Corrigendum to Optimum Tower Crane Selection and Supporting Design Management

To optimize tower crane selection and supporting design, lifting requirements (as well as stability) should be examined, followed by a review of economic feasibility. However, construction engineers establish plans based on data provided by equipment suppliers since there are no tools with which to thoroughly examine a support design’s suitability for various crane types, and such plans lack the necessary supporting data. In such cases it is impossible to optimize a tower crane selection to satisfy lifting requirements in terms of cost, and to perform lateral support and foundation design. Thus, this study is intended to develop an optimum tower crane selection and supporting design management method based on stability. All cases that are capable of generating an optimization of approximately 3,000 ~ 15,000 times are calculated to identify the candidate cranes with minimized cost, which are examined. The optimization method developed in the study is expected to support engineers in determining the optimum lifting equipment management.

[1]  Hung-Lin Chi,et al.  A Physics Based Simulation for Crane Manipulation and Cooperation , 2007 .

[2]  Won Kee Hong,et al.  Optimum Tower Crane Selection and Supporting Design Management , 2014 .

[3]  Tomás Lozano-Pérez,et al.  An algorithm for planning collision-free paths among polyhedral obstacles , 1979, CACM.

[4]  Colin S. Gray,et al.  A model for the selection of the optimum crane for construction sites , 1984 .

[5]  Yoo Sang Choo,et al.  Dynamic Analysis of Tower Cranes , 2005 .

[6]  한갑규,et al.  Tower Crane Foundation Design and Stability Review Model , 2007 .

[7]  Carl T. Haas,et al.  An Interactive Planning Environment for Critical Operations , 1996 .

[8]  Carl T. Haas,et al.  Computer‐Aided Planning for Heavy Lifts , 1993 .

[9]  Gary David Holt,et al.  Location optimization for a group of tower cranes , 1999 .

[10]  Satoshi Tamate,et al.  Analyses of Instability in Mobile Cranes due to Ground Penetration by Outriggers , 2005 .

[11]  Aviad Shapira,et al.  Culture of Using Mobile Cranes for Building Construction , 1996 .

[12]  Leonhard E. Bernold,et al.  On-Line Assistance for Crane Operators , 1997 .

[13]  Aviad Shapira,et al.  Feasibility of automated monitoring of lifting equipment in support of project control , 2005 .

[14]  Mohamed Al-Hussein,et al.  D-CRANE: a database system for utilization of cranes , 2000 .

[15]  Mohamed Al-Hussein,et al.  Optimization Algorithm for Selection and on Site Location of Mobile Cranes , 2005 .

[16]  Shih-Chung Kang,et al.  Computational Methods for Coordinating Multiple Construction Cranes , 2008 .

[17]  Colin S. Gray,et al.  A systematic approach to the selection of an appropriate crane for a construction site , 1985 .

[18]  Koshy Varghese,et al.  COLLISION FREE PATH PLANNING OF COOPERATIVE CRANE MANIPULATORS USING GENETIC ALGORITHM , 2005 .

[19]  J. E. Beavers,et al.  Crane-Related Fatalities in the Construction Industry , 2006 .

[20]  Richard L. Francis,et al.  Single Crane Location Optimization , 1983 .

[21]  Carl T. Haas,et al.  Multiple Heavy Lifts Optimization , 1996 .

[22]  Sunkuk Kim,et al.  A System for the Selection of the Optimum Tower Cranes(Opt-TC) , 2007 .

[23]  Sunkuk Kim,et al.  A Model on the Stability Analysis of Supporting Structure of Climbing-Type Tower Cranes , 2008 .

[24]  Leonhard E. Bernold,et al.  INTELLIGENT TECHNOLOGY FOR TRUCK CRANE ACCIDENT PREVENTION , 1997 .

[25]  Hyun-Min Lee,et al.  The Optimization Algorithm for Wall Bracing Supports of Tower Cranes , 2010 .

[26]  Koshy Varghese,et al.  A Heavy Lift Planning System for Crane Lifts , 1997 .

[27]  Koshy Varghese,et al.  Automated Path Planning of Cooperative Crane Lifts Using Heuristic Search , 2003 .

[28]  Jang-Young Kim,et al.  Automatic optimal design algorithm for the foundation of tower cranes , 2011 .

[29]  Purdue Ect Team CRANIUM: Device for Improving Crane Productivity and Safety , 2007 .