Analysis of Measures for Managing Issues in Post-Disaster Housing Reconstruction
暂无分享,去创建一个
[1] P. Murphy,et al. Logistics of Famine Relief , 1995 .
[2] E. Seville,et al. Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions , 2011 .
[3] Corrado Minervini. Housing reconstruction in Kosovo , 2002 .
[4] R. Ulrich. Evidence-based healthcare architecture , 2006 .
[5] Dina Battisto,et al. A Standardized Case Study Framework and Methodology to Identify “Best Practices” , 2013 .
[6] R. Olshansky,et al. Disaster and Recovery: Processes Compressed in Time , 2012 .
[7] S. Wilkinson,et al. “Build Back Better” Principles for Reconstruction , 2014 .
[8] Lynn Nielsen-Bohlman,et al. The toolkit. , 2003, Occasional paper.
[9] Iftekhar Ahmed,et al. An overview of post‐disaster permanent housing reconstruction in developing countries , 2011 .
[10] David R. Godschalk,et al. Urban Hazard Mitigation: Creating Resilient Cities , 2003 .
[11] Allreza Fallahi. Lessons Learned from the Housing Reconstruction Following the Bam Earthquake in Iran , 2007 .
[12] Michal Lyons,et al. Building Back Better: The Large-Scale Impact of Small-Scale Approaches to Reconstruction , 2009 .
[13] Michele Magni,et al. Communicating with communities (CwC) during post-disaster reconstruction: an initial analysis , 2016, Natural Hazards.
[14] Abhas K. Jha,et al. Safer Homes, Stronger Communities: A Handbook for Reconstructing After Natural Disasters , 2010 .
[15] Suzanne Wilkinson,et al. An integrated approach: managing resources for post-disaster reconstruction , 2011 .
[16] Thomas J. Campanella,et al. Planning for Postdisaster Resiliency , 2006 .
[17] Jennifer Duyne Barenstein,et al. Housing reconstruction in post-earthquake Gujarat: A comparative analysis. , 2006 .
[18] Theo Schilderman,et al. Resilient dwellings or resilient people? Towards people-centred reconstruction , 2011 .
[19] Suzanne Wilkinson,et al. Resourcing for post‐disaster reconstruction: a comparative study of Indonesia and China , 2012 .
[20] David A. McEntire,et al. Emergent Phenomena and Multiorganizational Coordination in Disasters: Lessons from the Research Literature , 2002, International Journal of Mass Emergencies & Disasters.
[21] Ravindra K. Pande,et al. Resettlement and rehabilitation issues in Uttaranchal (India) with reference to natural disasters , 2007 .
[22] Joel F. Audefroy,et al. Post-disaster emergency and reconstruction experiences in Asia and Latin America: an assessment , 2010 .
[23] Richard L. Tucker,et al. Multiskilled Labor Utilization Strategies in Construction , 1998 .
[24] Paolo Tombesi,et al. Towards a more “robust” technology? Capacity building in post‐tsunami Sri Lanka , 2008 .
[25] Klaus Rohland and Sarah Cliffe,et al. The East Timor reconstruction program : successes, problems and tradeoffs , 2002 .
[26] A. W. Al-Khafaji,et al. Communication in Stakeholder Management , 2010 .
[27] E. Quarantelli,et al. A Brief Note on Disaster Restoration, Reconstruction and Recovery: A Comparative Note Using Post Earthquake Observations , 2008 .
[28] Tun Lin Moe,et al. An integrated approach to natural disaster management , 2006 .
[29] Gyöngyi Kovács,et al. A community-based approach to supply chain design , 2010 .
[30] Sisira Jayasuriya,et al. Reconstruction after a major disaster: Lessons from the post-Tsunami experience in Indonesia, Sri Lanka, and Thailand , 2008 .
[31] B. Ferguson,et al. A financial framework for reducing slums: lessons from experience in Latin America , 2003 .
[32] C. Boano. Housing anxiety and multiple geographies in post-tsunami Sri Lanka. , 2009, Disasters.
