Analysis of Measures for Managing Issues in Post-Disaster Housing Reconstruction

After large scale disasters, reconstruction is often initiated by stakeholders to minimize disaster impacts and to mitigate a recurrence. For most reconstruction programmes, priority is given to reconstruction of permanent housing in consideration of the multiplying effects of housing reconstruction on social and economic recovery and the development of community resilience. However, numerous challenges arise during implementation which have reportedly been poorly managed and this has resulted in the ineffectiveness of housing reconstruction programmes and the failure of housing interventions to achieve their intended goals. In previous, related research, the issues affecting the implementation of housing reconstruction programmes were identified and a conceptual framework proposed. This study systematically reviews the academic literature, case studies and working papers in order to identify measures that have been applied by managers of reconstruction programmes to overcome these previously identified issues. The measures identified will be used to develop the previously proposed conceptual framework and thus to enable data collection through an experts’ opinion survey. Findings from the experts’ opinion survey will, in turn, be used to deduce best practice measures for managing permanent housing reconstruction programmes. This study is intended to aid policy making by providing stakeholders with good practice measures for managing issues in post-disaster housing reconstruction. In addition, it improves the knowledge base by presenting current housing reconstruction management practices and recommending how they can be improved for better community recovery and resilience building after large-scale disasters.

[1]  P. Murphy,et al.  Logistics of Famine Relief , 1995 .

[2]  E. Seville,et al.  Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions , 2011 .

[3]  Corrado Minervini Housing reconstruction in Kosovo , 2002 .

[4]  R. Ulrich Evidence-based healthcare architecture , 2006 .

[5]  Dina Battisto,et al.  A Standardized Case Study Framework and Methodology to Identify “Best Practices” , 2013 .

[6]  R. Olshansky,et al.  Disaster and Recovery: Processes Compressed in Time , 2012 .

[7]  S. Wilkinson,et al.  “Build Back Better” Principles for Reconstruction , 2014 .

[8]  Lynn Nielsen-Bohlman,et al.  The toolkit. , 2003, Occasional paper.

[9]  Iftekhar Ahmed,et al.  An overview of post‐disaster permanent housing reconstruction in developing countries , 2011 .

[10]  David R. Godschalk,et al.  Urban Hazard Mitigation: Creating Resilient Cities , 2003 .

[11]  Allreza Fallahi Lessons Learned from the Housing Reconstruction Following the Bam Earthquake in Iran , 2007 .

[12]  Michal Lyons,et al.  Building Back Better: The Large-Scale Impact of Small-Scale Approaches to Reconstruction , 2009 .

[13]  Michele Magni,et al.  Communicating with communities (CwC) during post-disaster reconstruction: an initial analysis , 2016, Natural Hazards.

[14]  Abhas K. Jha,et al.  Safer Homes, Stronger Communities: A Handbook for Reconstructing After Natural Disasters , 2010 .

[15]  Suzanne Wilkinson,et al.  An integrated approach: managing resources for post-disaster reconstruction , 2011 .

[16]  Thomas J. Campanella,et al.  Planning for Postdisaster Resiliency , 2006 .

[17]  Jennifer Duyne Barenstein,et al.  Housing reconstruction in post-earthquake Gujarat: A comparative analysis. , 2006 .

[18]  Theo Schilderman,et al.  Resilient dwellings or resilient people? Towards people-centred reconstruction , 2011 .

[19]  Suzanne Wilkinson,et al.  Resourcing for post‐disaster reconstruction: a comparative study of Indonesia and China , 2012 .

[20]  David A. McEntire,et al.  Emergent Phenomena and Multiorganizational Coordination in Disasters: Lessons from the Research Literature , 2002, International Journal of Mass Emergencies & Disasters.

[21]  Ravindra K. Pande,et al.  Resettlement and rehabilitation issues in Uttaranchal (India) with reference to natural disasters , 2007 .

[22]  Joel F. Audefroy,et al.  Post-disaster emergency and reconstruction experiences in Asia and Latin America: an assessment , 2010 .

[23]  Richard L. Tucker,et al.  Multiskilled Labor Utilization Strategies in Construction , 1998 .

[24]  Paolo Tombesi,et al.  Towards a more “robust” technology? Capacity building in post‐tsunami Sri Lanka , 2008 .

[25]  Klaus Rohland and Sarah Cliffe,et al.  The East Timor reconstruction program : successes, problems and tradeoffs , 2002 .

[26]  A. W. Al-Khafaji,et al.  Communication in Stakeholder Management , 2010 .

