Robotic platform for monitoring underground cable systems

Accurate, real-time information about the aging status of the power distribution cable network can save the power industry millions of dollars lost due to line failures and premature replacement of cables. Hence, a novel, semi-autonomous robotic sensor platform has been developed for monitoring underground, power distribution cable systems. A segmented, legged modular configuration allows the robot to traverse cables with a diameter of four to eight centimeters and negotiate obstacles along its path. The design of platform consists of a multi-processor control board, a 900 MHz wireless communication module, and infrared, dielectrometry, and acoustic sensors. The robot is capable of fully autonomous operation or human tele-operation via a LAN or Internet connection. A prototype platform has been developed and tested with a 14 kV distribution cable. Currently, sensor integration is underway.

[1]  R. Lyle,et al.  Effect of testing parameters on the outcome of the accelerated cable life test , 1988 .

[2]  H. Kobayashi,et al.  An inspection robot for feeder cables-Basic structure and control , 1991, Proceedings IECON '91: 1991 International Conference on Industrial Electronics, Control and Instrumentation.

[3]  G. Anders,et al.  Ampacity Reduction Factors for Cables Crossing Thermally Unfavorable Regions , 2001, IEEE Power Engineering Review.

[4]  Y. Lu,et al.  PD detection and localisation by acoustic measurements in an oil-filled transformer , 2000 .

[5]  J. Sawada,et al.  A Mobile Robot for Inspection of Power Transmission Lines , 1991, IEEE Power Engineering Review.

[6]  Y. Kojima,et al.  Manipulator System for Constructing Overhead Distribution Lines , 1989, IEEE Power Engineering Review.

[7]  Martin Boyer Systems integration in telerobotics: case study: maintenance of electric power lines , 1996, Proceedings of IEEE International Conference on Robotics and Automation.

[8]  D. Fournier,et al.  Early detection of faults in underground distribution cable joints by partial discharge measurements , 1994, Proceedings of 1994 4th International Conference on Properties and Applications of Dielectric Materials (ICPADM).

[9]  Rafael Aracil,et al.  Teleoperated robots for live power lines maintenance (ROBTET) , 1997 .

[10]  B. Achiriloaie,et al.  VI REFERENCES , 1961 .

[11]  W. Reder,et al.  Reliability centered maintenance for distribution underground systems , 2000, 2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134).

[12]  S. Nio,et al.  Remote-operated robotic system for live-line maintenance work , 1993, Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance.

[13]  Alexander Mamishev,et al.  Development and applications of fringing electric field dielectrometry sensors and parameter estimation algorithms , 1999 .