[33] Richard Haigh,et al. Exploring good practice knowledge transfer related to post tsunami housing re-construction in Sri Lanka , 2008 .
[34] Rdg Amaratunga,et al. Community based post disaster housing reconstruction: Indonesian perspective , 2010 .
[35] Joseph Ashmore,et al. The Meaning of Build Back Better: Evidence from Post-Tsunami Aceh and Sri Lanka , 2008 .
[36] Florian Steinberg,et al. Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia—Rebuilding lives☆ , 2007 .
[37] Emlyn Witt,et al. An analysis of issues for the management of post-disaster housing reconstruction , 2016 .
[38] Build Change. Homeowner-driven housing reconstruction and retrofitting in Haiti : lessons learned, 4 years after the earthquake. , 2014 .
[39] S. Barakat. Housing reconstruction after conflict and disaster , 2003 .
[40] Cassidy Johnson,et al. Truths and myths about community participation in post-disaster housing projects , 2007 .
[41] Oriol Pons,et al. Multicriteria Decision-Making Method for Sustainable Site Location of Post-Disaster Temporary Housing in Urban Areas , 2016 .
[42] C. Benson,et al. Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations , 2007 .
[43] G. Kovács,et al. Designing Post-Disaster Supply Chains : Learning from Housing Reconstruction Projects , 2015 .
[44] Bassam Baroudi,et al. Stakeholder management in disaster restoration projects , 2014 .
[45] M. Lindell,et al. Housing reconstruction after two major earthquakes: the 1994 Northridge earthquake in the United States and the 1999 Chi-Chi earthquake in Taiwan. , 2004, Disasters.
[46] T. Ophiyandri. Community‐Based Post‐Disaster Housing Reconstruction: Examples from Indonesia , 2011 .
[47] Amin Akhavan Tabassi,et al. Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran , 2009 .
[48] Tarek Hegazy,et al. In-House Delivery of Multiple-Small Reconstruction Projects , 2004 .
[49] K. Srinivasan,et al. Operating decisions, supplier availability and quality: An empirical study , 1995 .
[50] Murat Tas,et al. Study on permanent housing production after 1999 earthquake in Kocaeli (Turkey) , 2010 .
[51] Mahmood Hosseini,et al. Post-Bam earthquake: recovery and reconstruction , 2008 .
[52] Jo da Silva,et al. Lessons from Aceh: Key Considerations in Post-Disaster Reconstruction , 2010 .
[53] Nicolas Faysse,et al. Troubles on the way: An analysis of the challenges faced by multi-stakeholder platforms , 2006 .
[54] Christine Wamsler,et al. Mainstreaming risk reduction in urban planning and housing: a challenge for international aid organisations. , 2006, Disasters.
[55] Theo Schilderman,et al. Building Back Better: Delivering people-centred housing reconstruction at scale , 2010 .
[56] Thayaparan Gajendran,et al. Organising the management of disaster recovery and construction: a built environment perspective , 2013 .
[57] Suzanne Wilkinson,et al. BUILD BACK BETTER: LESSONS FROM SRI LANKA’S RECOVERY FROM THE 2004 INDIAN OCEAN TSUNAMI , 2013 .
[58] Mundia Muya,et al. Risk identification on community‐based construction projects in Zambia , 2008 .
[59] Suzanne Wilkinson,et al. Improving construction sector resilience , 2016 .
[60] Thomas Moullier. Building regulation for resilience : managing risks for safer cities , 2015 .
[61] Elizabeth Maly,et al. Planning for relocation in recovery after the Great East Japan Earthquake , 2014 .
[62] Dilanthi Amaratunga,et al. An integrative review of the built environment discipline's role in the development of society's resilience to disasters , 2010 .
[63] Gavin Smith,et al. Planning for Resiliency: Evaluation of State Hazard Mitigation Plans under the Disaster Mitigation Act , 2012 .
[64] A Oliver-Smith,et al. Successes and failures in post-disaster resettlement. , 1991, Disasters.
[65] Carolyn Hayles,et al. An examination of decision making in post disaster housing reconstruction , 2010 .