[27]  E. Quarantelli,et al.  A Brief Note on Disaster Restoration, Reconstruction and Recovery: A Comparative Note Using Post Earthquake Observations , 2008 .

[28]  Tun Lin Moe,et al.  An integrated approach to natural disaster management , 2006 .

[29]  Gyöngyi Kovács,et al.  A community-based approach to supply chain design , 2010 .

[30]  Sisira Jayasuriya,et al.  Reconstruction after a major disaster: Lessons from the post-Tsunami experience in Indonesia, Sri Lanka, and Thailand , 2008 .

[31]  B. Ferguson,et al.  A financial framework for reducing slums: lessons from experience in Latin America , 2003 .

[32]  C. Boano Housing anxiety and multiple geographies in post-tsunami Sri Lanka. , 2009, Disasters.

[33]  Richard Haigh,et al.  Exploring good practice knowledge transfer related to post tsunami housing re-construction in Sri Lanka , 2008 .

[34]  Rdg Amaratunga,et al.  Community based post disaster housing reconstruction: Indonesian perspective , 2010 .

[35]  Joseph Ashmore,et al.  The Meaning of Build Back Better: Evidence from Post-Tsunami Aceh and Sri Lanka , 2008 .

[36]  Florian Steinberg,et al.  Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia—Rebuilding lives☆ , 2007 .

[37]  Emlyn Witt,et al.  An analysis of issues for the management of post-disaster housing reconstruction , 2016 .

[38]  Build Change Homeowner-driven housing reconstruction and retrofitting in Haiti : lessons learned, 4 years after the earthquake. , 2014 .

[39]  S. Barakat Housing reconstruction after conflict and disaster , 2003 .

[40]  Cassidy Johnson,et al.  Truths and myths about community participation in post-disaster housing projects , 2007 .

[41]  Oriol Pons,et al.  Multicriteria Decision-Making Method for Sustainable Site Location of Post-Disaster Temporary Housing in Urban Areas , 2016 .

[42]  C. Benson,et al.  Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations , 2007 .

[43]  G. Kovács,et al.  Designing Post-Disaster Supply Chains : Learning from Housing Reconstruction Projects , 2015 .

[44]  Bassam Baroudi,et al.  Stakeholder management in disaster restoration projects , 2014 .

[45]  M. Lindell,et al.  Housing reconstruction after two major earthquakes: the 1994 Northridge earthquake in the United States and the 1999 Chi-Chi earthquake in Taiwan. , 2004, Disasters.

[46]  T. Ophiyandri Community‐Based Post‐Disaster Housing Reconstruction: Examples from Indonesia , 2011 .

[47]  Amin Akhavan Tabassi,et al.  Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran , 2009 .

[48]  Tarek Hegazy,et al.  In-House Delivery of Multiple-Small Reconstruction Projects , 2004 .

[49]  K. Srinivasan,et al.  Operating decisions, supplier availability and quality: An empirical study , 1995 .

[50]  Murat Tas,et al.  Study on permanent housing production after 1999 earthquake in Kocaeli (Turkey) , 2010 .

[51]  Mahmood Hosseini,et al.  Post-Bam earthquake: recovery and reconstruction , 2008 .

[52]  Jo da Silva,et al.  Lessons from Aceh: Key Considerations in Post-Disaster Reconstruction , 2010 .

[53]  Nicolas Faysse,et al.  Troubles on the way: An analysis of the challenges faced by multi-stakeholder platforms , 2006 .

[54]  Christine Wamsler,et al.  Mainstreaming risk reduction in urban planning and housing: a challenge for international aid organisations. , 2006, Disasters.

[55]  Theo Schilderman,et al.  Building Back Better: Delivering people-centred housing reconstruction at scale , 2010 .

[56]  Thayaparan Gajendran,et al.  Organising the management of disaster recovery and construction: a built environment perspective , 2013 .

[57]  Suzanne Wilkinson,et al.  BUILD BACK BETTER: LESSONS FROM SRI LANKA’S RECOVERY FROM THE 2004 INDIAN OCEAN TSUNAMI , 2013 .

[58]  Mundia Muya,et al.  Risk identification on community‐based construction projects in Zambia , 2008 .

[59]  Suzanne Wilkinson,et al.  Improving construction sector resilience , 2016 .

[60]  Thomas Moullier Building regulation for resilience : managing risks for safer cities , 2015 .

[61]  Elizabeth Maly,et al.  Planning for relocation in recovery after the Great East Japan Earthquake , 2014 .

[62]  Dilanthi Amaratunga,et al.  An integrative review of the built environment discipline's role in the development of society's resilience to disasters , 2010 .

