An Advanced Construction Supply Nexus Model

[1]  Shu‐Hua Chen,et al.  Effects of Moist Froude Number and CAPE on a Conditionally Unstable Flow over a Mesoscale Mountain Ridge , 2005 .

[2]  Tzvi Raz,et al.  Optimal timing of project control points , 2000, Eur. J. Oper. Res..

[3]  Peter Guthrie,et al.  WASTE MINIMISATION AND RECYCLING IN CONSTRUCTION - A REVIEW , 1995 .

[4]  Lansford C. Bell,et al.  Costs and benefits of materials management systems , 1987 .

[5]  Zohar J. Herbsman A+B BIDDING METHOD--HIDDEN SUCCESS STORY FOR HIGHWAY CONSTRUCTION , 1995 .

[6]  Will Hughes,et al.  Risk and Price in the Bidding Process of Contractors , 2011 .

[7]  Kyung Ho Lee,et al.  Integration of evolutional BOMs for design of ship outfitting equipment , 2012, Comput. Aided Des..

[8]  Bo‐Christer Björk,et al.  A formalised model of the information and materials handling activities in the construction process , 2002 .

[9]  Ching-Lai Hwang,et al.  Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.

[10]  Paul. Olomolaiye,et al.  Automation problems in materials management on large construction projects , 1990 .

[11]  Edward J. Jaselskis,et al.  Optimal Allocation of Project Management Resources for Achieving Success , 1991 .

[12]  David R. Riley,et al.  Fundamental principles of site material management , 2005 .

[13]  David N. Ford,et al.  A real options approach to valuing strategic flexibility in uncertain construction projects , 2002 .

[14]  Wenhui Zhang,et al.  Handover decision using fuzzy MADM in heterogeneous networks , 2004, 2004 IEEE Wireless Communications and Networking Conference (IEEE Cat. No.04TH8733).

[15]  Ali Afzal,et al.  Workflow Enactment in ICENI , 2004 .

[16]  Erick Cantú-Paz,et al.  Efficient and Accurate Parallel Genetic Algorithms , 2000, Genetic Algorithms and Evolutionary Computation.

[17]  Mohan Raj Manavazhi,et al.  Material and equipment procurement delays in highway projects in Nepal , 2002 .

[18]  Gary W. Fischer,et al.  A conceptual structure and issues for an object-oriented bill of materials (BOM) data model , 1994 .

[19]  J. D. Borcherding,et al.  Major factors influencing craft productivity in nuclear power plant construction , 1980 .

[20]  Yoshiro Yamada,et al.  A Concerted International Project to Establish High-Temperature Fixed Points for Primary Thermometry , 2007 .

[21]  Carlos H. Caldas,et al.  Integration of Automated Data Collection Technologies for Real-Time Field Materials Management , 2004 .

[22]  A. Crane Rethinking construction. , 1999, Health estate.

[23]  Will Hughes,et al.  Risk under performance‐based contracting in the UK construction sector , 2007 .

[24]  Gerardo Santana Classification of construction projects by scales of complexity , 1990 .

[25]  Nashwan Dawood,et al.  Lean enterprise web-based information system for construction (LEWIS): a framework , 2002 .

[26]  Xavier Llorà,et al.  Bounding the Effect of Noise in Multiobjective Learning Classifier Systems , 2003, Evolutionary Computation.

[27]  Thierry Devos,et al.  Conflicts among human values and trust in institutions. , 2002, The British journal of social psychology.

[28]  Witold Pedrycz,et al.  Fuzzy Monte Carlo Simulation and Risk Assessment in Construction , 2010, Comput. Aided Civ. Infrastructure Eng..

[29]  P.N. Tran,et al.  Comparison of MADM decision algorithms for interface selection in heterogeneous wireless networks , 2008, 2008 16th International Conference on Software, Telecommunications and Computer Networks.

[30]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[31]  Charles Y. J. Cheah,et al.  Dynamics of strategic management in the Chinese construction industry , 2005 .

[32]  Qi Xu,et al.  Integration design of material flow management in an e-business manufacturing environment , 2006, Decis. Support Syst..

[33]  Rafael Sacks,et al.  Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities , 2008 .

[34]  Mehdi Ravanshadnia,et al.  Hybrid fuzzy MADM project-selection model for diversified construction companies , 2010 .

[35]  Chimay J. Anumba,et al.  The need for the creation of knowledge chains in construction , 2008 .

