Heuristic Risk Assessment Using Cost Factors
暂无分享,去创建一个
[1] Robert Balzer,et al. Report on a knowledge-based software assistant , 1986 .
[2] K. Kansala,et al. Integrating risk assessment with cost estimation , 1997 .
[3] Robert N. Charette,et al. Software Engineering Risk Analysis and Management , 1989 .
[4] Barry Boehm,et al. Ada COCOMO and the Ada Process Model , 1989 .
[5] Barry Boehm,et al. Critical success factors for knowledge-based software engineering applications , 1994, Proceedings KBSE '94. Ninth Knowledge-Based Software Engineering Conference.
[6] Raymond J. Madachy,et al. Knowledge-based risk assessment and cost estimation , 1994, Proceedings KBSE '94. Ninth Knowledge-Based Software Engineering Conference.
[7] Barry W. Boehm,et al. Cost models for future software life cycle processes: COCOMO 2.0 , 1995, Ann. Softw. Eng..
[8] Raymond J. Madachy. Knowledge-based risk assessment and cost estimation , 1995, Automated Software Engineering.
[9] Barry W. Boehm,et al. Software Requirements Negotiation and Renegotiation Aids: A Theory-W Based Spiral Approach , 1995, 1995 17th International Conference on Software Engineering.
[10] Barry W. Boehm,et al. Software Engineering Economics , 1993, IEEE Transactions on Software Engineering.