Manufacturing Operations Manuscripts Published in the First 52 Issues of POM: Review, Trends, and Opportunities
暂无分享,去创建一个
[1] Ray R. Venkataraman. FREQUENCY OF REPLANNING IN A ROLLING HORIZON MASTER PRODUCTION SCHEDULE FOR A PROCESS INDUSTRY ENVIRONMENT: A CASE STUDY , 2009 .
[2] Hartmut Stadtler,et al. AN OPERATIONAL PLANNING CONCEPT FOR DEEP LANE STORAGE SYSTEMS , 1996 .
[3] Susan Helper,et al. The Empirical Determinants of Inventory Levels in High-Volume Manufacturing 1 , 1996 .
[4] Regina Berretta,et al. LOT‐SIZING IN CAPACITATED MULTI‐STAGE SERIAL SYSTEMS , 2009 .
[5] Leonora Fuxman,et al. OPTIMAL BUFFER ALLOCATION IN ASYNCHRONOUS CYCLIC MIXED‐MODEL ASSEMBLY LINES , 2009 .
[6] Oscar F. Garza,et al. LOAD CUBING AT R. J. REYNOLDS , 2009 .
[7] Ming Liang,et al. SOLVING A COMBINED PART‐SELECTION, MACHINE‐LOADING, AND TOOL‐CONFIGURATION PROBLEM IN FLEXIBLE MANUFACTURING SYSTEMS* , 2009 .
[8] Cheng Hsu,et al. INTEGRATION IN MANUFACTURING: AN INFORMATION THEORETIC PERSPECTIVE , 2009 .
[9] Meir J. Rosenblatt,et al. INTRODUCING INTERNATIONAL ISSUES INTO OPERATIONS MANAGEMENT CURRICULA , 2009 .
[10] Richard W. Conway,et al. MANAGING CYCLIC INVENTORIES , 2009 .
[11] Chung Yee Lee,et al. GLOBAL JOB SHOP SCHEDULING WITH A GENETIC ALGORITHM , 1995 .
[12] R. Lawrence LaForge,et al. THE IMPACT OF SIMPLE PRIORITY RULE COMBINATIONS ON DELIVERY SPEED AND DELIVERY RELIABILITY IN A HYBRID SHOP , 2009 .
[13] Shailesh S. Kulkarni,et al. Risk Pooling Advantages of Manufacturing Network Configuration , 2004 .
[14] Andrew P. McAfee. THE IMPACT OF ENTERPRISE INFORMATION TECHNOLOGY ADOPTION ON OPERATIONAL PERFORMANCE: AN EMPIRICAL INVESTIGATION , 2002 .
[15] Chung Yee Lee,et al. COMMON DUE‐WINDOW SCHEDULING , 1993 .
[16] John J. Liu. DYNAMIC FEEDING IN A STOCHASTIC PARALLEL PROCESSING SYSTEM , 2009 .
[17] Hongbo Wang. A BRANCH‐AND‐BOUND APPROACH FOR SEQUENCING EXPANSION PROJECTS , 2009 .
[18] Stephen C. Graves,et al. REDUCING FLOW TIME IN AIRCRAFT MANUFACTURING , 2009 .
[19] José Antonio Domínguez Machuca,et al. IMPROVING POM LEARNING: SYSTEMS THINKING AND TRANSPARENT-BOX BUSINESS SIMULATORS , 2009 .
[20] Richard Metters,et al. A COMPARISON OF PRODUCTION SCHEDULING POLICIES ON COSTS, SERVICE LEVEL, AND SCHEDULE CHANGES , 2009 .
[21] Geraldo Ferrer,et al. MATERIAL PLANNING FOR A REMANUFACTURING FACILITY , 2001 .
[22] Elliott N. Weiss,et al. TPM: PLANNED AND AUTONOMOUS MAINTENANCE: BRIDGING THE GAP BETWEEN PRACTICE AND RESEARCH , 1998 .
[23] Danny J. Johnson,et al. Why Does Cell Implementation Stop? Factors Influencing Cell Penetration in Manufacturing Plants , 2004 .
[24] Huan Neng Chiu,et al. DETERMINISTIC TIME‐VARYING DEMAND LOT‐SIZING MODELS WITH LEARNING AND FORGETTING IN SETUPS AND PRODUCTION , 2003 .
[25] S. Selcuk Erenguc,et al. A BRANCH AND BOUND PROCEDURE FOR SETUP PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS , 2009 .
[26] Timothy D. Fry,et al. AN ANALYSIS AND DISCUSSION OF THE OPTIMIZED PRODUCTION TECHNOLOGY SOFTWARE AND ITS USE , 2009 .
[27] B. J. Berkley,et al. A REVIEW OF THE KANBAN PRODUCTION CONTROL RESEARCH LITERATURE , 2009 .
[28] J. George Shanthikumar,et al. COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT, SINGLE‐ MACHINE PRODUCTION SYSTEM , 2009 .
[29] Suresh Chand,et al. A SINGLE‐MACHINE SCHEDULING MODEL WITH FIXED‐INTERVAL DELIVERIES , 2009 .
[30] Charles J. Corbett,et al. THE VALUE OF SKU RATIONALIZATION IN PRACTICE (THE POOLING EFFECT UNDER SUBOPTIMAL INVENTORY POLICIES AND NONNORMAL DEMAND) , 2009 .
[31] William W. Cooper,et al. FLEXIBILITY, ADAPTABILITY, AND EFFICIENCY IN MANUFACTURING SYSTEMS , 2009 .
[32] Roger G. Schroeder,et al. A FRAMEWORK AND MEASUREMENT INSTRUMENT FOR JUST‐IN‐TIME MANUFACTURING , 1993 .
[33] Elliott F. Williams,et al. O(m2) ALGORITHMS FOR THE TWO AND THREE SUBLOT LOT STREAMING PROBLEM , 2009 .
[34] D. R. Denzler,et al. AN EXPERIMENTAL MODEL FOR INVESTIGATING THE SENSITIVITY OF JOB SHOP PERFORMANCE TO JOB RELEASE TIME DISTRIBUTION PARAMETERS , 2009 .
[35] B. Alidaee. MINIMIZING ABSOLUTE AND SQUARED DEVIATION OF COMPLETION TIMES FROM DUE DATES , 2009 .
[36] Bahram Alidaee,et al. A FRAMEWORK FOR MACHINE SCHEDULING PROBLEMS WITH CONTROLLABLE PROCESSING TIMES , 2009 .
[37] Houmin Yan,et al. ROBUSTNESS OF VARIOUS PRODUCTION CONTROL POLICIES IN SEMICONDUCTOR MANUFACTURING , 2000 .
[38] Robert R. Inman,et al. THE VALIDITY OF THE INDEPENDENT INCREMENTS ASSUMPTION FOR PRODUCTION: AN EMPIRICAL STUDY OF AN AUTOMOTIVE ASSEMBLY PLANT , 2009 .
[39] DaeSoo Kim,et al. EFFECTS OF INTEGRATING ORDER/BACKORDER QUANTITY AND PRICING DECISIONS , 2009 .
[40] Charles G. Petersen. AN EVALUATION OF ORDER PICKING POLICIES FOR MAIL ORDER COMPANIES , 2009 .
[41] David L. Woodruff,et al. SEQUENCING AND BATCHING FOR TWO CLASSES OF JOBS WITH DEADLINES AND SETUP TIMES , 1992 .
[42] Suresh P. Sethi,et al. Existence and Derivation of Forecast Horizons in a Dynamic Lot Size Model with Nondecreasing Holding Costs , 2009 .
[43] Elliott N. Weiss,et al. A COMPARISON OF RULES FOR ALLOCATING SETUP‐REDUCTION INVESTMENTS IN A CAPACITATED ENVIRONMENT , 2009 .