[36]  C. William Ibbs,et al.  TOWARD A NEW PARADIGM: SIMULTANEOUS USE OF MULTIPLE PROJECT DELIVERY METHODS , 2000 .

[37]  G. E. Gibson,et al.  Preproject-Planning Process for Capital Facilities , 1995 .

[38]  김용진,et al.  [특별세션강연 5] 플랜트 FEED(front-end engineering & design) 설계 기반 구축 , 2010 .

[39]  Daniel W. Halpin Financial and Cost Concepts for Construction Management , 1985 .

[40]  Hamzah Abdul-Rahman,et al.  A perspective of material management practices in a fast developing economy: the case of Malaysia , 1994 .

[41]  W. B. Ledbetter Quality Performance on Successful Project , 1994 .

[42]  E. Sarah Slaughter,et al.  Implementation of construction innovations , 2000 .

[43]  Gregory A. Keoleian,et al.  Life cycle energy and environmental performance of a new university building: modeling challenges and design implications , 2003 .

[44]  Ross B. Corotis,et al.  INSPECTION, MAINTENANCE, AND REPAIR WITH PARTIAL OBSERVABILITY , 1995 .

[45]  Raymond T. Aoieong,et al.  A process approach in measuring quality costs of construction projects: model development , 2002 .

[46]  Zohar J. Herbsman Closure to “Time is Money: Innovative Contracting Methods in Highway Construction” by Zohar J. Herbsman , 1997 .

[47]  A. Agapiou,et al.  The changing role of builders merchants in the construction supply chain , 1998 .

[48]  Stephanie E. Chang,et al.  Life-Cycle Cost Analysis with Natural Hazard Risk , 1996 .

[49]  Akintola Akintoye,et al.  Just-in-Time application and implementation for building material management , 1995 .

[50]  Tzvi Raz,et al.  Effective Sizing and Content Definition of Work Packages , 1998 .

[51]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[52]  Johannes T. Voordijk,et al.  The concept of modularity in supply chains : A multiple case-study in the construction industry , 2006 .

[53]  Gerhard Weikum,et al.  The Mentor project: steps towards enterprise-wide workflow management , 1996, Proceedings of the Twelfth International Conference on Data Engineering.

[54]  M. Wegener Overview of Land Use Transport Models , 2004 .

[55]  Jae-Jun Kim,et al.  Work-Package–Process Model for Piping Construction , 1995 .

[56]  Hmh Herman Hegge,et al.  Generic bill-of-material: a new product model , 1991 .

[57]  X. Zhang,et al.  Towards automated progress assessment of workpackage components in construction projects using computer vision , 2009, Adv. Eng. Informatics.

[58]  G. D. Holt,et al.  Applying multi-attribute analysis to contractor selection decisions , 1994 .

[59]  Hazem Elzarka,et al.  Object-Oriented Methodology for Materials-Management Systems , 1995 .

[60]  Joseph H. M. Tah,et al.  Towards an agent-based construction supply network modelling and simulation platform , 2005 .

[61]  David I. Cleland,et al.  Project Management: Strategic Design and Implementation , 1990 .

[62]  Johan Bollen,et al.  A practical ontology for the large-scale modeling of scholarly artifacts and their usage , 2007, JCDL '07.

[63]  Daniel W. Halpin,et al.  COMPASS—New Paradigm for Project Cost Control Strategy and Planning , 1996 .

[64]  H. Randolph Thomas,et al.  Impact of Material Management on Productivity—A Case Study , 1989 .

[65]  Russell L. Ackoff,et al.  An Approximate Measure of Value , 1954, Oper. Res..

[66]  Jeffrey S. Russell,et al.  Contractor prequalification data for construction owners , 1992 .

[67]  Daniel C. Okpala,et al.  Causes of High Costs of Construction in Nigeria , 1988 .

[68]  T. R. Stacey Design - a strategic issue , 2009 .

[69]  Travis R. Johnson Application of Relational Contracting Methods to Federal Construction Projects , 2011 .

[70]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[71]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[72]  Mohan M. Kumaraswamy,et al.  Appropriate Appraisal and Apportionment of Megaproject Risks , 1997 .

[73]  Gunnar Lucko,et al.  Modeling Measures of Float Monetization for Quantitative Risk Management of Construction Projects , 2012 .

[74]  Robert L. K. Tiong,et al.  Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .

[75]  Cameron A. MacKenzie,et al.  Multiple objective decision-making , 2015 .

[76]  TaeHoon Hong,et al.  Effect of project characteristics on project performance in construction projects based on structural equation model , 2009, Expert Syst. Appl..

[77]  Ji Won Choi Forecasting potential project risks through leading indicators to project outcome , 2007 .

[78]  Lansford C. Bell,et al.  ATTRIBUTES OF MATERIALS MANAGEMENT SYSTEMS , 1986 .

[79]  Francis Tekyi Edum-Fotwe,et al.  Developing project management competency: perspectives from the construction industry , 2000 .

[80]  Samuel T. Ariaratnam,et al.  Financial Outlay Modeling for a Local Sewer Rehabilitation Strategy , 2002 .

[81]  Alistair G.F. Gibb,et al.  Interface Management within Construction: In Particular, Building Facade , 2003 .

[82]  David E. Goldberg,et al.  The Design of Innovation: Lessons from and for Competent Genetic Algorithms , 2002 .

[83]  Michael Riley,et al.  A multi‐criteria approach to contractor selection , 2002 .

[84]  Sang Joon Kim,et al.  A Mathematical Theory of Communication , 2006 .

[85]  Frens Pries,et al.  Innovation in the construction industry: the dominant role of the environment , 1995 .

[86]  Hau L. Lee,et al.  Mitigating supply chain risk through improved confidence , 2004 .

[87]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[88]  Ghang Lee,et al.  Process Model Perspectives on Management and Engineering Procedures in the Precast'Prestressed Concrete Industry , 2004 .

[89]  S. S. Chaudhry *,et al.  Application of genetic algorithms in production and operations management: a review , 2005 .

[90]  Cerry M. Klein,et al.  An efficient approach to solving fuzzy MADM problems , 1997, Fuzzy Sets Syst..

[91]  Wonjun Lee,et al.  An Adaptive Memoryless Tag Anti-Collision Protocol for RFID Networks * , 2005 .

[92]  Roger Jianxin Jiao,et al.  Generic Bill-of-Materials-and-Operations for High-Variety Production Management , 2000, Concurr. Eng. Res. Appl..

[93]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[94]  K Babaei,et al.  LIFE-CYCLE COST ANALYSIS FOR PROTECTION AND REHABILITATION OF CONCRETE BRIDGES RELATIVE TO REINFORCEMENT CORROSION , 1994 .

[95]  R. Calantone,et al.  Are Really New Product Development Projects Harder to Shut Down , 1998 .

[96]  Frederik A. Ruinen Pontis Bridge Management System Software Implementation , 1993 .

[97]  K. Adalberth,et al.  Energy use during the life cycle of single-unit dwellings: Examples , 1997 .

[98]  David Arditi,et al.  The JIT materials management system in developing countries , 2005 .

[99]  Iman Soeharto Manajemen Proyek : Dari Konseptual Sampai Operasional , 2002 .

[100]  Aaron J. Shenhar,et al.  Improving PM: Linking Success Criteria to Project Type A paper presented to the Southern Alberta Chapter, Project Management Institute, Symposium "Creating Canadian Advantage through Project Management", Calgary, May 1996. , 2001 .

[101]  Chrispin Pettang,et al.  Estimating building materials cost in urban housing construction projects, based on matrix calculation: the case of Cameroon , 1997 .

[102]  Quentin W. Fleming,et al.  Earned Value Project Management , 1996 .

[103]  K. Samset,et al.  Issues in Front-End Decision Making on Projects , 2010 .

[104]  Saumyendu Ghosh,et al.  Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms , 2009 .

[105]  Pollaphat Nitithamyong,et al.  Web-based construction project management systems: how to make them successful? , 2004 .

[106]  Anders Thorstenson,et al.  A procedure-oriented generic bill of materials , 1997 .

[107]  Y. Mohamed,et al.  Optimal construction project planning , 2002, Proceedings of the Winter Simulation Conference.

[108]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning , 2000 .

[109]  Xxyyzz High Performance Construction Materials and Systems : An Essential Program for America and Its Infrastructure—Technical Report , 1993 .

[110]  Ching-Lai Hwang,et al.  Multiple Attribute Decision Making: Methods and Applications - A State-of-the-Art Survey , 1981, Lecture Notes in Economics and Mathematical Systems.

[111]  Kerry London,et al.  THEORETICAL SUPPLY CHAIN NETWORK MODELLING IN THE BUILDING INDUSTRY , 1998 .

[112]  H. Randolph Thomas,et al.  Role of the Fabricator in Labor Productivity , 2000 .

