A novel scheme for fast extraction of low energy beams from the ESR to the CRYRING

The CRYRING@ESR facility [1] will provide the unique possibility for studying properties of low energy cooled heavy beams in the field of atomic and nuclear research within the FAIR project [2]. Heavy ion beams will be stored, cooled and decelerated to the energy of about 4 MeV/u in the ESR and then delivered to the CRYRING. Presently, there is no special kicker magnet which could be used for the fast extraction towards the CRYRING. However, a special distorted closed orbit has been suggested, applying it to the stored beam one can perform the fast extraction with the existing injection kicker magnet.