Periodic and sequential preventive maintenance policies over a finite planning horizon with a dynamic failure law

The purpose of this study is to propose and model periodic and sequential preventive maintenance policies for a system that performs various missions over a finite planning horizon. Each mission can have different characteristics that depend on operational and environmental conditions. These proposed preventive maintenance policies are defined and modeled mathematically. The study of these two policies is based on a dynamic system failure law that takes into account the different missions performed. The first step is to determine the optimal business plan to achieve, i.e. the set of missions to perform in order to maximize the profit of missions minus maintenance costs. Thus, for each plan, we determine the maintenance planning considering two policies. The first preventive maintenance policy is periodic and the objective is to determine the optimal number of preventive maintenance to achieve. For the second policy, namely sequential, we calculate the optimal number of preventive maintenance intervals and the duration of these different intervals.

[1]  T. Nakagawa Periodic and sequential preventive maintenance policies , 1986 .

[2]  S. Rahman Reliability Engineering and System Safety , 2011 .

[3]  Mostafa Zandieh,et al.  A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling , 2009, J. Intell. Manuf..

[4]  Ming J. Zuo,et al.  General sequential imperfect preventive maintenance models , 2000 .

[5]  Waltraud Kahle,et al.  A general repair, proportional-hazards, framework to model complex repairable systems , 2003, IEEE Trans. Reliab..

[6]  Masaaki Kijima,et al.  Periodical replacement problem without assuming minimal repair , 1988 .

[7]  D.,et al.  Regression Models and Life-Tables , 2022 .

[8]  Sebastian Martorell,et al.  Age-dependent reliability model considering effects of maintenance and working conditions , 1999 .

[9]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[10]  Lifeng Xi,et al.  Preventive maintenance scheduling for repairable system with deterioration , 2010, J. Intell. Manuf..

[11]  C. Richard Cassady,et al.  Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine , 2005, Comput. Ind..

[12]  Daoud Ait Kadi,et al.  Optimal block replacement policies with multiple choice at failure , 1988 .

[13]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[14]  S. Özekici Optimal maintenance policies in random environments , 1995 .

[15]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[16]  J.-K. Chan,et al.  Modeling repairable systems with failure rates that depend on age and maintenance , 1993 .

[17]  Toshio Nakagawa,et al.  Maintenance Theory of Reliability , 2005 .

[18]  Y. Smeers,et al.  An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures , 1998 .

[19]  Laurent Doyen,et al.  Classes of imperfect repair models based on reduction of failure intensity or virtual age , 2004, Reliab. Eng. Syst. Saf..