Evaluating the impacts of reticle requirements in semiconductor wafer fabrication
暂无分享,去创建一个
G.T. Mackulak | J.W. Fowler | M.E. Pfund | S.L.M. de Diaz | M. Hickie | J. Fowler | M. Pfund | G. Mackulak | S.L.M. de Diaz | M. Hickie
[1] Michael Pinedo,et al. A heuristic to minimize the total weighted tardiness with sequence-dependent setups , 1997 .
[2] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[3] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[4] A. Alan B. Pritsker. Introduction to simulation and SLAM II (2nd ed.) , 1984 .
[5] Sungmin Park,et al. Assessment of potential gains in productivity due to proactive reticle management using discrete event simulation , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).
[6] E. Akcali,et al. A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography , 2000, Twenty Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium (Cat. No.00CH37146).
[7] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .