixed lifetime products , 2016, Int. J. Mach. Learn. Cybern..
[24] Ehsan Ameri,et al. A robust loss function approach for a multi-objective redundancy allocation problem , 2016 .
[25] BahreininejadArdeshir,et al. Optimizing a location allocation-inventory problem in a two-echelon supply chain network , 2015 .
[26] Seyed Taghi Akhavan Niaki,et al. An improved fruit fly optimization algorithm to solve the homogeneous fuzzy series–parallel redundancy allocation problem under discount strategies , 2016, Soft Comput..
[27] Wei Xie,et al. Maximizing system availability through joint decision on component redundancy and spares inventory , 2014, Eur. J. Oper. Res..
[28] Seyed Taghi Akhavan Niaki,et al. An efficient memory-based electromagnetism-like mechanism for the redundancy allocation problem , 2016, Appl. Soft Comput..
[29] Nirmal Kumar Duari,et al. A cash flow-oriented EOQ model of deteriorating items with increasing demand rate and shortages under permissible delay in payment , 2015 .
[30] Madjid Tavana,et al. Multi-objective multi-layer congested facility location-allocation problem optimization with Pareto-based meta-heuristics , 2016 .
[31] B. Sarkar,et al. Variable deterioration and demand—An inventory model , 2013 .
[32] Biswajit Sarkar,et al. A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .
[33] Kannan Govindan,et al. Two-echelon multiple-vehicle location-routing problem with time windows for optimization of sustainable supply chain network of perishable food , 2014 .
[34] Adrijit Goswami,et al. A two-warehouse inventory model with increasing demand and time varying deterioration , 2012 .
[35] Dharmendra Yadav,et al. Retailer's optimal policy under inflation in fuzzy environment with trade credit , 2015, Int. J. Syst. Sci..
[36] Shyamal Kumar Mondal,et al. Two storage inventory problem with dynamic demand and interval valued lead-time over finite time horizon under inflation and time-value of money , 2008, Eur. J. Oper. Res..
[37] Ardeshir Bahreininejad,et al. Optimizing a location allocation-inventory problem in a two-echelon supply chain network: A modified fruit fly optimization algorithm , 2015, Comput. Ind. Eng..
[38] Neeraj Kumar,et al. Effect of learning and salvage worth on an inventory model for deteriorating items with inventory-dependent demand rate and partial backlogging with capability constraints , 2016 .
[39] Sarla Pareek,et al. Fuzzy EOQ models for deterioration items under discounted cash flow approach when supplier credits are linked to order quantity , 2015 .
[40] Seyed Taghi Akhavan Niaki,et al. Three self-adaptive multi-objective evolutionary algorithms for a triple-objective project scheduling problem , 2015, Comput. Ind. Eng..
[41] S. Niaki,et al. Two tuned multi-objective meta-heuristic algorithms for solving a fuzzy multi-state redundancy allocation problem under discount strategies , 2015 .
[42] Ardeshir Bahreininejad,et al. A modified particle swarm optimization for solving the integrated location and inventory control problems in a two-echelon supply chain network , 2014, Journal of Intelligent Manufacturing.
[43] Sachin Maheshwari,et al. Multi-objective optimization of electric-discharge machining process using controlled elitist NSGA-II , 2012 .
[44] Isha Sangal,et al. A two-warehouse production inventory model with trade credit under reliability consideration , 2016 .
[45] Leopoldo Eduardo Cárdenas-Barrón,et al. An inventory model with trade-credit policy and variable deterioration for fixed lifetime products , 2015, Ann. Oper. Res..
[46] S. Singh,et al. A reverse logistic inventory model for imperfect production process with preservation technology investment under learning and inflationary environment , 2016 .
[47] Genqi Xu,et al. Stability analysis of a complex standby system with constant waiting and different repairman criteria incorporating environmental failure , 2009 .
[48] Seyed Taghi Akhavan Niaki,et al. Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: NSGA-II and NRGA , 2015, Inf. Sci..
[49] M. Maiti,et al. A production-repairing inventory model with fuzzy rough coefficients under inflation and time value of money , 2013 .
[50] Biswajit Sarkar,et al. Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..
[51] Shib Sankar Sana,et al. Optimal reliability, production lotsize and safety stock: an economic manufacturing quantity model , 2010 .