Optimal lot streaming for multiple products in a two-machine flow shop

[1]  Kenneth R. Baker,et al.  Basic Techniques for Lot Streaming , 1993, Oper. Res..

[2]  G. Steiner,et al.  BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .

[3]  R. G. Vickson,et al.  Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .

[4]  David F. Pyke,et al.  Solution Procedures for the Lot‐Streaming Problem , 1990 .

[5]  Chris N. Potts,et al.  Flow shop scheduling with lot streaming , 1989 .

[6]  Dan Triesch,et al.  Polynomial Transfer Lot Sizing Techniques for Batch Processing on Consecutive Machines , 1989 .

[7]  F. Robert Jacobs,et al.  REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .

[8]  Stephen C. Graves,et al.  Overlapping operations in material requirements planning , 1986 .

[9]  William G. Truscott,et al.  Scheduling production activities in multi-stage batch manufacturing systems , 1985 .

[10]  Jan Karel Lenstra,et al.  Sequencing and scheduling : an annotated bibliography , 1997 .

[11]  Katsundo Hitomi,et al.  Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .

[12]  S. Goyal Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” , 1976 .

[13]  A. Z. Szendrovits Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A Rejoinder , 1976 .

[14]  A. Z. Szendrovits Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .

[15]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[16]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[17]  S. M. Johnson,et al.  Optimal two- and three-stage production schedules with setup times included , 1954 .