Schedule performance measurement based on statistical process control charts

In a job–shop environment, achieving a schedule that is on target is difficult due to the dynamism of factors affecting the system. In this paper the Shewart's Individuals control chart is applied to a scheduling process for the purpose of measuring schedule performance. The charts are applied to monitor the deviations of actual from scheduled process times for jobs on a process machine. Data transformation operations are used to counter the negative effects of non–normal data. The proposed methodology enables a scheduler study the variations between scheduled and actual outcomes, seek ways of eliminating these variations and check if process improvements have been effective. SPC charts have not been used to measure schedule performance in a job shop setting, so this paper uniquely contributes to research within the field.

[1]  Y.-W. Liu,et al.  Data transformation in SPC for semiconductor machinery control: A case of monitoring particles , 2005 .

[2]  Michaela Stfiíteská,et al.  SURVEY OF PERFORMANCE MEASUREMENT SYSTEMS IN CZECH COMPANIES , 2012 .

[3]  Bart L. MacCarthy,et al.  Using SPC Chart Techniques in Production Planning and Scheduling : Two Case Studies Operations Planning, Scheduling and Control , 2001 .

[4]  Sanja Petrovic,et al.  SURVEY OF DYNAMIC SCHEDULING IN MANUFACTURING SYSTEMS , 2006 .

[5]  Sven Knoth Statistical Process Control , 2002 .

[6]  Jeh-Nan Pan,et al.  Evaluating environmental performance using statistical process control techniques , 2002, Eur. J. Oper. Res..

[7]  C. Morgan,et al.  Using SPC to measure a national supermarket chain's suppliers' performance , 2007 .

[8]  Bart L. MacCarthy,et al.  Statistical process control for monitoring scheduling performance—addressing the problem of correlated data , 2001, J. Oper. Res. Soc..

[9]  Bart L. MacCarthy,et al.  A review of non‐standard applications of statistical process control (SPC) charts , 2002 .

[10]  Peter Kueng,et al.  Process performance measurement system: A tool to support process-based organizations , 2000 .

[11]  Rosemary R. Fullerton,et al.  Performance measurement and reward systems in JIT and non-JIT firms , 2003 .

[12]  Jiju Antony,et al.  Critical success factors for SPC implementation in UK small and medium enterprises: some key findings from a survey , 2002 .

[13]  Roger M. Sauter,et al.  Introduction to Statistical Quality Control (2nd ed.) , 1992 .

[14]  Shirley Coleman,et al.  SPC as a tool for creating a successful business measurement framework , 2001 .

[15]  Stanislav Karapetrovic,et al.  Tracking Classroom Teaching and Learning: An SPC Application , 2005 .

[16]  Darja Noskievičová,et al.  Complex Control Chart Interpretation , 2013 .

[17]  Daniel W. Apley Time Series Control Charts in the Presence of Model Uncertainty , 2002 .