Arrangement of material depots for line segment– modeled structures using continuous conditions
暂无分享,去创建一个
[1] Ka Chi Lam,et al. Dynamic construction site layout planning using max-min ant system , 2010 .
[2] Iris D. Tommelein,et al. SightPlan Model for Site Layout , 1992 .
[3] Iris D. Tommelein,et al. Dynamic layout planning using a hybrid incremental solution method , 1999 .
[4] Z. Drezner,et al. Replacing continuous demand with discrete demand in a competitive location model , 1997 .
[5] Hesham Osman,et al. A hybrid CAD-based construction site layout planning system using genetic algorithms , 2003 .
[6] Graham Winch,et al. Critical Space Analysis , 2006 .
[7] Jack Chin Pang Cheng,et al. A BIM-based automated site layout planning framework for congested construction sites , 2015 .
[8] Min-Yuan Cheng,et al. ArcSite: enhanced GIS for construction site layout , 1996 .
[9] Tarek Hegazy,et al. EvoSite: Evolution-Based Model for Site Layout Planning , 1999 .
[10] Peter E.D. Love,et al. Site-Level Facilities Layout Using Genetic Algorithms , 1998 .
[11] Osama Moselhi,et al. Computer-aided site layout planning , 2006 .
[12] Osama Moselhi,et al. A CAD-based model for site planning , 2004 .
[13] Mohammad A. Ammar,et al. Optimal Construction Site Layout Considering Safety and Environmental Aspects , 2008 .
[14] Georges Voronoi. Nouvelles applications des paramètres continus à la théorie des formes quadratiques. Premier mémoire. Sur quelques propriétés des formes quadratiques positives parfaites. , 1908 .
[15] Levente Mályusz,et al. Model of Arrangement of Final Material Depots for Concave Construction Sites in CSLP , 2015 .
[16] C. M. Tam,et al. GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction , 2003 .
[17] Mohsen Andayesh,et al. The constructs of site layout modeling: an overview , 2015 .
[18] Saad H.S. Al-Jibouri,et al. GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING , 2002 .
[19] A. Weber,et al. Alfred Weber's Theory of the Location of Industries , 1930 .
[20] L. Mályusz,et al. Arrangement of Material Depots at Construction Site by Using Continuous Conditions , 2016 .