A Multiobjective Stochastic Production-Distribution Planning Problem in an Uncertain Environment Considering Risk and Workers Productivity

A multi-objective two stage stochastic programming model is proposed to deal with a multi-period multi-product multi-site production-distribution planning problem for a midterm planning horizon. The presented model involves majority of supply chain cost parameters such as transportation cost, inventory holding cost, shortage cost, production cost. Moreover some respects as lead time, outsourcing, employment, dismissal, workers productivity and training are considered. Due to the uncertain nature of the supply chain, it is assumed that cost parameters and demand fluctuations are random variables and follow from a pre-defined probability distribution. To develop a robust stochastic model, an additional objective functions is added to the traditional production-distribution-planning problem. So, our multi-objective model includes (i) the minimization of the expected total cost of supply chain, (ii) the minimization of the variance of the total cost of supply chain and (iii) the maximization of the workers productivity through training courses that could be held during the planning horizon. Then, the proposed model is solved applying a hybrid algorithm that is a combination of Monte Carlo sampling method, modified 𝜀-constraint method and L-shaped method. Finally, a numerical example is solved to demonstrate the validity of the model as well as the efficiency of the hybrid algorithm.

[1]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .

[2]  Sidney W. Hess,et al.  A Linear Programming Approach to Production and Employment Scheduling , 1960 .

[3]  Christoph Haehling von Lanzenauer Production and employment scheduling in multistage production systems , 1970 .

[4]  L. Lasdon,et al.  On a bicriterion formation of the problems of integrated system identification and system optimization , 1971 .

[5]  Allen L. Soyster,et al.  Technical Note - Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming , 1973, Oper. Res..

[6]  David A. Goodman,et al.  A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .

[7]  C. Hwang,et al.  An aggregate production planning model and application of three multiple objective decision methods , 1980 .

[8]  A. Ravindran,et al.  Computational feasibility of multi-criteria models of production, planning and scheduling , 1988 .

[9]  Rasaratnam Logendran,et al.  Aggregate production planning — A survey of models and methodologies , 1992 .

[10]  J. Gupta,et al.  Is Time a Competitive Weapon among Manufacturing Firms , 1993 .

[11]  G. Buxey Production Planning and Scheduling for Seasonal Demand , 1993 .

[12]  Joseph B. Mazzola,et al.  Multiproduct production planning in the presence of work-force learning , 1998, Eur. J. Oper. Res..

[13]  Adil Baykasoğlu MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search , 2001 .

[14]  Markku Kuula,et al.  Multiperiod production planning carrying over set-up time , 2003 .

[15]  Nikolaos V. Sahinidis,et al.  Optimization under uncertainty: state-of-the-art and opportunities , 2004, Comput. Chem. Eng..

[16]  Reay-Chen Wang,et al.  Applying possibilistic linear programming to aggregate production planning , 2005 .

[17]  Mohammad Ali Soukhakian,et al.  A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning , 2009, Comput. Ind. Eng..

[18]  Stephen C. H. Leung,et al.  A goal programming model for aggregate production planning with resource utilization constraint , 2009, Comput. Ind. Eng..

[19]  Hartmut Stadtler,et al.  Production Planning & Scheduling , 2010 .