Models, guidelines and tools for the integration of collaborative processes in non-hierarchical manufacturing networks: a review

Collaborative practices among partners of manufacturing networks require the support of models (M), guidelines (G) and tools (T) which should take into account the network topology. Most of the M, G and T proposed in the literature were developed for hierarchical manufacturing networks (HN), but most of the real manufacturing networks, mainly composed by small-sized enterprises, are in fact non-hierarchical manufacturing networks (NHN). This paper focuses its research on the collaborative processes in NHN and its specific needs to be supported by M, G and T. Firstly, a literature review is conducted, allowing identifying a set of relevant collaborative processes in manufacturing networks (both HN and NHN), as well as the M, G and T designed to address each of them. Secondly, an analysis is carried out in order to determine how these M, G and T, designed for HN and/or NHN, adjust to the needs of the NHN. The assessment carried out reveals that some of the proposed M, G and T do not entirely fill the requirements demanded in NHN contexts. Each collaborative process is classified into a satisfactory, acceptable or unacceptable degree of coverage, depending on the extent into which the provided M, G and T can be applied in NHN. On this basis, it is concluded that some of the identified collaborative processes have a clear lack on the M, G and T for its proper application in NHN. Finally, potential future research lines are suggested in terms of providing solution approaches, missing in the literature, to adequately support the collaborative processes in NHN contexts.

[1]  Andrew Tuffin Work Programme , 1996 .

[2]  Chris N. Potts,et al.  Supply chain scheduling: Batching and delivery , 2003, Oper. Res..

[3]  Chih-Hung Tsai,et al.  A study of an enhanced simulation model for TOC supply chain replenishment system under capacity constraint , 2010, Expert Syst. Appl..

[4]  Cees T. A. M. de Laat,et al.  VLAM-G: a grid-based virtual laboratory , 2002, Future Gener. Comput. Syst..

[5]  Andrea Cardoni,et al.  Evaluating How Potential Pool of Partners Can Join Together in Different Types of Long Term Collaborative Networked Organizations , 2010, PRO-VE.

[6]  George Chryssolouris,et al.  Development of a web-based collaboration platform for manufacturing product and process design evaluation using virtual reality techniques , 2006, Int. J. Comput. Integr. Manuf..

[7]  Jenny A. Harding,et al.  Learning Collaboration Moderator Services: Supporting Knowledge Based Collaboration , 2010, PRO-VE.

[8]  Raul Poler Escoto,et al.  Forecasting model selection through out-of-sample rolling horizon weighted errors , 2011, Expert Syst. Appl..

[9]  Sridhar Seshadri,et al.  Policy mechanisms for supply chain coordination , 2000, IIE Transactions.

[10]  Hendrik Jähn,et al.  The Application of Incentive Mechanisms for the Participation of Enterprises in Collaborative Networks from an Economic Perspective , 2010, PRO-VE.

[11]  I. Karimi,et al.  Planning and Scheduling of Parallel Semicontinuous Processes. 2. Short-Term Scheduling , 1997 .

[12]  C. S. Ko,et al.  External partner selection using tabu search heuristics in distributed manufacturing , 2001 .

[13]  Yang Zheng,et al.  Collaborative design: Improving efficiency by concurrent execution of Boolean tasks , 2011, Expert Syst. Appl..

[14]  M. Christopher,et al.  Aligning product design with the supply chain: a case study , 2012 .

[15]  Jorge Hernandez Hormazabal SCAMM-CPA: A Supply Chain Agent- Based Modelling Methodology That Supports a Collaborative Planning Process , 2009 .

[16]  Andreas Fink,et al.  Supply chain coordination by means of automated negotiations , 2004, 37th Annual Hawaii International Conference on System Sciences, 2004. Proceedings of the.

[17]  Frédéric Wurtz,et al.  Towards Controlling the Acceptance Factors for a Collaborative Platform in Engineering Design , 2010, PRO-VE.

[18]  Raul Poler Escoto,et al.  Supply chain management. Modelling collaborative decision , 2003, EFTA 2003. 2003 IEEE Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.03TH8696).

[19]  Chihab Hanachi,et al.  Customising knowledge search in collaborative networked organisations through context-based query expansion , 2010 .

[20]  Diwakar Gupta,et al.  Supplier-manufacturer coordination in capacitated two-stage supply chains , 2006, Eur. J. Oper. Res..

[21]  Cheng-Liang Chen,et al.  Multiobjective Optimization for a Multienterprise Supply Chain Network , 2003 .

[22]  Selwyn Piramuthu,et al.  Multi-enterprise collaborative decision support system , 2012, Expert Syst. Appl..

[23]  Adolfo Steiger-Garção,et al.  Construction collaborative networks: the case study of a building information modelling-based office building project , 2013, Int. J. Comput. Integr. Manuf..

[24]  Fábio Müller Guerrini,et al.  Application of the EKD Process Model to Support the Coordination of Collaborative Networks in the Civil Construction Sector , 2010, PRO-VE.

[25]  Kary Främling,et al.  Collaborative planning forecasting and replenishment: new solutions needed for mass collaboration , 2002 .

[26]  John A. Zachman,et al.  A Framework for Information Systems Architecture , 1987, IBM Syst. J..

[27]  Hamieda Parker,et al.  Interfirm collaboration and the new product development process , 2000, Ind. Manag. Data Syst..

[28]  Nsw Roads and Maritime Services Strategic Network Planning , 2014 .

[29]  P. Pontrandolfo,et al.  Supply chain coordination by revenue sharing contracts , 2004 .

[30]  H. Haleh,et al.  A fuzzy MCDM model for allocating orders to suppliers in a supply chain under uncertainty over a multi-period time horizon , 2011, Expert Syst. Appl..

[31]  Hartmut Stadtler,et al.  Negotiation-based collaborative planning between supply chains partners , 2005, Eur. J. Oper. Res..

[32]  B. S. Sahay Supply chain collaboration: the key to value creation , 2003 .

[33]  Pedro Sanz Angulo,et al.  Design and Implementation of a Multi-agent Framework for the Selection of Partners in Dynamic VEs , 2009, PRO-VE.

[34]  D. Lambert,et al.  Issues in Supply Chain Management , 2000 .

[35]  Xiangdong Xu,et al.  Goal programming approach to solving network design problem with multiple objectives and demand uncertainty , 2012, Expert Syst. Appl..

[36]  Axel Hahn,et al.  Towards an Interoperability Framework for Model-Driven Development of Software Systems , 2006 .

[37]  F. Persson,et al.  Performance simulation of supply chain designs , 2002 .

[38]  Norman Sadeh,et al.  MASCOT: An agent-based architecture for dynamic supply chain creation and coordination in the internet economy , 2001 .

[39]  Luis M. Camarinha-Matos,et al.  Performance indicators for collaborative networks based on collaboration benefits , 2007 .

[40]  Winfried Lamersdorf,et al.  Electronic contracting with COSMOS-how to establish, negotiate and execute electronic contracts on the Internet , 1998, Proceedings Second International Enterprise Distributed Object Computing (Cat. No.98EX244).

[41]  Jason J. Jung,et al.  Taxonomy alignment for interoperability between heterogeneous virtual organizations , 2008, Expert Syst. Appl..

[42]  Yogesh Malhotra,et al.  Integrating knowledge management technologies in organizational business processes: getting real time enterprises to deliver real business performance , 2005, J. Knowl. Manag..

[43]  Luis Berasategi,et al.  A comprehensive framework for collaborative networked innovation , 2011 .

[44]  Víctor Anaya,et al.  Deriving Enterprise Engineering and Integration Frameworks from Supply Chain Management Practices , 2004, ICEIMT/DIISM.

[45]  António Lucas Soares,et al.  A Collaborative Decision Support Method to Design Performance Evaluation Systems in CNOs , 2010, PRO-VE.

[46]  Randall Davis,et al.  Frameworks for Cooperation in Distributed Problem Solving , 1988, IEEE Transactions on Systems, Man, and Cybernetics.

[47]  Naoufel Cheikhrouhou,et al.  Trust categories and their impacts on information exchange processes in vertical collaborative networked organisations , 2012, Int. J. Comput. Integr. Manuf..

[48]  Maria Jose Verdecho,et al.  An information architecture for a performance management framework by collaborating SMEs , 2010, Comput. Ind..