[44] John A. Buzacott,et al. THE EFFECTS OF LEAD TIME ON PLANT TIMING AND SIZE , 1994 .
[45] D. Clay Whybark,et al. DOES INTERNATIONAL OPERATIONS MANAGEMENT NEED A SEPARATE PERSPECTIVE? , 1997 .
[46] Rajan Suri,et al. PERFORMANCE ANALYSIS OF AN ASSEMBLY STATION WITH INPUT FROM MULTIPLE FABRICATION LINES , 2009 .
[47] Arnold H. Buss,et al. SHIFTING PRODUCTION BOTTLENECKS: CAUSES, CURES, AND CONUNDRUMS , 2009 .
[48] M. J. Rosenblatt,et al. THEORIES AND REALITIES OF QUANTITY DISCOUNTS: AN EXPLORATORY STUDY * , 2009 .
[49] Reinaldo Morabito,et al. AN OVERVIEW OF TRADEOFF CURVES IN MANUFACTURING SYSTEMS DESIGN , 2009 .
[50] Sherman X. Bai,et al. PRODUCTION FLOW CONTROL FOR A MANUFACTURING SYSTEM WITH FLEXIBLE ROUTINGS , 2009 .
[51] John Paul MacDuffie,et al. EXPLAINING PLANT‐LEVEL DIFFERENCES IN MANUFACTURING OVERHEAD: STRUCTURAL AND EXECUTIONAL COST DRIVERS IN THE WORLD AUTO INDUSTRY , 2009 .
[52] Hakan Polatoglu,et al. MANUFACTURING QUALITY, RELIABILITY AND PREVENTIVE MAINTENANCE , 2009 .
[53] Mark L. Spearman. ON THE THEORY OF CONSTRAINTS AND THE GOAL SYSTEM , 2009 .
[54] Horst Tempelmeier,et al. A SIMPLE HEURISTIC FOR DYNAMIC ORDER SIZING AND SUPPLIER SELECTION WITH TIME‐VARYING DATA , 2009 .
[55] Martin K. Starr. PEDAGOGICAL CHALLENGE: TEACHING INTERNATIONAL PRODUCTION AND OPERATIONS MANAGEMENT COURSES , 2009 .
[56] J. A. Muckstadt,et al. Production Control of Cyclic Schedules with Demand and Process Variability , 2009 .
[57] Leroy B. Schwarz. A NEW TEACHING PARADIGM: THE INFORMATION/ CONTROL/BUFFER PORTFOLIO , 2009 .
[58] Thomas E. Morton,et al. A TUTORIAL ON BOTTLENECK DYNAMICS: A HEURISTIC SCHEDULING METHODOLOGY , 1995 .
[59] Yash P. Gupta,et al. COMPUTER‐INTEGRATED MANUFACTURING: A TAXONOMY OF INTEGRATION AND RESEARCH ISSUES , 2009 .
[60] Houmin Yan,et al. Production scheduling of continuous flow lines: Multiple products with setup times and costs , 2009 .
[61] Jatinder N. D. Gupta,et al. A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMES , 2000 .
[62] Ronald J. Ebert,et al. BUILDING THE POM CURRICULUM FOR A PRIVATIZING ECONOMY: AN EVALUATION FROM MANUFACTURERS‘ PERSPECTIVES , 1998 .
[63] Urban Wemmerlöv,et al. ON THE RELATIVE PERFORMANCE OF FUNCTIONAL AND CELLULAR LAYOUTS‐ AN ANALYSIS OF THE MODEL‐BASED COMPARATIVE STUDIES LITERATURE , 2009 .
[64] Tan Miller,et al. EVALUATING THE TRADE‐OFFS BETWEEN IDLING AND SHUTTING DOWN PRODUCTION LINES IN PROCESS INDUSTRIES , 2009 .
