Title : Requirements Identification for 4 D Constraint-based Construction Planning and Control System

Author(s): Eknarin Sriprasert and Nashwan Dawood Institution(s): Centre for Construction Innovation Research, University of Teesside E-mail(s): s-e.sriprasert@tees.ac.uk, n.n.dawood@tees.ac.uk Abstract: Construction planning and control are identified among the top potential areas needing improvements. A traditional technique known as the Critical Path Method (CPM) has been widely criticised in terms of its inability to cope with nonprecedence constraints, difficulty to evaluate and communicate interdependencies, and inadequacy for work-face productions. Attempting to treat these deficiencies, substantial research efforts have resulted in a wide range of advancements including design of new planning and control methodologies and development of sophisticated computerised applications. However, these efforts have not effectively overcome all of the above CPM drawbacks and, therefore, have not yet provided a solution to the industry.

[1]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .

[2]  Raymond E. Levitt,et al.  OARPLAN: Generating project plans by reasoning about objects, actions and resources , 1988, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[3]  Bruce M. Woodworth,et al.  Identifying the critical sequence in a resource constrained project , 1988 .

[4]  Raymond E. Levitt,et al.  Artificial Intelligence Techniques for Generating Construction Project Plans , 1988 .

[5]  Raymond E. Levitt,et al.  Intelligent Planning of Construction Projects , 1990 .

[6]  Lloyd M. Waugh Constraint knowledge for construction scheduling , 1990, Expert Planning Systems.

[7]  Mustafa Pultar Progress-based construction scheduling , 1990 .

[8]  Robert D. Logcher,et al.  Integrating CAD with Construction‐Schedule Generation , 1991 .

[9]  Yeong W. Kim Resource-Driven Scheduling , 1991 .

[10]  C. William Ibbs,et al.  Sequencing Knowledge for Construction Scheduling , 1991 .

[11]  David E. Wilkins,et al.  Extending Artificial Intelligence Techniques for Hierarchical Planning , 1991 .

[12]  Anne H. Soukhanov,et al.  The american heritage dictionary of the english language , 1992 .

[13]  Issam A. Minkarah,et al.  An Automated Cost Planning System (ACPS) for Construction Projects , 1993 .

[14]  Jerry Brown,et al.  Multi-Constraints in Construction Planning , 1995 .

[15]  Abraham Warszawski,et al.  Knowledge-Based System for Construction Planning of High-Rise Buildings , 1995 .

[16]  Carl T. Haas,et al.  An Interactive Planning Environment for Critical Operations , 1996 .

[17]  Florian Aalami,et al.  Scheduling with Computer-Interpretable Construction Method Models , 1996 .

[18]  Ali Jaafari Time and priority allocation scheduling technique for projects , 1996 .

[19]  Hossam El-Bibany,et al.  PARAMETRIC CONSTRAINT MANAGEMENT IN PLANNING AND SCHEDULING: COMPUTATIONAL BASIS , 1997 .

[20]  Yvan J. Beliveau,et al.  SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .

[21]  Khaled A El-Rayes,et al.  Resource-driven scheduling of repetitive activities , 1998 .

[22]  Martin Fischer,et al.  Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .

[23]  David K. H. Chua,et al.  Integrated Production Scheduler for Construction Look-Ahead Planning , 1999 .

[24]  Sönke Hartmann,et al.  Project Scheduling under Limited Resources , 1999 .

[25]  Iris D. Tommelein,et al.  WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .

[26]  Aviad Shapira,et al.  VR-based planning of construction site activities , 1999 .

[27]  Shen Li Ju,et al.  Distributed Scheduling With Integrated Production Scheduler , 2000 .

[28]  Martin Fischer,et al.  Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .

[29]  Martin H. Levinson The American Heritage Dictionary of the English Language , 2000 .

[30]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[31]  Iris D. Tommelein,et al.  WorkMovePlan: Database for Distributed Planningand Coordination , 2000 .

[32]  Jonathan Jingshen Shi,et al.  Object-oriented resource-based planning method (ORPM) for construction , 2000 .

[33]  Amr A. Oloufa,et al.  Computer-Generated Building Data: Topological Information , 2001 .

[34]  David Greenwood,et al.  An efficient method for scheduling construction projects with resource constraints , 2001 .

[35]  Li Jun Shen,et al.  Constraint Modeling and Buffer Management With Integrated Production Scheduler , 2001 .

[36]  Hyun Jeong Choo,et al.  Requirements and Barriers to Adoption of Last Planner Computer Tools , 2001 .

[37]  Martin Fischer,et al.  Automated Generation of Work Spaces Required by Construction Activities , 2002 .