[49]  Lu Zhen,et al.  Recommender systems for personal knowledge management in collaborative environments , 2012, Expert Syst. Appl..

[50]  António Grilo,et al.  Reference framework for enhanced interoperable collaborative networks in industrial organisations , 2013, Int. J. Comput. Integr. Manuf..

[51]  Umit Bititci,et al.  Aligning value propositions in supply chains. , 2006 .

[52]  P. Miranda,et al.  INCORPORATING INVENTORY CONTROL DECISIONS INTO A STRATEGIC DISTRIBUTION NETWORK DESIGN MODEL WITH STOCHASTIC DEMAND , 2004 .

[53]  Charles J. Corbett,et al.  Optimal shared-savings contracts in supply chains: Linear contracts and double moral hazard , 2005, Eur. J. Oper. Res..

[54]  Hamed Kebriaei,et al.  A simultaneous multi-attribute soft-bargaining design for bilateral contracts , 2009, Expert Syst. Appl..

[55]  Togar M. Simatupang,et al.  The knowledge of coordination for supply chain integration , 2002, Bus. Process. Manag. J..

[56]  Y. S. Chang,et al.  Design of a distributed order promising system and environment for a globally dispersed supply chain , 2004, Int. J. Comput. Integr. Manuf..

[57]  Willy Picard,et al.  Social Service Brokerage based on UDDI and Social Requirements , 2010, PRO-VE.

[58]  Benoit Montreuil,et al.  Collaborative order management in distributed manufacturing , 2004 .

[59]  Raul Poler,et al.  Performance measurement system for business processes , 2007 .

[60]  S. Goyal,et al.  Integrated inventory models: The buyer-vendor coordination , 1989 .

[61]  Melisa Selviana Analisis dan Pemodelan Enterprise Architecture PT. Astragraphia, Tbk Bandung Menggunakan TOGAF (The Open Group Architecture Framework) , 2008 .

[62]  Alev Taskin Gumus,et al.  A multi-echelon inventory management framework for stochastic and fuzzy supply chains , 2009, Expert Syst. Appl..

[63]  B. Beamon Supply chain design and analysis:: Models and methods , 1998 .

[64]  Hau L. Lee,et al.  The bullwhip effect in supply chains , 2015, IEEE Engineering Management Review.

[65]  Lucy Everington,et al.  The Implications of Product Variety for Supply Network Design , 2013 .

[66]  A. Kampker,et al.  myOpenFactory , 2008, Int. J. Comput. Integr. Manuf..

[67]  Meikel Peters,et al.  Design, Implementation and Evaluation of a Performance Measurement System for Virtual Enterprises in the Aerospace Industry , 2008 .

[68]  Luis M. Camarinha-Matos,et al.  A method to analyse the alignment of core values in collaborative networked organisations , 2010 .

[69]  J. Mula,et al.  A social network‐based organizational model for improving knowledge management in supply chains , 2011 .

[70]  Wilhelm Dangelmaier,et al.  Supply chain management: a multi-agent system for collaborative production planning , 2005, 2005 IEEE International Conference on e-Technology, e-Commerce and e-Service.

[71]  Yoke San Wong,et al.  A two-stage manufacturing partner selection framework for virtual enterprises , 2004, Int. J. Comput. Integr. Manuf..

[72]  Qinan Wang,et al.  Coordination mechanisms of supply chain systems , 2007, Eur. J. Oper. Res..

[73]  Yuh-Min Chen,et al.  Distributed access control architecture and model for supporting collaboration and concurrency in dynamic virtual enterprises , 2008, Int. J. Comput. Integr. Manuf..

[74]  Raul Poler,et al.  Relevant problems in collaborative processes of non-hierarchical manufacturing networks , 2012 .

[75]  Surendra M. Gupta,et al.  Lead time uncertainty with back-ordering in multi-level product structures , 1994 .

[76]  Vineet Padmanabhan,et al.  Comments on "Information Distortion in a Supply Chain: The Bullwhip Effect" , 1997, Manag. Sci..

[77]  Larry C. Giunipero,et al.  Using Electronic Procurement to Facilitate Supply Chain Integration: An Exploratory Study of US-based Firms , 2008 .

