Application of Delphi method in construction engineering and management research: A quantitative perspective
暂无分享,去创建一个
Albert P.C. Chan | Ming Shan | Yi Hu | Yun Le | Effah Ernest Ameyaw | Y. Hu | A. Chan | Y. Le | E. Ameyaw | M. Shan
[1] Cheng-Ru Wu,et al. Optimizing resource-based allocation for senior citizen housing to ensure a competitive advantage using the analytic hierarchy process , 2008 .
[2] Bo Xia,et al. Identification of key competences of design‐builders in the construction market of the People’s Republic of China (PRC) , 2009 .
[3] Paul Chinowsky,et al. Measuring achievement of learning organizations in construction , 2007 .
[4] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[5] Debasis Sarkar,et al. Design and Application of Risk Adjusted Cumulative Sum for Strength Monitoring of Ready Mixed Concrete , 2010 .
[6] Carolyn Hicks,et al. Estimating as a profession in UK construction , 2007 .
[7] D. Spiegelhalter,et al. Consensus development methods, and their use in clinical guideline development. , 1998, Health technology assessment.
[8] J. Keith Murnighan,et al. Group Confidence Pressures in Iterative Decisions , 1982 .
[9] Paul Chinowsky,et al. Safety risk interactions among highway construction work tasks , 2011 .
[10] F. Hasson,et al. A critical review of the Delphi technique as a research methodology for nursing. , 2001, International journal of nursing studies.
[11] Chia-Chien Hsu,et al. The Delphi Technique: Making Sense of Consensus , 2007 .
[12] S. Cochran,et al. Use of self-ratings to improve group estimates: Experimental evaluation of delphi procedures , 1970 .
[13] Albert P.C. Chan,et al. Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study , 2007 .
[14] Denise Bower,et al. What risks are common to or amplified in programmes: Evidence from UK public sector infrastructure schemes , 2011 .
[15] K. C. Iyer,et al. Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling , 2010 .
[16] Chau Kwong Wing,et al. The ranking of construction management journals , 1997 .
[17] Ren-Jye Dzeng,et al. Evaluating project teaming strategies for construction of Taipei 101 using resource-based theory , 2005 .
[18] Heng Li,et al. Knowledge-driven ANP approach to vendors evaluation for sustainable construction , 2008 .
[19] Alfredo del Caño,et al. Integrated Methodology for Project Risk Management , 2002 .
[20] Awad S. Hanna,et al. Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management , 2008 .
[21] Albert P.C. Chan,et al. Developing a Fuzzy Risk Allocation Model for PPP Projects in China , 2010 .
[22] Chang-Taek Hyun,et al. Effect of Delivery Methods on Design Performance in Multifamily Housing Projects , 2008 .
[23] Murray Turoff,et al. The Delphi Method: Techniques and Applications , 1976 .
[24] Lee-kuo Lin,et al. Structure development and performance evaluation of construction knowledge management system , 2011 .
[25] Albert P.C. Chan,et al. Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations , 2011 .
[26] Sathyanarayanan Rajendran,et al. Development and Initial Validation of Sustainable Construction Safety and Health Rating System , 2009 .
[27] David Arditi,et al. Factors Affecting International Construction , 2005 .
[28] John-Paris Pantouvakis,et al. Improving qualifications‐based selection by use of the fuzzy Delphi method , 2009 .
[29] Michael Riley,et al. New Project Procurement Process , 2001 .
[30] Eddy M. Rojas,et al. Research Validation: Challenges and Opportunities in the Construction Domain , 2010 .
[31] Aviad Shapira,et al. AHP-Based Equipment Selection Model for Construction Projects , 2005 .
[32] Caroline T. W. Chan. The principal factors affecting construction project overhead expenses: an exploratory factor analysis approach , 2012 .
[33] Albert P.C. Chan,et al. A computerized model for measuring and benchmarking the partnering performance of construction projects , 2009 .
[34] David Arditi,et al. Perceptions of Process Quality in Building Projects , 1999 .
[35] Beliz Ozorhon,et al. Using analytic network process to assess business failure risks of construction firms , 2010 .
