Navigating mega projects through complexity and uncertainty: strategic and adaptive capacity in planning and decision-making

Over the last few decades, there has been an increasing interest in mega projects from both policy makers and academics. Of particular concern to both has been the seemingly structural time and cost overruns associated with these projects. In response a tendency, especially of policy makers, has been to look for ways of simplifying the decision and planning process. In academia the focus has been more on how to increase transparency and accountability in an attempt to prevent issues such as strategic misrepresentation or optimism bias, and on more adaptive project management to be more responsive to changes in the context of a project and within the project itself. And so it seems that policy and academia address the same problem, but are diverging into different directions concerning the solution. This dissertation develops concepts of strategic and adaptive capacity in order to analyse mega project planning and decision-making. Three Dutch infrastructure projects are examined. The HSL-Zuid is a high speed line running from Amsterdam to Brussels. RandstadRail is an inter-regional light-rail project between Rotterdam and The Hague. The Beneluxlijn is a metro extension in the Rotterdam region and forms a link between two already existing lines. The research shows that the tendency, especial

[1]  Shomik Raj Mehndiratta,et al.  Options Approach to Risk Analysis in Transportation Planning , 2000 .

[2]  A. Strauss,et al.  The discovery of grounded theory: strategies for qualitative research aldine de gruyter , 1968 .

[3]  Kathleen M. Sutcliffe,et al.  Mindfulness and the Quality of Organizational Attention , 2006, Organ. Sci..

[4]  Vincent Marchau,et al.  An Adaptive Approach to Implementing Innovative Urban Transport Solutions , 2008 .

[5]  Luca Bertolini,et al.  Evolutionary Urban Transportation Planning: An Exploration , 2007 .

[6]  D. Banister,et al.  Assessment of large transport infrastructure projects: The CBA-DK model , 2008, 2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA).

[7]  Edward Chuma,et al.  Enhancing the adaptive capacity of the resource users in natural resource management , 2002 .

[8]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[9]  Erik-Hans Klijn,et al.  Institutional and Strategic Barriers to Public-Private Partnership: , 2007 .

[10]  David Byrne,et al.  Complexity, Configurations and Cases , 2005 .

[11]  Martijn Leijten,et al.  Megaprojects and Contested Information , 2007 .

[12]  E. Swyngedouw,et al.  Neoliberal Urbanization in Europe: Large–Scale Urban Development Projects and the New Urban Policy , 2002 .

[13]  Richard J. T. Klein,et al.  An Anatomy of Adaptation to Climate Change and Variability , 2000 .

[14]  M. Wolsink Reshaping the Dutch Planning System: A Learning Process? , 2003 .

[15]  Frank Moulaert,et al.  Urban Restructuring, Social-Political Polarization and New Urban Policies , 2003 .

[16]  Marcel Veenswijk,et al.  Managing public–private megaprojects: Paradoxes, complexity, and project design , 2008 .

[17]  J. Koppenjan The Formation of Public‐Private Partnerships: Lessons from Nine Transport Infrastructure Projects in The Netherlands , 2005 .

[18]  Christoph H. Loch,et al.  Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty , 2004, Manag. Sci..

[19]  Lisa Kane,et al.  Changes in transport planning policy: Changes in transport planning methodology? , 2003 .

[20]  Peter M. Allen,et al.  A COMPLEX SYSTEMS APPROACH TO LEARNING IN ADAPTIVE NETWORKS , 2001 .

[21]  J. Handmer,et al.  Uncertainty, sustainability and change☆ , 1992 .

[22]  T. Terano Beyond the KISS Principle for Agent-Based Social Simulation , 2008 .

[23]  Martin J. Eppler,et al.  Harvesting project knowledge: a review of project learning methods and success factors , 2003 .

[24]  Hugo Priemus,et al.  Mega-projects: Dealing with Pitfalls , 2010 .

[25]  Søren L. Buhl,et al.  How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation , 2005, 1303.6654.

[26]  D. North Competing Technologies , Increasing Returns , and Lock-In by Historical Events , 1994 .

[27]  J. Spanje,et al.  Immigration, Europe and the ‘new’ cultural dimension , 2009 .

[28]  Robin Gregory,et al.  Using decision analysis to encourage sound deliberation: water use planning in British Columbia, Canada , 2002 .

[29]  H. Simon Bounded Rationality and Organizational Learning , 1991 .