[63]  Gavin Smith,et al.  Planning for Resiliency: Evaluation of State Hazard Mitigation Plans under the Disaster Mitigation Act , 2012 .

[64]  A Oliver-Smith,et al.  Successes and failures in post-disaster resettlement. , 1991, Disasters.

[65]  Carolyn Hayles,et al.  An examination of decision making in post disaster housing reconstruction , 2010 .

[66]  Andrew Price,et al.  Integrating disaster risk management into construction: a UK perspective , 2007 .

[67]  Suahasil Nazara,et al.  Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006 , 2007 .

[68]  R. Haigh,et al.  Strategies for the effective engagement of multi-national construction enterprises in post-disaster building and infrastructure projects , 2012 .

[69]  Li Zhang,et al.  Cooperative Exchange: Rewards and Risks , 1992 .

[72]  Oriol Pons,et al.  Multi-criteria decision-making method for assessing the sustainability of post-disaster temporary housing units technologies: A case study in Bam, 2003 , 2016 .

[73]  Dilanthi Amaratunga,et al.  Critical success factors for community‐based post‐disaster housing reconstruction projects in the pre‐construction stage in Indonesia , 2013 .

[74]  A. Dainty,et al.  Resolving the UK construction skills crisis: a critical perspective on the research and policy agenda , 2007 .

[75]  R. Ulrich Essay: Evidence-based health-care architecture , 2006, The Lancet.

[76]  P. Berke,et al.  Recovery after disaster: achieving sustainable development, mitigation and equity. , 1993, Disasters.

[77]  Suzanne Wilkinson,et al.  Identifying factors affecting resource availability for post‐disaster reconstruction: a case study in China , 2011 .

[78]  Suzanne Wilkinson,et al.  Resourcing challenges for post-disaster housing reconstruction: a comparative analysis , 2010 .

[79]  Florian Steinberg,et al.  Rebuilding Lives and Homes in Aceh and Nias, Indonesia , 2010 .

[80]  Jacqueline Glass,et al.  Realising a resilient and sustainable built environment: towards a strategic agenda for the United Kingdom. , 2007, Disasters.

[81]  Philip Berke,et al.  Searching for the Good Plan , 2009 .

[82]  Mehran Gharaati,et al.  Who Knows Best? An Overview of Reconstruction after the Earthquake in Bam, Iran , 2008 .

[83]  Suzanne Wilkinson,et al.  Managing resources in disaster recovery projects , 2012 .

[84]  Irene Lill,et al.  A Framework for Managing Post-disaster Housing Reconstruction☆ , 2015 .

[85]  H. Ping Tserng,et al.  Developing a resource supply chain planning system for construction projects , 2006 .

[86]  Stefan Olander,et al.  Stakeholder impact analysis in construction project management , 2007 .

[87]  Chaminda Pathirage,et al.  Risk identification on community based post disaster housing reconstruction projects , 2011 .

[88]  Arturas Kaklauskas,et al.  Enhancing post-disaster reconstruction capacity through lifelong learning in higher education , 2015 .

[89]  Kaushal Keraminiyage,et al.  Long-term satisfaction of post disaster resettled communities : the case of post tsunami – Sri Lanka , 2016 .

[90]  Jo da Silva,et al.  Indonesia: Understanding agency policy in a national context , 2010 .

[91]  J Twigg,et al.  Characteristics of a Disaster-resilient Community: A Guidance Note , 2007 .

[92]  Federica Ranghieri,et al.  Learning from Megadisasters : lessons from the great east Japan earthquake , 2014 .

[93]  C. Thorburn The Acehnese Gampong Three Years On: Assessing Local Capacity and Reconstruction Assistance in Post-tsunami Aceh , 2007 .

[94]  Victoria M. Edwards,et al.  Platforms for collective action in multiple-use common-pool resources , 1999 .

[95]  Low Sui Pheng,et al.  Tsunamis: Some pre‐emptive disaster planning and management issues for consideration by the construction industry , 2006 .

[96]  Lukumon O. Oyedele,et al.  Linking organisational competency to project success in post-disaster reconstruction , 2014 .

[97]  Mikko Koria Managing for innovation in large and complex recovery programmes: Tsunami lessons from Sri Lanka , 2009 .

[98]  J. Pantelić The link between reconstruction and development , 1991 .

[99]  P. Daly,et al.  Aid Accountability and Participatory Approaches in Post-Disaster Housing Reconstruction , 2011 .

[100]  J. Turner Housing By People: Towards Autonomy in Building Environments , 1977 .