Expected Response Times for Closed-Loop Multivehicle AMHS
暂无分享,去创建一个
[1] Yavuz A. Bozer,et al. TRIP-BASED MATERIAL HANDLING SYSTEMS: THROUGHPUT CAPACITY ANALYSIS , 1994 .
[2] M. Eric Johnson,et al. Modelling empty vehicle traffic in AGVS design , 2001 .
[3] Yavuz A. Bozer,et al. Expected waiting times in single-device trip-based material handling systems , 1994 .
[4] Iris F. A. Vis,et al. Survey of research in the design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..
[5] Thom Hodgson,et al. Developing control rules for an AGV using Markov decision processes , 1985, 1985 24th IEEE Conference on Decision and Control.
[6] John J. Bartholdi,et al. Decentralized Control of Automated Guided Vehicles on a Simple Loop , 1989 .
[7] Gajanana Nadoli,et al. Simulation in automated material handling systems design for semiconductor manufacturing , 1994, Proceedings of Winter Simulation Conference.
[8] Yavuz A. Bozer,et al. Expected move request waiting times in single-device, polling-based material handling systems , 2001 .
[9] D. Pillai,et al. Integration of 300 mm fab layouts and material handling automation , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).
[10] Leon F. McGinnis,et al. An Analytical Model of Vehicle-Based Automated Material Handling Systems in Semiconductor Fabs , 2005, Proceedings of the 2006 Winter Simulation Conference.
[11] Margaret L. Brandeau,et al. Designing Multiple-Load Automated Guided Vehicle Systems for Delivering Material from a Central Depot , 1995 .
[12] John E. Kobza,et al. A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems , 1998 .
[13] Sheldon M. Ross,et al. Introduction to probability models , 1975 .
[14] Brett A. Peters,et al. Queueing network model for a class of material-handling systems , 2003 .
[15] Omer Bakkalbasi. Flow path network design and layout configuration for material delivery systems , 1989 .
[16] Lee W. Schruben,et al. A queueing network approximation of semiconductor automated material handling systems: how much information do we really need? , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..
[17] Gunter P. Sharp,et al. An analytical method for configuring fixed-path, closed-loop material handling systems† , 1990 .
[18] Thomas Arzt,et al. 1 A NEW LOW COST APPROACH IN 200 MM AND 300 MM AMHS , 1999 .
[19] Yavuz A. Bozer,et al. Tandem Configurations for Automated Guided Vehicle Systems and the Analysis of Single Vehicle Loops , 1991 .
[20] M. Eric Johnson,et al. An Analytic Model for Design and Analysis of Single-Vehicle Asynchronous Material Handling Systems , 1994, Transp. Sci..