Scheduling small number of quay cranes with non-interference constraint
暂无分享,去创建一个
[1] Akio Imai,et al. Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks , 2006, Eur. J. Oper. Res..
[2] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[3] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[4] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[5] Lixin Miao,et al. Quay crane scheduling with non-interference constraints in port container terminals , 2008 .
[6] Frank Meisel,et al. Container sequencing for quay cranes with internal reshuffles , 2010, OR Spectr..
[7] Anne V. Goodchild,et al. Double-Cycling Strategies for Container Ships and Their Effect on Ship Loading and Unloading Operations , 2006, Transp. Sci..
[8] J.-G. Kang,et al. Stowage planning in maritime container transportation , 2002, J. Oper. Res. Soc..
[9] Andrew Lim,et al. Approximation Schemes for the Crane Scheduling Problem , 2004, SWAT.
[10] Mordecai Avriel,et al. Exact and approximate solutions of the container ship stowage problem , 1993 .
[11] Andrew Lim,et al. A m‐parallel crane scheduling problem with a non‐crossing constraint , 2007 .
[12] Kap Hwan Kim,et al. Maximizing the number of dual-cycle operations of quay cranes in container terminals , 2009, Comput. Ind. Eng..
[13] Der-Horng Lee,et al. An improved approach for quay crane scheduling with non-crossing constraints , 2010 .
[14] D Ambrosino,et al. Impact of Yard Organisation on the Master Bay Planning Problem , 2003 .