Application of Delphi method in construction engineering and management research: A quantitative perspective

AbstractThe Delphi method has been used as a main research method by a growing number of researchers in the Construction Engineering and Management (CEM) field in the past two decades. Although a number of studies are available on the use of Delphi, few researchers fully examine the potential of the Delphi method in the combined use of statistical techniques, which is an inevitable trend for future Delphi research. This paper aims to review the combined use of Delphi and other quantitative methods in the CEM field based on a structured literature review of 88 relevant papers. All of the 88 papers are systematically identified from ten well-known peer-reviewed CEM journals published in the period of 1990–2012. Topic coverage, application requirements, and statistical techniques in the 88 Delphi papers are reviewed. The mix use of the Delphi method with three advanced modelling methods, such as Fuzzy sets, Analytical Hierarchy Process, and Analytical Network Process is also examined. These review results pr...

[1]  Cheng-Ru Wu,et al.  Optimizing resource-based allocation for senior citizen housing to ensure a competitive advantage using the analytic hierarchy process , 2008 .

[2]  Bo Xia,et al.  Identification of key competences of design‐builders in the construction market of the People’s Republic of China (PRC) , 2009 .

[3]  Paul Chinowsky,et al.  Measuring achievement of learning organizations in construction , 2007 .

[4]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[5]  Debasis Sarkar,et al.  Design and Application of Risk Adjusted Cumulative Sum for Strength Monitoring of Ready Mixed Concrete , 2010 .

[6]  Carolyn Hicks,et al.  Estimating as a profession in UK construction , 2007 .

[7]  D. Spiegelhalter,et al.  Consensus development methods, and their use in clinical guideline development. , 1998, Health technology assessment.

[8]  J. Keith Murnighan,et al.  Group Confidence Pressures in Iterative Decisions , 1982 .

[9]  Paul Chinowsky,et al.  Safety risk interactions among highway construction work tasks , 2011 .

[10]  F. Hasson,et al.  A critical review of the Delphi technique as a research methodology for nursing. , 2001, International journal of nursing studies.

[11]  Chia-Chien Hsu,et al.  The Delphi Technique: Making Sense of Consensus , 2007 .

[12]  S. Cochran,et al.  Use of self-ratings to improve group estimates: Experimental evaluation of delphi procedures , 1970 .

[13]  Albert P.C. Chan,et al.  Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study , 2007 .

[14]  Denise Bower,et al.  What risks are common to or amplified in programmes: Evidence from UK public sector infrastructure schemes , 2011 .

[15]  K. C. Iyer,et al.  Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling , 2010 .

[16]  Chau Kwong Wing,et al.  The ranking of construction management journals , 1997 .

[17]  Ren-Jye Dzeng,et al.  Evaluating project teaming strategies for construction of Taipei 101 using resource-based theory , 2005 .

[18]  Heng Li,et al.  Knowledge-driven ANP approach to vendors evaluation for sustainable construction , 2008 .

[19]  Alfredo del Caño,et al.  Integrated Methodology for Project Risk Management , 2002 .

[20]  Awad S. Hanna,et al.  Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management , 2008 .

[21]  Albert P.C. Chan,et al.  Developing a Fuzzy Risk Allocation Model for PPP Projects in China , 2010 .

[22]  Chang-Taek Hyun,et al.  Effect of Delivery Methods on Design Performance in Multifamily Housing Projects , 2008 .

[23]  Murray Turoff,et al.  The Delphi Method: Techniques and Applications , 1976 .

[24]  Lee-kuo Lin,et al.  Structure development and performance evaluation of construction knowledge management system , 2011 .

[25]  Albert P.C. Chan,et al.  Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations , 2011 .

[26]  Sathyanarayanan Rajendran,et al.  Development and Initial Validation of Sustainable Construction Safety and Health Rating System , 2009 .

[27]  David Arditi,et al.  Factors Affecting International Construction , 2005 .

[28]  John-Paris Pantouvakis,et al.  Improving qualifications‐based selection by use of the fuzzy Delphi method , 2009 .

[29]  Michael Riley,et al.  New Project Procurement Process , 2001 .

[30]  Eddy M. Rojas,et al.  Research Validation: Challenges and Opportunities in the Construction Domain , 2010 .

[31]  Aviad Shapira,et al.  AHP-Based Equipment Selection Model for Construction Projects , 2005 .