[65] Timothy L. Smunt,et al. A COMPARISON OF DIRECT COST SAVINGS BETWEEN FLEXIBLE AUTOMATION AND LABOR WITH LEARNING , 2000 .
[66] Cheryl Gaimon,et al. ANALYSIS OF THE LEAD TIME AND LEARNING FOR CAPACITY EXPANSIONS , 2009 .
[67] Kum Khiong Yang. Managing a Flow Line with Single-Kanban, Dual-Kanban or Conwip , 2009 .
[68] Gerard M. Campbell. USING SHORT-TERM DEDICATION FOR SCHEDULING MULTIPLE PRODUCTS ON PARALLEL MACHINES , 2009 .
[69] J. George Shanthikumar,et al. A GENERAL APPROACH FOR COORDINATING PRODUCTION IN MULTIPLE‐CELL MANUFACTURING SYSTEMS , 1992 .
[70] Jack C. Hayya,et al. SETUP REDUCTION AND MACHINE AVAILABILITY , 2009 .
[71] Michael Pinedo. COMMENTARY ON “AN EXPOSITION OF MULTIPLE CONSTRAINT SCHEDULING AS IMPLEMENTED IN THE GOAL SYSTEM” , 2009 .
[72] Salah E. Elmaghraby,et al. SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES , 2009 .
[73] Qing Zhang,et al. CAPACITY AND PRODUCTION DECISIONS IN STOCHASTIC MANUFACTURING SYSTEMS: AN ASYMPTOTIC OPTIMAL HIERARCHICAL APPROACH , 1992 .
[74] Maged Dessouky,et al. AN OPTIMIZATION-BASED METHODOLOGY FOR RELEASE SCHEDULING* , 2009 .
[75] Qiyuan Jiang,et al. LOT-SIZING RULE AND FREEZING THE MASTER PRODUCTION SCHEDULE UNDER CAPACITY CONSTRAINT AND DETERMINISTIC DEMAND , 2009 .
[76] James D. Blocher,et al. THROUGHPUT TIME REDUCTION: TAKING ONE'S MEDICINE , 1999 .
[77] Belarmino Adenso-Díaz,et al. A TECHNIQUE TO MINIMIZE OVERTIME IN THE CAPACITATED MRP PROBLEM , 2009 .
[78] Bryan L. Deuermeyer,et al. AN AUTOMATIC MODELING APPROACH TO THE STRATEGIC ANALYSIS OF SEMICONDUCTOR FABRICATION FACILITIES , 2009 .
[79] B. Jay Coleman. TECHNICAL NOTE: A SIMPLE MODEL FOR OPTIMIZING THE SINGLE MACHINE EARLY/TARDY PROBLEM WITH SEQUENCE‐DEPENDENT SETUPS , 2009 .
[80] Richard F. Hartl. PRODUCTION SMOOTHING UNDER ENVIRONMENTAL CONSTRAINTS , 2009 .
[81] R. Alan Bowman,et al. JOB RELEASE CONTROL USING A CYCLIC SCHEDULE , 2009 .
[82] A. K. Aggarwal,et al. A MODEL‐BASED DECISION SUPPORT SYSTEM FOR SCHEDULING LUMBER DRYING OPERATIONS , 2009 .
[83] Guoqing Wang,et al. TWO- AND THREE-STAGE FLOWSHOP SCHEDULING WITH NO-WAIT IN PROCESS , 2009 .
[84] Satya S. Chakravorty,et al. A STUDY OF THE UTILIZATION OF CAPACITY CONSTRAINED RESOURCES IN DRUM‐BUFFER‐ROPE SYSTEMS* , 2009 .
[85] Arthur V. Hill,et al. MODELS FOR OPTIMAL LEAD TIME REDUCTION , 2009 .
[86] T.C.E. Cheng,et al. AN ECONOMIC PRODUCTION QUANTITY MODEL WITH LEARNING AND FORGETTING CONSIDERATIONS , 1994 .
