Optimal Second-Stage Outsourcing

Manufacturers have recently begun outsourcing product assembly and completion tasks to their suppliers. Such outsourcing solves several contracting problems but generates new incentive frictions between manufacturers and their suppliers. In this paper, we analyze a manufacturer's decision to outsource an assembly (second-stage) task to a preestablished supplier. We find that outsourcing second-stage tasks becomes more attractive as the cost of either the first-or second-stage activity rises. Outsourcing becomes less attractive when the supplier is unable to accept large levels of liability. The manufacturer is shown to prefer more testing when she outsources assembly to her supplier as opposed to when she assembles products in house. Last, we find that the contracting frictions identified persist when the supplier's work can be tested individually, albeit imperfectly.

[1]  Karen L. Sedatole,et al.  Sourcing parts of complex products: Evidence on transactions costs, high-powered incentives and ex-post opportunism , 2000 .

[2]  Nicola Costantino,et al.  Subcontracting practices in USA homebuilding—an empirical verification of Eccles's findings 20 years later ☆ , 2002 .

[3]  D. Sappington Limited liability contracts between principal and agent , 1983 .

[4]  S. Helper,et al.  Determinants of trust in supplier relations: Evidence from the automotive industry in Japan and the United States , 1998 .

[5]  G T Watts,et al.  Risks and rewards. , 1977, British medical journal.

[6]  Paul E. Fischer,et al.  Special Issue on Design and Development: Performance Measurement and Design in Supply Chains , 2001, Manag. Sci..

[7]  Thomas W. Ross,et al.  Product Warranties and Double Moral Hazard , 1985 .

[8]  Paul E. Fischer,et al.  Information, Contracting, and Quality Costs , 2000 .

[9]  M. David The Theory of Incentives , 2006 .

[10]  David E. M. Sappington,et al.  Information, Incentives, and Organizational Mode , 1987 .

[11]  Madhav V. Rajan,et al.  The Revenue Implications of Financial and Operational Measures of Product Quality , 2001 .

[12]  Christian Laux,et al.  Limited Liability and Incentive Contracting with Multiple Projects , 2001 .

[13]  Carliss Y. Baldwin,et al.  Managing in an age of modularity. , 1997, Harvard business review.

[14]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[15]  Kashi R. Balachandran,et al.  Quality Implications of Warranties in a Supply Chain , 2005, Manag. Sci..