[32]  Caroline T. W. Chan The principal factors affecting construction project overhead expenses: an exploratory factor analysis approach , 2012 .

[33]  Albert P.C. Chan,et al.  A computerized model for measuring and benchmarking the partnering performance of construction projects , 2009 .

[34]  David Arditi,et al.  Perceptions of Process Quality in Building Projects , 1999 .

[35]  Beliz Ozorhon,et al.  Using analytic network process to assess business failure risks of construction firms , 2010 .

[36]  Mohan M. Kumaraswamy,et al.  Selecting sustainable teams for PPP projects , 2008 .

[37]  G. J. Boris Allan,et al.  Ordinal-Scaled Variables and Multivariate Analysis: Comment on Hawkes , 1976, American Journal of Sociology.

[38]  Aminah Robinson Fayek,et al.  Fuzzy Numbers in Cost Range Estimating , 2007 .

[39]  Albert P.C. Chan,et al.  Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia , 2012 .

[40]  Francis K. Adams Expert elicitation and Bayesian analysis of construction contract risks: an investigation , 2006 .

[41]  Uma G. Gupta,et al.  Theory and applications of the Delphi technique: A bibliography (1975–1994) , 1996 .

[42]  Albert P.C. Chan,et al.  Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study , 2009 .

[43]  Mostafa Khanzadi,et al.  Fuzzy adaptive decision making model for selection balanced risk allocation , 2012 .

[44]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[45]  G. Norman Likert scales, levels of measurement and the “laws” of statistics , 2010, Advances in health sciences education : theory and practice.

[46]  Shinhong Kim,et al.  An integrated approach for interdependent information system project selection , 2001 .

[47]  Jieh-Haur Chen,et al.  Quantifying Impact Factors of Corporate Financing: Engineering Consulting Firms , 2008 .

[48]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[49]  Albert P.C. Chan,et al.  Empirical study to investigate the difficulties of implementing safety practices in the repair and maintenance sector in Hong Kong , 2012 .

[50]  Patrick T.I. Lam,et al.  Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .

[51]  Nashwan Dawood,et al.  Development of 4D based performance indicators in construction industry , 2009 .

[52]  John A. Gambatese,et al.  Population and Initial Validation of a Formal Model for Construction Safety Risk Management , 2010 .

[53]  Thayaparan Gajendran,et al.  Integration of information and communication technology: Influence of the cultural environment , 2007 .

[54]  John A. Gambatese,et al.  Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .

[55]  N. Dalkey,et al.  The Delphi Method, III: Use of Self-Ratings To Improve Group Estimates , 1969 .

[56]  Francis K. Adams Risk perception and Bayesian analysis of international construction contract risks: The case of payment delays in a developing economy , 2008 .

[57]  Kumar Neeraj Jha,et al.  Analyses and evaluation of irregularities in public procurement in India , 2011 .

[58]  Bon-Gang Hwang,et al.  Identifying the critical risks in underground rail international construction joint ventures: Case study of Singapore , 2013 .

[59]  Jon A. Krosnick,et al.  An introduction to survey research, polling, and data analysis , 1996 .

[60]  Kuo-Liang Lin,et al.  Human Resource Allocation for Remote Construction Projects , 2011 .

[61]  Albert P.C. Chan,et al.  Identification of selection criteria for operational variations of the design-build system : a delphi study in China , 2012 .

[62]  Weisheng Lu,et al.  Improved SWOT Approach for Conducting Strategic Planning in the Construction Industry , 2010 .

[63]  Kw Chau The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong , 1995 .

[64]  Patrick T.I. Lam,et al.  Application of Delphi method in selection of procurement systems for construction projects , 2001 .

[65]  John A. Gambatese,et al.  Construction Safety Risk Mitigation , 2009 .

[66]  David Arditi,et al.  International Expansion Decision for Construction Companies , 2005 .

[67]  Aminah Robinson Fayek,et al.  Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities , 2011 .

[68]  Andrew Stranieri,et al.  ToolSHeDTM: The development and evaluation of a decision support tool for health and safety in construction design , 2008 .

[69]  Albert P.C. Chan,et al.  Key competences of design-build clients in China , 2010 .

[70]  F. Hasson,et al.  Research guidelines for the Delphi survey technique. , 2000, Journal of advanced nursing.

