Development of methodology for the disassemblability index of automobile systems using a structural approach
暂无分享,去创建一个
Ajith Tom James | O. P. Gandhi | Om Parkash Gandhi | Sanjeev Govindrao Deshmukh | A. James | S. G. Deshmukh
[1] Frank Harary,et al. Graph Theory , 2016 .
[2] Gordon Lewis,et al. Product Design for Manufacturing and Assembly , 2015 .
[3] M Shergold. Automotive Materials Recycling for the Future , 1994 .
[4] Zaidi Mohd Ripin,et al. Utilization of Design for Assembly Guideline to Enhance Product Maintainability , 2007 .
[5] Amadou Coulibaly,et al. Maintainability and safety indicators at design stage for mechanical products , 2008, Comput. Ind..
[6] Ehud Kroll,et al. Quantitative evaluation of product disassembly for recycling , 1998 .
[7] Tadatomo Suga,et al. Quantitative disassembly evaluation , 1996, Proceedings of the 1996 IEEE International Symposium on Electronics and the Environment. ISEE-1996.
[8] Christian Mascle,et al. Evaluation of products at design phase for an efficient disassembly at end-of-life , 2016 .
[9] Peter Mitrouchev,et al. Disassembly operations’ efficiency evaluation in a virtual environment , 2016, Int. J. Comput. Integr. Manuf..
[10] M. F. Wani,et al. Development of maintainability index for mechanical systems , 1999 .
[11] Alfred J.D. Lambert,et al. Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling , 2004 .
[12] Wieslaw Tarelko. Control model of maintainability level , 1995 .
[13] Zahari Taha,et al. Development of decision support system for fastener selection in product recovery oriented design , 2014 .
[14] Guangdong Tian,et al. Influence factor analysis and prediction models for component removal time in manufacturing , 2013 .
[15] Anil Mital,et al. Incorporating work factors in design for disassembly in product design , 2005 .
[16] S.Ahmed M.Hassan and Z.Taha. TPM can go beyond maintenance: excerpt from a case implementation , 2005 .
[17] Narsingh Deo. Graph theory with applications to engineering and computer science / Narsingh Deo , 1987 .
[18] M. Moradi,et al. Effects of implementing 5S on Total Productive Maintenance: A case in Iran , 2011, 2011 IEEE International Conference on Quality and Reliability.
[19] O. P. Gandhi,et al. Modelling and evaluation of mean time to repair at product design stage based on contextual criteria , 2013 .
[20] MengChu Zhou,et al. Fuzzy-Petri-net-based disassembly planning considering human factors , 2006, IEEE Trans. Syst. Man Cybern. Part A.
[21] Neil Hopkinson,et al. Design for environment analyses applied to rapid manufacturing , 2006 .
[22] Hwa-Cho Yi,et al. A study on the method of disassembly time evaluation of a product using work factor method , 2003, SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483).
[23] Anil Mital,et al. Evaluation of disassemblability to enable design for disassembly in mass production , 2003 .
[24] Xiaojian Liu,et al. Disassemblability modeling technology of configurable product based on disassembly constraint relation weighted design structure matrix(DSM) , 2014 .
[25] Thomas L. Saaty. Fundamentals of decision making and priority theory , 2000 .
[26] Marco Santochi,et al. Computer Aided Disassembly Planning: State of the Art and Perspectives , 2002 .
[27] Glyn Lawson,et al. Empirical evidence, evaluation criteria and challenges for the effectiveness of virtual and mixed reality tools for training operators of car service maintenance , 2015, Comput. Ind..
[28] Hak-Soo Mok,et al. Disassemblability of Mechanical Parts in Automobile for Recycling of Materials , 1996 .
[29] Jibin Jiang,et al. Research on the Multi-Index Comprehensive Evaluation Method of Electromechanical Products’ Disassembly , 2012 .
[30] Adolfo Crespo Marquez,et al. A practical method for the maintainability assessment in industrial devices using indicators and specific attributes , 2012, Reliab. Eng. Syst. Saf..
[31] B S Dhillon,et al. Human error in maintenance: An investigative study for the factories of the future , 2014 .
[32] J. P. Hao,et al. A maintainability analysis visualization system and its development under the AutoCAD environment , 2002 .
[33] Graham Thompson,et al. Review of maintainability design principles and their application to conceptual design , 2004 .
[34] Jong-Oh Park,et al. Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects , 2001 .
[35] Surendra M. Gupta,et al. Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .
[36] H.-P. Wiendahl,et al. A general approach to disassembly planning and control , 1999 .
[37] Ehud Kroll,et al. Disassembly analysis through time estimation and other metrics , 1999 .
[38] Sanchoy K. Das,et al. An approach for estimating the end-of-life product disassembly effort and cost , 2000 .
[39] Kenji Deguchi,et al. Reversibility and disassembly time of part connection , 2003 .
[40] Adil Baykasoglu. A review and analysis of “graph theoretical-matrix permanent” approach to decision making with example applications , 2012, Artificial Intelligence Review.
[41] J. A. Wylie,et al. Tribology: a system approach to the science and technology of friction, lubrication and wear: H. Czicos, published by Elsevier Scientific Publishing Company, Amsterdam, 1978: 400 pages; price $49.50 (Dfl 119.0) , 1979 .
[42] Sanchoy K. Das,et al. Evaluating the unfastening effort in design for disassembly and serviceability , 2004 .
[43] H. Ryser,et al. Matrix factorizations of determinants and permanents , 1966 .
[44] Ahmad Baharuddin Abdullah,et al. Determination of Maintainability Index Based on Assembly Criteria , 2006 .
[45] M. H. Wang,et al. Evaluation policies and automotive recovery options according to the European Union Directive on end-of-life vehicles (ELV) , 2002 .
[46] Anders Berger,et al. Continuous improvement and kaizen: standardization and organizational designs , 1997 .
[47] Tore Markeset,et al. Maintenance cost evaluation of a system to be used in Arctic conditions: a case study , 2011 .
[48] Bert Bras,et al. Issues in the Automotive Parts Remanufacturing Industry - A Discussion of Results from Surveys Performed among Remanufacturers , 1998 .