[78]  Jatinder N. D. Gupta,et al.  Operational and financial effectiveness of e-collaboration tools in supply chain integration , 2004, Eur. J. Oper. Res..

[79]  Omar Boussaïd,et al.  UNICOMP: Identification of Enterprise Competencies to Build Collaborative Networks , 2010, PRO-VE.

[80]  Kirstin Zimmer,et al.  Supply Chain Coordination with Uncertain Just-in-Time Delivery , 2002 .

[81]  T. Ertay,et al.  An integrated multi-criteria group decision-making approach to efficient supplier selection and clustering using fuzzy preference relations , 2011, Int. J. Comput. Integr. Manuf..

[82]  Jorge Pinho de Sousa,et al.  Case studies on collaboration, technology and performance factors in business networks , 2013, Int. J. Comput. Integr. Manuf..

[83]  Xiaohang Yue,et al.  Production , Manufacturing and Logistics Demand forecast sharing in a dual-channel supply chain , 2006 .

[84]  Christoph Haehling von Lanzenauer,et al.  Coordinating supply chain decisions: an optimization model , 2002, OR Spectr..

[85]  Mikael Rönnqvist,et al.  Cost Allocation in Collaborative Forest Transportation , 2006, Eur. J. Oper. Res..

[86]  Américo Lopes Azevedo,et al.  Managing Performance to Align the Participants of Collaborative Networks: Case Studies Results , 2010, PRO-VE.

[87]  Pierpaolo Pontrandolfo,et al.  Inventory management in supply chains: a reinforcement learning approach , 2002 .

[88]  Bongju Jeong,et al.  Decentralized supply chain planning framework for third party logistics partnership , 2008, Comput. Ind. Eng..

[89]  Jean-Pierre Lorré,et al.  Semantic Reconciliation in Interoperability Management through Model-Driven Approach , 2010, PRO-VE.

[90]  Mahmoud Houshmand,et al.  A layered and modular platform to enable distributed CAx collaboration and support product data integration based on STEP standard , 2013, Int. J. Comput. Integr. Manuf..

[91]  Dieter Fensel,et al.  Semantic business process management: a vision towards using semantic Web services for business process management , 2005, IEEE International Conference on e-Business Engineering (ICEBE'05).

[92]  A Joch,et al.  Supply Chain Management , 2018, Encyclopedia of Social Network Analysis and Mining. 2nd Ed..

[93]  Andi Cakravastia,et al.  Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment , 2002 .

[94]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[95]  Lucy Everington,et al.  Integrated Framework for variety and customisation management , 2011, 2011 17th International Conference on Concurrent Enterprising.

[96]  E. T. Kirche,et al.  Maximizing supply chain profits with effective order management: integration of activity-based costing and theory of constraints with mixed-integer modelling , 2005 .

[97]  L. LeeHau,et al.  Information Distortion in a Supply Chain , 1997 .

[98]  Maria Jose Verdecho,et al.  A Structured Methodology to Implement Performance Measurement Systems in Collaborative Networks , 2011, PRO-VE.

[99]  Ángel Ortiz Bas,et al.  An enterprise engineering approach for the alignment of business and information technology strategy , 2011, Int. J. Comput. Integr. Manuf..

[100]  Douglas J. Thomas,et al.  Coordinated supply chain management , 1996 .

[101]  Henry C. W. Lau,et al.  Decision supporting functionality in a virtual enterprise network , 2000, Third International Conference on Information Technology and Applications (ICITA'05).

[102]  Yacine Rezgui,et al.  INTER-ENTERPRISE INFORMATION MANAGEMENT IN DYNAMIC VIRTUAL ENVIRONMENTS: THE OSMOS APPROACH , 2000 .

[103]  Rakesh Kumar Phanden,et al.  Integration of process planning and scheduling: a state-of-the-art review , 2011, Int. J. Comput. Integr. Manuf..

[104]  M. Vlachopoulou,et al.  A conceptual framework for supply chain collaboration: empirical evidence from the agri‐food industry , 2007 .

[105]  Raul Poler Escoto,et al.  Conceptual Framework for the Interoperability Requirements of Collaborative Planning Process , 2010, I-ESA.

