A Mathematical Model for HVLV Systems Scheduling and Optimization With Periodic Preventive Maintenance Using (max, +) Algebra

Abstract The High-Variety, Low-Volume (HVLV) scheduling problem is one of the most arduous combinatorial optimization problems. This paper considers an interesting formulation of the HVLV scheduling problem using (max, +) algebra while periodic Preventive Maintenance (PM) is considered. Maintenance is time based since activities are periodically fixed: maintenance is required after a periodic time interval (all periods are equals on each machine). In this paper, the maintenance tasks of machines are controllable.The jobs and the maintenance operations are scheduled simultaneously. Also, the maintenance operations are scheduled between each other, so that a regular criterion is optimized. To generate feasible schedules, constrained decision variables are incorporated into the (max, +) model. The validity of the proposed approach is illustrated by simulation examples.

[1]  Georges Habchi,et al.  Max-plus-linear model-based predictive control for constrained HVLV manufacturing systems , 2011, ETFA2011.

[2]  C. Leake Synchronization and Linearity: An Algebra for Discrete Event Systems , 1994 .

[3]  Georges Habchi,et al.  Application of a continuous supervisory fuzzy control on a discrete scheduling of manufacturing systems , 2011, Eng. Appl. Artif. Intell..

[4]  Alexandre Dolgui,et al.  Single machine scheduling with precedence constraints and positionally dependent processing times , 2012, Comput. Oper. Res..

[5]  Karim Tamani,et al.  Intelligent distributed and supervised flow control methodology for production systems , 2009, Eng. Appl. Artif. Intell..

[6]  Andrew Kusiak,et al.  Intelligent scheduling of automated machining systems , 1992 .

[7]  Jean-Louis Boimond,et al.  Just in Time Control of Constrained (max,+)-Linear Systems , 2007, Discret. Event Dyn. Syst..

[8]  Geert Jan Olsder,et al.  Synchronization and Linearity: An Algebra for Discrete Event Systems , 1994 .

[9]  Pierre Borne,et al.  Minimizing the makespan for the MPM job-shop with availability constraints , 2008 .

[10]  Georges Habchi,et al.  Scheduling and control modeling of HVLV systems using max-plus algebra , 2011 .

[11]  Christophe Varnier,et al.  Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness , 2008, Comput. Ind. Eng..

[12]  Lei Wang,et al.  An improved adaptive genetic algorithm based on hormone modulation mechanism for job-shop scheduling problem , 2011, Expert Syst. Appl..

[13]  Tamani Karim,et al.  Multi-objective supervisory flow control based on fuzzy interval arithmetic: Application for scheduling of manufacturing systems , 2011 .