[87] Sushil Verma,et al. SIMULTANEOUS BATCHING AND SCHEDULING FOR CHEMICAL PROCESSING WITH EARLINESS AND TARDINESS PENALTIES , 2009 .
[88] Michael X. Weng,et al. A NOTE ON “COMMON DUE WINDOW SCHEDULING” , 2009 .
[89] Avraham Shtub,et al. THE EFFECT OF LEARNING ON THE OPERATION OF MIXED-MODEL ASSEMBLY LINES , 2009 .
[90] Richard W. Conway. COMMENTS ON AN EXPOSITION OF MULTIPLE CONSTRAINT SCHEDULING , 2009 .
[91] Haim Shore,et al. OPTIMUM SCHEDULE FOR PREVENTIVE MAINTENANCE: A GENERAL SOLUTION FOR A PARTIALLY SPECIFIED TIME‐TO‐FAILURE DISTRIBUTION , 1996 .
[92] Charles T. Mosier,et al. CELLULAR PRODUCTION SYSTEMS: A CONCURRENT CLUSTER ANALYTIC FRAMEWORK , 2009 .
[93] Sherman X. Bai,et al. Optimal and Near Optimal Control of a Two-Part-Type Stochastic Manufacturing System with Dynamic Setups , 2009 .
[94] Reha Uzsoy,et al. MINIMIZING TOTAL WEIGHTED COMPLETION TIME ON A SINGLE BATCH PROCESSING MACHINE , 1997 .
[95] Seung-Chul Kim,et al. EVALUATING ORDER RELEASE MECHANISMS IN A JOB SHOP WITH SEQUENCE‐DEPENDENT SETUP TIMES , 2009 .
[96] John J. Kanet,et al. A DECISION THEORY APPROACH TO PRIORITY DISPATCHING FOR JOB SHOP SCHEDULING , 2009 .
[97] Ronald B. Heady,et al. AN IMPROVED IMPLEMENTATION OF THE WAGNER-WHITIN ALGORITHM , 2009 .
[98] A. Raturi,et al. MEASURING AND COMPARING VOLUME FLEXIBILITY IN THE CAPITAL GOODS INDUSTRY , 2003 .
[99] John P. Leschke. A NEW PARADIGM FOR TEACHING INTRODUCTORY PRODUCTION/OPERATIONS MANAGEMENT , 2009 .
[100] Jen Tang,et al. TIME‐BASED PRICING AND LEADTIME POLICIES FOR A BUILD‐TO‐ORDER MANUFACTURER , 2002 .
[101] Ram Narasimhan,et al. IMPROVING JOB SHOP PERFORMANCE THROUGH PROCESS QUEUE MANAGEMENT UNDER TRANSFER BATCHING , 2009 .
[102] Chung-Lun Li,et al. INVESTMENT IN SETUP COST, LEAD TIME, AND DEMAND PREDICTABILITY IMPROVEMENT IN THE EOQ MODEL , 2009 .
[103] Amiya K. Chakravarty. A MODEL FOR SWITCHING DISPATCHING RULES IN REAL TIME IN A FLEXIBLE MANUFACTURING CELL , 2009 .
[104] Gilvan C. Souza,et al. MIXED ASSEMBLY AND DISASSEMBLY OPERATIONS FOR REMANUFACTURING , 2003 .
[105] Jacob V. Simons,et al. AN EXPOSITION OF MULTIPLE CONSTRAINT SCHEDULING AS IMPLEMENTED IN THE GOAL SYSTEM (FORMERLY DISASTERTM) , 2009 .
[106] Haim Shore. SOLUTION PROCEDURES WITH LIMITED SAMPLE DATA FOR THE OPTIMAL REPLACEMENT PROBLEM , 2009 .
[107] Gary D. Scudder,et al. A COMPARISON OF ORDER-RELEASE AND DISPATCH RULES FOR THE DYNAMIC WEIGHTED EARLY/TARDY PROBLEM , 2009 .