[106]  Irem Ozkarahan,et al.  COLLABORATIVE PRODUCTION-DISTRIBUTION PLANNING IN SUPPLY CHAIN: A FUZZY GOAL PROGRAMMING APPROACH , 2008 .

[107]  Julie Stal-Le Cardinal,et al.  Aided Virtual Team Building System: Zooming in on Web 2.0 Tools and Competence Management , 2010, PRO-VE.

[108]  Costas D. Maranas,et al.  Managing demand uncertainty in supply chain planning , 2003, Comput. Chem. Eng..

[109]  Reggie Davidrajuh Identifying Potential Suppliers for Formation of Virtual Manufacturing Systems , 2002 .

[110]  Jia-Lang Seng,et al.  An intelligent XML-based multidimensional data cube exchange , 2012, Expert Syst. Appl..

[111]  Frédérique Biennier,et al.  Integration of Business and Industrial Knowledge on Services to Set Trusted Business Communities of Organisations , 2010, PRO-VE.

[112]  Hamideh Afsarmanesh,et al.  Ecolead And Cno Base Concepts , 2008 .

[113]  Peter B. Luh,et al.  Price-based approach for activity coordination in a supply network , 2003, IEEE Trans. Robotics Autom..

[114]  Juha Mykkänen,et al.  An evaluation and selection framework for interoperability standards , 2008, Inf. Softw. Technol..

[115]  Yi-Ming Tai,et al.  A Structural Approach to Measuring Uncertainty in Supply Chains , 2005, Int. J. Electron. Commer..

[116]  Benita M. Beamon,et al.  A multi-objective approach to simultaneous strategic and operational planning in supply chain design , 2000 .

[117]  Iiro Salkari,et al.  Partner Selection With Network Interdependencies: An Application , 2006, PRO-VE.

[118]  Sarada Prasad Sarmah,et al.  Buyer vendor coordination models in supply chain management , 2006, Eur. J. Oper. Res..

[119]  Liang Chen,et al.  Partner selection in a virtual enterprise under uncertain information about candidates , 2011, Expert Syst. Appl..

[120]  Raúl Poler Escoto,et al.  Collaborative forecasting management: fostering creativity within the meta value chain context , 2008 .

[121]  Hau L. Lee,et al.  Decentralized Multi-Echelon Supply Chains: Incentives and Information , 1999 .

[122]  Mohammad Mohammadi,et al.  Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups , 2011, Expert Syst. Appl..

[123]  Theodore J. Williams,et al.  The Purdue Enterprise Reference Architecture , 1992, DIISM.

[124]  François B. Vernadat,et al.  Interoperable enterprise systems: Principles, concepts, and methods , 2007, Annu. Rev. Control..

[125]  Cheng Wang,et al.  Towards the business–information technology alignment in cloud computing environment: anapproach based on collaboration points and agents , 2011, Int. J. Comput. Integr. Manuf..

[126]  C. Corbett,et al.  A Supplier's Optimal Quantity Discount Policy Under Asymmetric Information , 2000 .

[127]  Raul Poler Escoto,et al.  An Interoperable Platform to Implement Collaborative Forecasting in OEM Supply Chains , 2006, I-ESA.

[128]  Kepa Mendibil,et al.  Measuring and managing performance in extended enterprises , 2005 .

[129]  Michele Germani,et al.  Collaborative Design System for Supporting Dynamic Virtual Enterprises , 2010, PRO-VE.

[130]  Christoph Schneeweiss,et al.  Hierarchical coordination mechanisms within the supply chain , 2004, Eur. J. Oper. Res..

[131]  François Vernadat,et al.  Interoperable enterprise systems , 2006 .

[132]  Ronald C. Beckett,et al.  Collaborative network success and the variable nature of trust , 2012 .

[133]  Flavio Bonfatti,et al.  Autonomic Approach to Planning and Scheduling in Networked Small Factories , 2010, PRO-VE.

[134]  Josefa Mula,et al.  Capacity and material requirement planning modelling by comparing deterministic and fuzzy models , 2008 .

[135]  Claudia-Melania Chituc,et al.  A framework proposal for seamless interoperability in a collaborative networked environment , 2009, Comput. Ind..