[36] Mohan M. Kumaraswamy,et al. Selecting sustainable teams for PPP projects , 2008 .
[37] G. J. Boris Allan,et al. Ordinal-Scaled Variables and Multivariate Analysis: Comment on Hawkes , 1976, American Journal of Sociology.
[38] Aminah Robinson Fayek,et al. Fuzzy Numbers in Cost Range Estimating , 2007 .
[39] Albert P.C. Chan,et al. Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia , 2012 .
[40] Francis K. Adams. Expert elicitation and Bayesian analysis of construction contract risks: an investigation , 2006 .
[41] Uma G. Gupta,et al. Theory and applications of the Delphi technique: A bibliography (1975–1994) , 1996 .
[42] Albert P.C. Chan,et al. Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study , 2009 .
[43] Mostafa Khanzadi,et al. Fuzzy adaptive decision making model for selection balanced risk allocation , 2012 .
[44] Thomas L. Saaty,et al. Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .
[45] G. Norman. Likert scales, levels of measurement and the “laws” of statistics , 2010, Advances in health sciences education : theory and practice.
[46] Shinhong Kim,et al. An integrated approach for interdependent information system project selection , 2001 .
[47] Jieh-Haur Chen,et al. Quantifying Impact Factors of Corporate Financing: Engineering Consulting Firms , 2008 .
[48] Thomas L. Saaty,et al. Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .
[49] Albert P.C. Chan,et al. Empirical study to investigate the difficulties of implementing safety practices in the repair and maintenance sector in Hong Kong , 2012 .
[50] Patrick T.I. Lam,et al. Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .
[51] Nashwan Dawood,et al. Development of 4D based performance indicators in construction industry , 2009 .
[52] John A. Gambatese,et al. Population and Initial Validation of a Formal Model for Construction Safety Risk Management , 2010 .
[53] Thayaparan Gajendran,et al. Integration of information and communication technology: Influence of the cultural environment , 2007 .
[54] John A. Gambatese,et al. Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .
[55] N. Dalkey,et al. The Delphi Method, III: Use of Self-Ratings To Improve Group Estimates , 1969 .
[56] Francis K. Adams. Risk perception and Bayesian analysis of international construction contract risks: The case of payment delays in a developing economy , 2008 .
[57] Kumar Neeraj Jha,et al. Analyses and evaluation of irregularities in public procurement in India , 2011 .
[58] Bon-Gang Hwang,et al. Identifying the critical risks in underground rail international construction joint ventures: Case study of Singapore , 2013 .
[59] Jon A. Krosnick,et al. An introduction to survey research, polling, and data analysis , 1996 .
[60] Kuo-Liang Lin,et al. Human Resource Allocation for Remote Construction Projects , 2011 .
[61] Albert P.C. Chan,et al. Identification of selection criteria for operational variations of the design-build system : a delphi study in China , 2012 .
[62] Weisheng Lu,et al. Improved SWOT Approach for Conducting Strategic Planning in the Construction Industry , 2010 .
[63] Kw Chau. The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong , 1995 .
[64] Patrick T.I. Lam,et al. Application of Delphi method in selection of procurement systems for construction projects , 2001 .
[65] John A. Gambatese,et al. Construction Safety Risk Mitigation , 2009 .
[66] David Arditi,et al. International Expansion Decision for Construction Companies , 2005 .
[67] Aminah Robinson Fayek,et al. Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities , 2011 .
[68] Andrew Stranieri,et al. ToolSHeDTM: The development and evaluation of a decision support tool for health and safety in construction design , 2008 .
[69] Albert P.C. Chan,et al. Key competences of design-build clients in China , 2010 .
[70] F. Hasson,et al. Research guidelines for the Delphi survey technique. , 2000, Journal of advanced nursing.
[71] Chin-Tsai Lin,et al. Optimal Selection of Location for Taiwanese Hospitals to Ensure a Competitive Advantage by Using the Analytic Hierarchy Process and Sensitivity Analysis , 2007 .
[72] Matthew R. Hallowell,et al. Interrelationships among Highly Effective Construction Injury Prevention Strategies , 2011 .