[66] Andrew Price,et al. Integrating disaster risk management into construction: a UK perspective , 2007 .
[67] Suahasil Nazara,et al. Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006 , 2007 .
[68] R. Haigh,et al. Strategies for the effective engagement of multi-national construction enterprises in post-disaster building and infrastructure projects , 2012 .
[69] Li Zhang,et al. Cooperative Exchange: Rewards and Risks , 1992 .
[72] Oriol Pons,et al. Multi-criteria decision-making method for assessing the sustainability of post-disaster temporary housing units technologies: A case study in Bam, 2003 , 2016 .
[73] Dilanthi Amaratunga,et al. Critical success factors for community‐based post‐disaster housing reconstruction projects in the pre‐construction stage in Indonesia , 2013 .
[74] A. Dainty,et al. Resolving the UK construction skills crisis: a critical perspective on the research and policy agenda , 2007 .
[75] R. Ulrich. Essay: Evidence-based health-care architecture , 2006, The Lancet.
[76] P. Berke,et al. Recovery after disaster: achieving sustainable development, mitigation and equity. , 1993, Disasters.
[77] Suzanne Wilkinson,et al. Identifying factors affecting resource availability for post‐disaster reconstruction: a case study in China , 2011 .
[78] Suzanne Wilkinson,et al. Resourcing challenges for post-disaster housing reconstruction: a comparative analysis , 2010 .
[79] Florian Steinberg,et al. Rebuilding Lives and Homes in Aceh and Nias, Indonesia , 2010 .
[80] Jacqueline Glass,et al. Realising a resilient and sustainable built environment: towards a strategic agenda for the United Kingdom. , 2007, Disasters.
[81] Philip Berke,et al. Searching for the Good Plan , 2009 .
[82] Mehran Gharaati,et al. Who Knows Best? An Overview of Reconstruction after the Earthquake in Bam, Iran , 2008 .
[83] Suzanne Wilkinson,et al. Managing resources in disaster recovery projects , 2012 .
[84] Irene Lill,et al. A Framework for Managing Post-disaster Housing Reconstruction☆ , 2015 .
[85] H. Ping Tserng,et al. Developing a resource supply chain planning system for construction projects , 2006 .
[86] Stefan Olander,et al. Stakeholder impact analysis in construction project management , 2007 .
[87] Chaminda Pathirage,et al. Risk identification on community based post disaster housing reconstruction projects , 2011 .
[88] Arturas Kaklauskas,et al. Enhancing post-disaster reconstruction capacity through lifelong learning in higher education , 2015 .
[89] Kaushal Keraminiyage,et al. Long-term satisfaction of post disaster resettled communities : the case of post tsunami – Sri Lanka , 2016 .
[90] Jo da Silva,et al. Indonesia: Understanding agency policy in a national context , 2010 .
[91] J Twigg,et al. Characteristics of a Disaster-resilient Community: A Guidance Note , 2007 .
[92] Federica Ranghieri,et al. Learning from Megadisasters : lessons from the great east Japan earthquake , 2014 .
[93] C. Thorburn. The Acehnese Gampong Three Years On: Assessing Local Capacity and Reconstruction Assistance in Post-tsunami Aceh , 2007 .
[94] Victoria M. Edwards,et al. Platforms for collective action in multiple-use common-pool resources , 1999 .
[95] Low Sui Pheng,et al. Tsunamis: Some pre‐emptive disaster planning and management issues for consideration by the construction industry , 2006 .
[96] Lukumon O. Oyedele,et al. Linking organisational competency to project success in post-disaster reconstruction , 2014 .
[97] Mikko Koria. Managing for innovation in large and complex recovery programmes: Tsunami lessons from Sri Lanka , 2009 .
[98] J. Pantelić. The link between reconstruction and development , 1991 .
[99] P. Daly,et al. Aid Accountability and Participatory Approaches in Post-Disaster Housing Reconstruction , 2011 .
[100] J. Turner. Housing By People: Towards Autonomy in Building Environments , 1977 .