[30]  C. S. Holling,et al.  Resilience and Sustainable Development: Building Adaptive Capacity in a World of Transformations , 2002, Ambio.

[31]  Francis Tekyi Edum-Fotwe,et al.  Socio-organo complexity and project performance , 2011 .

[32]  Hugo Priemus,et al.  Development and Design of Large Infrastructure Projects: Disregarded Alternatives and Issues of Spatial Planning , 2007 .

[33]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[34]  Roderick E. White,et al.  An Organizational Learning Framework : From Intuition to Institution Author ( s ) : , 2007 .

[35]  Steen Leleur,et al.  Modelling decision support and uncertainty for large transport infrastructure projects: The CLG-DSS model of the Øresund Fixed Link , 2007, Decis. Support Syst..

[36]  Donald R. Lessard,et al.  Evolving Strategy: Risk Management and the Shaping of Mega-Projects , 2008 .

[37]  Søren L. Buhl,et al.  Inaccuracy in Traffic Forecasts , 2006 .

[38]  Werner Rothengatter,et al.  Big decisions, big risks: improving accountability in mega projects , 1998 .

[39]  Peter Y. T. Sun Exploring the Divide--Organizational Learning and Learning Organization. , 2003 .

[40]  Luca Bertolini,et al.  Coping with the irreducible uncertainties of planning: an evolutionary approach , 2010 .

[41]  Willem Salet,et al.  Framing Strategic Urban Projects : Learning from current experiences in European urban regions , 2006 .

[42]  A. Smits Moving close to parents and adult children in the Netherlands: the influence of support needs , 2010 .

[43]  Leo G. Kroon,et al.  Decision Support Systems Support the Search for Win-Win Solutions in Railway Network Design , 1999, Interfaces.

[44]  John Kenny,et al.  Strategy and the Learning Organization: A Maturity Model for the Formation of Strategy. , 2006 .

[45]  Bent Flyvbjerg,et al.  Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures , 2005, 1303.7400.

[46]  Hans Bruijn,et al.  Process arrangements for variety, retention, and selection , 2004 .

[47]  A. Shenhar,et al.  Project Success: A Multidimensional Strategic Concept , 2001 .

[48]  J. Guthrie,et al.  Driving privately financed projects in Australia: what makes them tick? , 2003 .

[49]  B. Wee,et al.  Decision-making on mega-projects: Cost–benefit analysis, planning, and innovation , 2008 .

[50]  Karen Trapenberg Frick,et al.  The Cost of the Technological Sublime: Daring Ingenuity and the new San Francisco-Oakland Bay Bridge , 2008 .

[51]  J. Norberg,et al.  ADAPTIVE GOVERNANCE OF SOCIAL-ECOLOGICAL SYSTEMS , 2005 .

[52]  Herman A. Karl,et al.  A Dialogue, Not a Diatribe: Effective Integration of Science and Policy through Joint Fact Finding , 2007 .

[53]  P. Hall,et al.  Political Science and the Three New Institutionalisms , 1996 .

[54]  Scott D. Sagan,et al.  Learning from Normal Accidents , 2004 .

[55]  H. Bruijn,et al.  An Open Process , 2010 .

[56]  Ludovic-Alexandre Vidal,et al.  Measuring project complexity using the Analytic Hierarchy Process , 2011 .

[57]  P. Healey Institutionalist Analysis, Communicative Planning, and Shaping Places , 1999 .

[58]  M. Landau Redundancy, Rationality, and the Problem of Duplication and Overlap , 1969 .

[59]  A. Georges L. Romme,et al.  Circular organizing and triple loop learning , 1999 .

[60]  T. Downing,et al.  Societal Vulnerability to Climate Change and Variability , 1999 .

[61]  Wijnand Veeneman,et al.  Dealing with Competing Project Management Values under Uncertainty: The Case of RandstadRail , 2010 .

[62]  C. Chabris,et al.  Gorillas in Our Midst: Sustained Inattentional Blindness for Dynamic Events , 1999, Perception.

[63]  Decision-making on Mega-projects: Drifting on Political Discontinuity and Market Dynamics , 2010 .

[64]  John S. Dryzek,et al.  Complexity and Rationality in Public Life , 1987 .

[65]  Donald A. Schön,et al.  Frame-critical policy analysis and frame-reflective policy practice , 1996 .

