Optimal lot streaming for multiple products in a two-machine flow shop
暂无分享,去创建一个
[1] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[2] G. Steiner,et al. BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .
[3] R. G. Vickson,et al. Two- and three-machine flow shop scheduling problems with equal sized transfer batches , 1992 .
[4] David F. Pyke,et al. Solution Procedures for the Lot‐Streaming Problem , 1990 .
[5] Chris N. Potts,et al. Flow shop scheduling with lot streaming , 1989 .
[6] Dan Triesch,et al. Polynomial Transfer Lot Sizing Techniques for Batch Processing on Consecutive Machines , 1989 .
[7] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[8] Stephen C. Graves,et al. Overlapping operations in material requirements planning , 1986 .
[9] William G. Truscott,et al. Scheduling production activities in multi-stage batch manufacturing systems , 1985 .
[10] Jan Karel Lenstra,et al. Sequencing and scheduling : an annotated bibliography , 1997 .
[11] Katsundo Hitomi,et al. Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .
[12] S. Goyal. Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” , 1976 .
[13] A. Z. Szendrovits. Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A Rejoinder , 1976 .
[14] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[15] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[16] William L. Maxwell,et al. Theory of scheduling , 1967 .
[17] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .