A Mathematical Model for HVLV Systems Scheduling and Optimization With Periodic Preventive Maintenance Using (max, +) Algebra
暂无分享,去创建一个
[1] Georges Habchi,et al. Max-plus-linear model-based predictive control for constrained HVLV manufacturing systems , 2011, ETFA2011.
[2] C. Leake. Synchronization and Linearity: An Algebra for Discrete Event Systems , 1994 .
[3] Georges Habchi,et al. Application of a continuous supervisory fuzzy control on a discrete scheduling of manufacturing systems , 2011, Eng. Appl. Artif. Intell..
[4] Alexandre Dolgui,et al. Single machine scheduling with precedence constraints and positionally dependent processing times , 2012, Comput. Oper. Res..
[5] Karim Tamani,et al. Intelligent distributed and supervised flow control methodology for production systems , 2009, Eng. Appl. Artif. Intell..
[6] Andrew Kusiak,et al. Intelligent scheduling of automated machining systems , 1992 .
[7] Jean-Louis Boimond,et al. Just in Time Control of Constrained (max,+)-Linear Systems , 2007, Discret. Event Dyn. Syst..
[8] Geert Jan Olsder,et al. Synchronization and Linearity: An Algebra for Discrete Event Systems , 1994 .
[9] Pierre Borne,et al. Minimizing the makespan for the MPM job-shop with availability constraints , 2008 .
[10] Georges Habchi,et al. Scheduling and control modeling of HVLV systems using max-plus algebra , 2011 .
[11] Christophe Varnier,et al. Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness , 2008, Comput. Ind. Eng..
[12] Lei Wang,et al. An improved adaptive genetic algorithm based on hormone modulation mechanism for job-shop scheduling problem , 2011, Expert Syst. Appl..
[13] Tamani Karim,et al. Multi-objective supervisory flow control based on fuzzy interval arithmetic: Application for scheduling of manufacturing systems , 2011 .