[66]  P. Shrivastava A TYPOLOGY OF ORGANIZATIONAL LEARNING SYSTEMS , 1983 .

[67]  Keith R. Molenaar,et al.  Construction Project Cost Escalation Factors , 2009 .

[68]  Oddgeir Osland,et al.  The Politics and Institutions of Project Approval - a Critical-Constructive Comment on the Theory of Strategic Misrepresentation , 2010, European Journal of Transport and Infrastructure Research.

[69]  Andreas Faludi,et al.  The ‘IOR School’: The Development of a Planning Methodology , 1982 .

[70]  M. Easterby-Smith Disciplines of Organizational Learning: Contributions and Critiques , 1997 .

[71]  Chantal C. Cantarelli,et al.  Cost Overruns in Large-scale Transport Infrastructure Projects - A theoretical and empirical exploration for the Netherlands and worldwide , 2011 .

[72]  David Dryden Henningsen,et al.  Examining the Symptoms of Groupthink and Retrospective Sensemaking , 2006 .

[73]  Wijnand Veeneman,et al.  Competing management approaches in large engineering projects: The Dutch RandstadRail project , 2011 .

[74]  J. de Vries,et al.  Breaking the Deadlock: Lessons from Cross-Border Spatial Projects in Flanders and the Netherlands , 2008 .

[75]  Ennio Cascetta,et al.  Integrated railways-based policies: The Regional Metro System (RMS) project of Naples and Campania , 2008 .

[76]  Hugo Priemus Decision-making on Large Infrastructure Projects: The Role of the Dutch Parliament , 2007 .

[77]  Bent Flyvbjerg,et al.  From Nobel Prize to Project Management: Getting Risks Right , 2006, ArXiv.

[78]  Anne S. Miner,et al.  Ugly Duckling No More: Pasts and Futures of Organizational Learning Research , 1996 .

[79]  Ralph L. Keeney,et al.  Value-Focused Thinking , 1996 .

[80]  A. Nelson Mega-Projects: The Changing Politics of Urban Public Investment , 2004 .

[81]  Past Abuses and Future Uses of Private Finance and Public Private Partnerships in Transport , 1999 .

[82]  H. Rittel,et al.  Dilemmas in a general theory of planning , 1973 .

[83]  Anthony D. Songer,et al.  Risk analysis for revenue dependent infrastructure projects , 1997 .

[84]  Bent Flyvbjerg,et al.  Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in Practice , 2008 .

[85]  Janice Thomas,et al.  Preparing project managers to deal with complexity–advanced project management education , 2008, IEEE Engineering Management Review.

[86]  John Forester,et al.  Making Participation Work When Interests Conflict: Moving from Facilitating Dialogue and Moderating Debate to Mediating Negotiations , 2006 .

[87]  K. Miyamoto,et al.  A decision support system for integrating land use, transport and environmental planning in developing metropolises , 1996 .

[88]  Robert Joumard,et al.  Transport project assessment methodology within the framework of sustainable development , 2010 .

[89]  R. Boschma,et al.  Evolutionary economics and economic geography , 1999 .

[90]  D. Teece,et al.  DYNAMIC CAPABILITIES AND STRATEGIC MANAGEMENT , 1997 .

[91]  Matti Siemiatycki,et al.  Delivering Transportation Infrastructure Through Public-Private Partnerships: Planning Concerns , 2009 .

[92]  Alexander Verbraeck,et al.  Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework , 2011 .

[93]  Chris Chapman,et al.  Transforming project risk management into project uncertainty management , 2003 .

[94]  Ernest R. Alexander,et al.  Rationality Revisited: Planning Paradigms in a Post-Postmodernist Perspective , 2000 .

[95]  E. Ostrom,et al.  The Struggle to Govern the Commons , 2003, Science.

[96]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[97]  C. S. Holling,et al.  Insight, part of a Special Feature on Exploring Resilience in Social-Ecological Systems Shooting the Rapids: Navigating Transitions to Adaptive Governance of Social-Ecological Systems , 2006 .

[98]  R. Larossa,et al.  Grounded Theory Methods and Qualitative Family Research. , 2005 .

[99]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[100]  P. David Clio and the Economics of QWERTY , 1985 .

[101]  S. Musterd,et al.  Bridging the social divide? reflections on current Dutch neighbourhood policy , 2009 .

[102]  Vincent Marchau,et al.  Dynamic adaptive transport policies for handling deep uncertainty , 2010 .