Optimal Train Control At A JunctionIn The Main Line Rail Network UsingA New Object-oriented Signalling System Model
暂无分享,去创建一个
On a main line railway network with many junctions, the delay of a train is likely to cause delays to many other trains, especially because of conflicts at junctions. Optimising one junction, however, may have an adverse effect on other parts of the rail network because of the mixed-traffic situation of most main line railways. To approach the complicated problem of optimal re-scheduling in response to the delay of a train, an efficient algorithm must be sought. The authors have taken a junction as an example, and have performed numerical optimisation on a case when the services through this junction are disrupted. The objective criterion is the weighted sum of train times. The optimisation program uses the Object-Oriented Multi-Train Simulator (OOMTS) developed by Birmingham University, as an embedded simulator. In the optimisation routine, a Genetic Algorithm (GA) was used to optimise the order of route setting. In this paper, the authors give details of a model junction, and a brief explanation of the OOMTS. The authors then explain how a GA can be applied to solve this problem, especially the chromosomal expression of the problem. The results of numerical optimisations for different weighting parameters are shown based on which the authors discuss the feasibility of the proposed method.
[1] B. Mellitt,et al. Simulator for studying operational and power-supply conditions in rapid-transit railways , 1978 .
[2] Paul Weston,et al. An object-oriented signalling system model for the study of delay minimisation by on-line train control , 2006 .
[3] Franz Rothlauf,et al. Representations for genetic and evolutionary algorithms , 2002, Studies in Fuzziness and Soft Computing.