[136]  Ricardo Jardim-Gonçalves,et al.  NEGOSEIO: A framework for negotiations toward Sustainable Enterprise Interoperability , 2012, Annu. Rev. Control..

[137]  G. Doumeingts,et al.  The GRAI-GIM reference model, architecture and methodology , 1996 .

[138]  Arun Kumar,et al.  An agent-based framework for collaborative negotiation in the global manufacturing supply chain network , 2006 .

[139]  Rubén Darío Franco,et al.  Modeling extended manufacturing processes with service-oriented entities , 2009 .

[140]  Ricardo J. Rabelo,et al.  A Systematic Approach for VE Partners Selection Using the SCOR Model and the AHP Method , 2005, PRO-VE.

[141]  Jeongsoo Lee,et al.  A collaborative design framework for the Korean automotive parts industry , 2013, Int. J. Comput. Integr. Manuf..

[142]  Zbigniew Paszkiewicz,et al.  MAPSS, a Multi-Aspect Partner and Service Selection Method , 2010, PRO-VE.

[143]  Richard Pibernik,et al.  An approach to inter-domain master planning in supply chains , 2007 .

[144]  Yan Lu,et al.  Ontology alignment for networked enterprise information system interoperability in supply chain environment , 2013, Int. J. Comput. Integr. Manuf..

[145]  Xun Xu,et al.  Computer-aided process planning – A critical review of recent developments and future trends , 2011, Int. J. Comput. Integr. Manuf..

[146]  A. Gunasekaran,et al.  A framework for supply chain performance measurement , 2004 .

[147]  Dávid Karnok,et al.  Information sharing in cooperative production networks , 2007 .

[148]  M. M. E. Alemany,et al.  An application to support the temporal and spatial distributed decision-making process in supply chain collaborative planning , 2011, Comput. Ind..

[149]  Mikael Rönnqvist,et al.  Generic Mechanisms for Coordinating Operations and Sharing Financial Benefits in Collaborative Logistics , 2010, PRO-VE.

[150]  Gérard P. Cachon Supply Chain Coordination with Contracts , 2003, Supply Chain Management.

[151]  Hartmut Stadtler,et al.  A framework for collaborative planning and state-of-the-art , 2009, OR Spectr..

[152]  Y.-E. Nahm,et al.  A hybrid multi-agent system architecture for enterprise integration using computer networks , 2005 .

[153]  Brian S. Fugate,et al.  SUPPLY CHAIN MANAGEMENT COORDINATION MECHANISMS , 2006 .

[154]  Alessandro Provetti,et al.  Knowledge Representation in Virtual Teams: A Perspective Approach for Synthetic Worlds , 2010, PRO-VE.

[155]  Srinivasan Raghunathan Interorganizational Collaborative Forecasting and Replenishment Systems and Supply Chain Implications , 1999 .

[156]  Jasone Astorga,et al.  A Privacy Enhancing Architecture for Collaborative Working Environments , 2010, PRO-VE.

[157]  Bernard Grabot,et al.  Integration of the Supplier Capacity for Choosing the Less Risky Schedule within an Uncertain Environment , 2010, PRO-VE.

[158]  Ricardo J. Rabelo Advanced Collaborative Business Ict Infrastructures , 2008 .

[159]  M. Yamashiro,et al.  A pragmatic approach for optimal selection of plant-specific process plans in a virtual enterprise , 2006 .

[160]  Raul Poler,et al.  A Methodology to Share Profits and Costs in Non-Hierarchical Networks , 2014 .

[161]  Guy Doumeingts,et al.  Architectures for enterprise integration and interoperability: Past, present and future , 2008, Comput. Ind..

[162]  Peng Liang,et al.  Lightweight Process Modeling for Virtual Enterprise Process Collaboration , 2010, PRO-VE.

[163]  Kazim Sari,et al.  On the benefits of CPFR and VMI: A comparative simulation study , 2008 .

[164]  Hamideh Afsarmanesh,et al.  Collaborative Networks in Support of Service-Enhanced Products , 2011, PRO-VE.

[165]  Raul Poler,et al.  Computing the Strategies Alignment in Collaborative Networks , 2014, I-ESA.

[166]  Alessandro Agnetis,et al.  Autonomous agents architectures and algorithms in flexible manufacturing systems , 2000 .

[167]  Raul Poler Escoto,et al.  Dynamic modelling of Decision Systems (DMDS) , 2002, Comput. Ind..

[168]  Christoph Schneeweiss,et al.  Distributed decision making in supply chain management , 2003 .

[169]  A. Sohal,et al.  Supply chain competitiveness: measuring the impact of location factors, uncertainty and manufacturin , 2005 .

[170]  Ricardo Chalmeta,et al.  SCIF-IRIS framework: a framework to facilitate interoperability in supply chains , 2013, Int. J. Comput. Integr. Manuf..

[171]  Luis M. Camarinha-Matos,et al.  Distributed process execution in collaborative networks , 2008 .

[172]  Yves Ducq,et al.  Methodology for Prior Evaluation of Interoperability , 2010, Working Conference on Virtual Enterprises.

[173]  Angel Ortiz,et al.  Conceptual framework for the characterization of the order promising process in a collaborative selling network context , 2009 .

[174]  M.-J. Chen,et al.  Cooperative capacity planning and resource allocation by mutual outsourcing using ant algorithm in a decentralized supply chain , 2009, Expert Syst. Appl..

[175]  Mohammad Kazem Haki,et al.  Inter-Organizational Information System Architecture: A Service-Oriented Approach , 2010, PRO-VE.

[176]  S. DAVID WU,et al.  Auction-theoretic coordination of production planning in the supply chain , 2000 .

[177]  Ping Jiang,et al.  Implementing Self-organising Virtual Enterprises Using Social Behaviour Nets , 2010, PRO-VE.

[178]  Maria Jose Verdecho,et al.  An Approach to Select Suppliers for Sustainable Collaborative Networks , 2010, PRO-VE.

[179]  Eb Erik Diks,et al.  Stock allocation in general multi-echelon distribution systems with (R, S) order-up-to-policies , 1997 .

[180]  Kun Chang Lee,et al.  MACE-SCM: A multi-agent and case-based reasoning collaboration mechanism for supply chain management under supply and demand uncertainties , 2007, Expert Syst. Appl..

[181]  M. Caridi,et al.  Improving supply-chain collaboration by linking intelligent agents to CPFR , 2005 .

[182]  Michele Dassisti,et al.  DI.2: Enterprise Interoperability-Framework and knowledge corpus-Advanced report , 2006 .

[183]  Michel Bigand,et al.  From BPMN 2.0 to the Setting-Up on an ESB - Application to an Interoperability Problem , 2010, PRO-VE.

[184]  Ricardo J. Rabelo,et al.  Supporting Software Services Discovery and Sharing in Collaborative Networks , 2010, PRO-VE.

[185]  César Garita,et al.  The PRODNET cooperative information management for industrial virtual enterprises , 2001, J. Intell. Manuf..

[186]  Kamran Moinzadeh,et al.  A Multi-Echelon Inventory System with Information Exchange , 2002, Manag. Sci..

[187]  Eonkyung Lee,et al.  Supplier selection and management system considering relationships in supply chain management , 2001, IEEE Trans. Engineering Management.

[188]  Umeshwar Dayal,et al.  Business Process Coordination: State of the Art, Trends, and Open Issues , 2001, VLDB.

[189]  Weiming Shen,et al.  Applications of agent-based systems in intelligent manufacturing: An updated review , 2006, Adv. Eng. Informatics.

[190]  A. H. M. Shamsuzzoha,et al.  Dynamic and collaborative business networks in the fashion industry , 2013, Int. J. Comput. Integr. Manuf..

[191]  Hamideh Afsarmanesh,et al.  Collaborative networks: a new scientific discipline , 2005, J. Intell. Manuf..

[192]  Lorenzo Tiacci,et al.  The innovative model of the Virtual Development Office for collaborative networked enterprises: the GPT network case study , 2013, Int. J. Comput. Integr. Manuf..

[193]  Paul W. P. J. Grefen,et al.  The 4W framework for B2B e-contracting , 2003, Int. J. Netw. Virtual Organisations.