In a global environment where energy and labor are becoming increasingly expensive, continuous mining systems such as In-Pit Crushing and Conveying (IPCC) systems have been advanced as offering a real alternative to conventional truck haulage systems. The implementation of IPCC systems in hard rock operations in open pit mines however requires different and more comprehensive planning approaches in order to adequately reflect the practical aspects associated with these. This paper investigates the impact that these approaches may have on the implementation of IPCC systems on a basic metalliferous deposit amenable to open pit exploitation. A strategic life of mine plan to provide numerous economic indicators for each approach is analyzed and compared to traditional truck haulage systems. The mine planning and evaluation process highlights the increased overall resource recovery that may accompany the use of IPCC systems. This investigation also provides insights into the issues associated with IPCC and the scale and type of operation and orebody that is likely to provide a feasible alternative to truck haulage. (C) 2018 Published by Elsevier B.V. on behalf of China University of Mining & Technology.
[1]
Eduardo Moreno,et al.
A New Algorithm for the Open-Pit Mine Production Scheduling Problem
,
2012,
Oper. Res..
[2]
Ruhul A. Sarker,et al.
A local branching heuristic for the open pit mine production scheduling problem
,
2017,
Eur. J. Oper. Res..
[3]
Ambros M. Gleixner,et al.
LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
,
2009,
Comput. Oper. Res..
[4]
Alexandra M. Newman,et al.
Tailored Lagrangian Relaxation for the open pit block sequencing problem
,
2014,
Ann. Oper. Res..
[5]
L. M. Giannini.
Optimum design of open pit mines
,
1991,
Bulletin of the Australian Mathematical Society.