[71]  Chin-Tsai Lin,et al.  Optimal Selection of Location for Taiwanese Hospitals to Ensure a Competitive Advantage by Using the Analytic Hierarchy Process and Sensitivity Analysis , 2007 .

[72]  Matthew R. Hallowell,et al.  Interrelationships among Highly Effective Construction Injury Prevention Strategies , 2011 .

[73]  A. Chan,et al.  Understanding the risks in China's PPP projects: ranking of their probability and consequence , 2011 .

[74]  Ludovic-Alexandre Vidal,et al.  Measuring project complexity using the Analytic Hierarchy Process , 2011 .

[75]  Bon-Gang Hwang,et al.  Risk management in small construction projects in Singapore: Status, barriers and impact , 2014 .

[76]  James T. O'Connor,et al.  Optimizing Implementation of Value Management Processes for Capital Projects , 2005 .

[77]  S. Siegel,et al.  Nonparametric Statistics for the Behavioral Sciences , 2022, The SAGE Encyclopedia of Research Design.

[78]  Ioannis E. Tsolas,et al.  Sustainable construction and drivers of change in Greece: a Delphi study , 2006 .

[79]  Farnad Nasirzadeh,et al.  Integrating system dynamics and fuzzy logic modelling for construction risk management , 2008 .

[80]  John A. Gambatese,et al.  Activity-Based Safety Risk Quantification for Concrete Formwork Construction , 2009 .

[81]  David Arditi,et al.  Evaluating the Quality Performance of Pavement Contractors , 2012 .

[82]  Marcello Braglia,et al.  Application of the AHP methodology in making a proposal for a public work contract , 2006 .

[83]  Albert P.C. Chan,et al.  Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .

[84]  Aviad Shapira,et al.  Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes , 2009 .

[85]  Jung-Ho Yu,et al.  Critical success factors for urban regeneration projects in Korea , 2011 .

[86]  A. Carr,et al.  Primary total hip replacement surgery: a systematic review of outcomes and modelling of cost-effectiveness associated with different prostheses. , 1998, Health technology assessment.

[87]  Jae-On Kim,et al.  Multivariate Analysis of Ordinal Variables , 1975, American Journal of Sociology.

[88]  T. J. Shields,et al.  Towards the development of a fire safety systems evaluation for public assembly buildings , 1990 .

[89]  Bon-Gang Hwang,et al.  Investigating the client-related rework in building projects: The case of Singapore , 2014 .

[90]  F. Hasson,et al.  The Delphi Technique in Nursing and Health Research , 2011 .

[91]  Albert P.C. Chan,et al.  Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong , 2008 .

[92]  Snehamay Khasnabis,et al.  Comparative Study of Two Techniques of Transit Performance Assessment: AHP and GAT , 2002 .

[93]  Alfredo del Caño,et al.  Downside Risks in Construction Projects Developed by the Civil Service: The Case of Spain , 2006 .

[94]  Jongwon Seo,et al.  Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea , 2008 .

[95]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[96]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[97]  Samuel DiGangi,et al.  Assessing unidimensionality: A comparison of Rasch modeling, Parallel analysis, and TETRAD , 2007 .

[98]  C Hsu,et al.  THE DELPHI TECHNIQUE: MAKING SENSE OF CONSENSUS PRACTICAL ASSESSMENT , 2007 .

[99]  Albert P.C. Chan,et al.  Measuring complexity for building projects: a Delphi study , 2012 .

[100]  Leo L. Pipino,et al.  A pilot study of fuzzy set modification of Delphi , 1985 .

[101]  Albert P.C. Chan,et al.  Overview of the application of "fuzzy techniques" in construction management research , 2009 .

[102]  Gary E Pivo,et al.  Responsible property investment criteria developed using the Delphi Method , 2008 .

[103]  Nang-Fei Pan,et al.  FUZZY AHP APPROACH FOR SELECTING THE SUITABLE BRIDGE CONSTRUCTION METHOD , 2008 .

[104]  Hugh McKenna,et al.  Research guidelines for the Delphi survey technique: Delphi survey technique , 2000 .

[105]  V. M. Rao Tummala,et al.  Applying a Risk Management Process (RMP) to manage cost risk for an EHV transmission line project , 1999 .

[106]  L. S. Ganesh,et al.  Modelling and assessment of critical risks in BOT road projects , 2006 .

[107]  C. Chau,et al.  A Delphi study on building services engineers' core competence and statutory role in Hong Kong , 2012 .