[113]  Kathryn A. Dowsland,et al.  Genetic Algorithms-a Tool for OR? , 1996 .

[114]  Gary D. Bates Envisioning Successful Construction: Project Planning is the Key , 1995 .

[115]  Naief Turki Ibn-Homaid,et al.  A comparative evaluation of construction and manufacturing materials management , 2002 .

[116]  Bo Li,et al.  Design and Implementation of Auto Parts Data Management System Based on BOM , 2011 .

[117]  D. Delen,et al.  RFID for Better Supply‐Chain Management through Enhanced Information Visibility , 2007 .

[118]  George Ofori,et al.  Building waste assessment score: design-based tool , 2004 .

[119]  Vivian W. Y Tam,et al.  On prefabrication implementation for different project types and procurement methods in Hong Kong , 2007 .

[120]  R. Lamming,et al.  Developing integration through total quality supply chain management , 1995 .

[121]  Iris D. Tommelein,et al.  WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .

[122]  Raykun R. Tan,et al.  On the quality of construction engineering design projects , 1995 .

[123]  William J. O'Brien IMPLEMENTATION ISSUES IN PROJECT WEB SITES: A PRACTIONER'S VIEWPOINT , 2000 .

[124]  J A Clements HIGH-PERFORMANCE MATERIALS: A STEP TOWARD SUSTAINABLE TRANSPORTATION , 1995 .

[125]  Rajkumar Buyya,et al.  A Taxonomy of Workflow Management Systems for Grid Computing , 2005, Proceedings of the 38th Annual Hawaii International Conference on System Sciences.

[126]  Martin Skitmore,et al.  Criteria for contractor selection , 1997 .

[127]  R L Tucker,et al.  ASSESSMENT OF CONSTRUCTION INDUSTRY PROJECT MANAGEMENT PRACTICES AND PERFORMANCE , 1990 .

[128]  Jung-Ho Yu,et al.  Critical Success Factors for Project Management Information System in Construction , 2011 .

[129]  Mustafa Alshawi,et al.  Web-enabled project management: an emerging paradigm in construction , 2003 .

[130]  Mohan M. Kumaraswamy,et al.  Compressing construction durations: lessons learned from Hong Kong building projects , 2002 .

[131]  D. Gann,et al.  Innovation in project-based, service-enhanced firms: the construction of complex products and systems , 2000 .

[132]  Feng-Chi Chen,et al.  Genomic divergences between humans and other hominoids and the effective population size of the common ancestor of humans and chimpanzees. , 2001, American journal of human genetics.

[133]  Carlos H. Caldas,et al.  Automating hierarchical document classification for construction management information systems , 2003 .

[134]  M. Roberts Modern management systems for higher margins , 1998 .

[135]  Roland W. Scholz,et al.  Impact factors and regulatory mechanisms for material flow management : Integrating stakeholder and scientific perspectives The case of bio-waste delivery , 2006 .

[136]  Amin Alvanchi,et al.  Dynamics of Working Hours in Construction , 2012 .

[137]  Simon A. Austin,et al.  Matching values and value in construction and design , 2003 .

[138]  G. E. Gibson,et al.  Alignment during preproject planning , 2001 .

[139]  Jeffrey S. Russell,et al.  Risk analysis approach to selection of contractor evaluation method , 1992 .

[140]  James T. O'Connor,et al.  Achieving integration on capital projects with enterprise resource planning systems , 2000 .

[141]  Gary David Holt,et al.  Factors influencing UK construction clients' choice of contractors , 1994 .

[142]  Will Hughes,et al.  Building Design Management , 2001 .

[143]  Chris Hendrickson,et al.  Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .

[144]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[145]  C. T. Hyun,et al.  Change and contract management modules of intelligent- program management information systems (i-PgMIS) for urban renewal projects , 2012 .

[146]  Lauri Koskela,et al.  Foundations of concurrent engineering , 2006 .

[147]  Mark Andrew Ehlen,et al.  Life-Cycle Costs of New Construction Materials , 1997 .

[148]  Nora El-Gohary,et al.  Dynamic Knowledge-Based Process Integration Portal for Collaborative Construction , 2010 .

[149]  Apc Chan,et al.  Application of prefabrication in construction – a new research agenda for reform by CII-HK , 2002 .

[150]  Carlos H. Caldas,et al.  Management and analysis of unstructured construction data types , 2008, Adv. Eng. Informatics.