A Decision Support System for Advanced Composites Manufacturing Cost Estimation

The increased use of advanced composites in aerospace manufacturing has led to the development of new production processes and technology The implementation of advanced composites manufacturing technology is poorly served by traditional cost accounting methods, which distort costs by using inappropriate volume-based allocations of overhead. Activity-based costing has emerged as a methodology, which provides accurate allocation of costs to products or activities by their usage of company resources. Better designs may also be produced if designers could evaluate the cost implications of their choices early in the design process. This paper describes a methodology whereby companies can improve the quality of product cost estimation at the conceptual design phase using intelligent searching and arrangement of existing accounting data enabling designers to access the activity cost information more readily. This concept has a considerable scope for application in industry because it will allow companies, to make better use of the said information already recorded in their information system.

[1]  Callie Berliner,et al.  Cost Management for Today's Advanced Manufacturing: The Cam-I Conceptual Design , 1988 .

[2]  H. Johnson,et al.  Activity-Based Management: Past, Present, and Future , 1991 .

[3]  Hamid R. Parsaei,et al.  Principles of concurrent engineering , 1993 .

[4]  Christopher C. Funke Concurrent Engineering in the Aircraft Industry and It's Relationship to the Development Process , 1997 .

[5]  Carol Jean McNair World-Class Accounting and Finance , 1993 .

[6]  Timothy G. Gutowski,et al.  Development of a theoretical cost model for advanced composite fabrication , 1994 .

[7]  Wolter J. Fabrycky,et al.  Systems engineering and analysis , 1981 .

[8]  Ron Hess,et al.  Aircraft Airframe Cost Estimating Relationships , 1987 .

[9]  Fariborz Tayyari,et al.  A Totally Integrated Manufacturing Cost Estimating System (TIMCES) , 1992 .

[10]  Thomas H. Johnson,et al.  Relevance Lost: The Rise and Fall of Management Accounting , 1987 .

[11]  藤原 瑞穂,et al.  Peter B.B. Turney, COMMON CENTS : The ABC Performance Breakthrough , 1997 .

[12]  Rebecca Henderson,et al.  Manufacturing Costs for Advanced Composites Aerospace Parts , 1991 .

[13]  George Ellwood Dieter,et al.  Engineering Design: A Materials and Processing Approach , 1983 .

[14]  Susan A. Resetar,et al.  Advanced Airframe Structural Materials: A Primer and Cost Estimating Methodology , 1991 .

[15]  R. Cooper,et al.  Implementing an Activity-Based Cost System , 1990 .

[16]  Vicki S. Johnson,et al.  Minimizing life cycle cost for subsonic commercial aircraft , 1990 .

[17]  Athar Murtuza The New Accounting Manual: A Guide to the Documentation Process , 1995 .

[18]  Madhav V. Rajan,et al.  Cost Accounting: A Managerial Emphasis , 1972 .

[19]  Vijay Govindarajan,et al.  Strategic Cost Management , 1993 .

[20]  Alfredo Herrera The Effectiveness of Design for Manufacturing and Assembly as Applied to the Design of the AH64D Helicopter , 1997 .

[21]  K. L. Edwards Towards more effective decision support in materials and design engineering , 1994 .

[22]  D. H. Middleton,et al.  Composite materials in aircraft structures , 1990 .

[23]  I. H. Rettie,et al.  Role of Figures of Merit in Design Optimization and Technology Assessment , 1981 .

[24]  James D Johannes,et al.  Cost Estimator’s Reference Manuel (2nd edition) , 1996 .

[25]  Tim W. Scoville The Role of Castings in Part Consolidation , 1997 .

[26]  H. Thomas Johnson,et al.  Memo to global competitors: it is time to replace cost accounting with process based information , 1992 .

[27]  Masoud Rais-Rohani,et al.  Toward manufacturing and cost considerations in multidisciplinary aircraft design , 1996 .

[28]  Geoffrey Boothroyd,et al.  Product design for manufacture and assembly , 1994, Comput. Aided Des..

[29]  Bruce D'Ambrosio,et al.  Taxonomy for classifying engineering decision problems and support systems , 1995, Artif. Intell. Eng. Des. Anal. Manuf..

[30]  Dean T. Mook,et al.  An MDO design methodology for the concurrent aerodynamic/cost design of MAGLEV vehicles , 1996 .

[31]  Yasuhiro Yamaguchi,et al.  Composite Materials for Aircraft Structures. , 1995 .

[32]  Timos K. Sellis,et al.  A frame-based model for large manufacturing databases , 1991, J. Intell. Manuf..

[33]  Peter B. B. Turney,et al.  Common cents : the ABC performance breakthrough : how to succeed with activity-based costing , 1991 .

[34]  Bert Bras,et al.  THE USE OF ACTIVITY-BASED COSTING, UNCERTAINTY, AND DISASSEMBLY ACTION CHARTS IN DEMANUFACTURE COST ASSESSMENTS , 1995 .

[35]  George Lubin,et al.  Handbook of Composites , 1982 .

[36]  Barry J. Brinker,et al.  Handbook of cost management , 1995 .

[37]  Robert S. Kaplan,et al.  The design of cost management systems : text, cases, and readings , 1991 .

[38]  Gerhard Johannes Plenert The Plant Operations Handbook: A Tactical Guide to Everyday Management , 1992 .

[39]  L. Ilcewicz,et al.  The use of COSTADE in developing composite commercial aircraft fuselage structures , 1994 .

[40]  Daniel P. Raymer,et al.  Aircraft Design: A Conceptual Approach , 1989 .

[41]  Shahid Ansari,et al.  Target Costing: The Next Frontier in Strategic Cost Management , 1997 .