Get the cogs in synch: time horizon aspects of industry--academia collaboration

In industry--academia collaboration projects, there are many issues related to different time horizons in industry and academia. If not adressed upfront, they may hinder collaboration in such projects. We analyze our experiences from a 10 year industry--academia collaboration program, the EASE Industrial Excellence Center in Sweden, and identify issues and feasible practices to overcome the hurdles of different time horizons. Specifically, we identify issues related to contracts, goals, results, organization (in)stability, and work practices. We identify several areas where the time horizon is different, and conclude that mutual awareness of these differences and management commitment to the collaboration are the key means to overcome the differences. The launch of a mediating institute may also be part of the solution.

[1]  Per Runeson It Takes Two to Tango -- An Experience Report on Industry -- Academia Collaboration , 2012, 2012 IEEE Fifth International Conference on Software Testing, Verification and Validation.

[2]  Per Runeson,et al.  Alignment practices affect distances in software development: a theory and a model , 2014, GTSE 2014.

[3]  Tony Gorschek,et al.  A Model for Technology Transfer in Practice , 2006, IEEE Software.

[4]  Lefteris Angelis,et al.  The Success Factors Powering Industry-Academia Collaboration , 2012, IEEE Software.

[5]  Thomas Arts,et al.  Agile Collaborative Research: Action Principles for Industry-Academia Collaboration , 2011, IEEE Software.

[6]  Håkan Grahn,et al.  Heuristics for Thread-Level Speculation in Web Applications , 2014, IEEE Computer Architecture Letters.

[7]  Claes Wohlin Empirical software engineering research with industry: Top 10 challenges , 2013, 2013 1st International Workshop on Conducting Empirical Studies in Industry (CESI).

[8]  Austen Rainer,et al.  Case Study Research in Software Engineering - Guidelines and Examples , 2012 .

[9]  Boris Magnusson,et al.  Some like it hot: automating an electric kettle using PalCom , 2013, UbiComp.

[10]  Per Runeson,et al.  The 4+1 view model of industry--academia collaboration , 2014, WISE@ASE.

[11]  Martin Höst,et al.  Network Analysis of a Large Scale Open Source Project , 2014, 2014 40th EUROMICRO Conference on Software Engineering and Advanced Applications.

[12]  Tony Gorschek,et al.  Challenges and practices in aligning requirements with verification and validation: a case study of six companies , 2013, Empirical Software Engineering.