[73] A. Chan,et al. Understanding the risks in China's PPP projects: ranking of their probability and consequence , 2011 .
[74] Ludovic-Alexandre Vidal,et al. Measuring project complexity using the Analytic Hierarchy Process , 2011 .
[75] Bon-Gang Hwang,et al. Risk management in small construction projects in Singapore: Status, barriers and impact , 2014 .
[76] James T. O'Connor,et al. Optimizing Implementation of Value Management Processes for Capital Projects , 2005 .
[77] S. Siegel,et al. Nonparametric Statistics for the Behavioral Sciences , 2022, The SAGE Encyclopedia of Research Design.
[78] Ioannis E. Tsolas,et al. Sustainable construction and drivers of change in Greece: a Delphi study , 2006 .
[79] Farnad Nasirzadeh,et al. Integrating system dynamics and fuzzy logic modelling for construction risk management , 2008 .
[80] John A. Gambatese,et al. Activity-Based Safety Risk Quantification for Concrete Formwork Construction , 2009 .
[81] David Arditi,et al. Evaluating the Quality Performance of Pavement Contractors , 2012 .
[82] Marcello Braglia,et al. Application of the AHP methodology in making a proposal for a public work contract , 2006 .
[83] Albert P.C. Chan,et al. Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .
[84] Aviad Shapira,et al. Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes , 2009 .
[85] Jung-Ho Yu,et al. Critical success factors for urban regeneration projects in Korea , 2011 .
[86] A. Carr,et al. Primary total hip replacement surgery: a systematic review of outcomes and modelling of cost-effectiveness associated with different prostheses. , 1998, Health technology assessment.
[87] Jae-On Kim,et al. Multivariate Analysis of Ordinal Variables , 1975, American Journal of Sociology.
[88] T. J. Shields,et al. Towards the development of a fire safety systems evaluation for public assembly buildings , 1990 .
[89] Bon-Gang Hwang,et al. Investigating the client-related rework in building projects: The case of Singapore , 2014 .
[90] F. Hasson,et al. The Delphi Technique in Nursing and Health Research , 2011 .
[91] Albert P.C. Chan,et al. Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong , 2008 .
[92] Snehamay Khasnabis,et al. Comparative Study of Two Techniques of Transit Performance Assessment: AHP and GAT , 2002 .
[93] Alfredo del Caño,et al. Downside Risks in Construction Projects Developed by the Civil Service: The Case of Spain , 2006 .
[94] Jongwon Seo,et al. Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea , 2008 .
[95] M. Bohanec,et al. The Analytic Hierarchy Process , 2004 .
[96] Amm Liu,et al. Research Methods for Construction (3rd ed.) , 2008 .
[97] Samuel DiGangi,et al. Assessing unidimensionality: A comparison of Rasch modeling, Parallel analysis, and TETRAD , 2007 .
[98] C Hsu,et al. THE DELPHI TECHNIQUE: MAKING SENSE OF CONSENSUS PRACTICAL ASSESSMENT , 2007 .
[99] Albert P.C. Chan,et al. Measuring complexity for building projects: a Delphi study , 2012 .
[100] Leo L. Pipino,et al. A pilot study of fuzzy set modification of Delphi , 1985 .
[101] Albert P.C. Chan,et al. Overview of the application of "fuzzy techniques" in construction management research , 2009 .
[102] Gary E Pivo,et al. Responsible property investment criteria developed using the Delphi Method , 2008 .
[103] Nang-Fei Pan,et al. FUZZY AHP APPROACH FOR SELECTING THE SUITABLE BRIDGE CONSTRUCTION METHOD , 2008 .
[104] Hugh McKenna,et al. Research guidelines for the Delphi survey technique: Delphi survey technique , 2000 .
[105] V. M. Rao Tummala,et al. Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project , 1999 .
[106] L. S. Ganesh,et al. Modelling and assessment of critical risks in BOT road projects , 2006 .
[107] C. Chau,et al. A Delphi study on building services engineers' core competence and statutory role in Hong Kong , 2012 .