A 120 mm Bore Quadrupole for the Phase I LHC Upgrade
暂无分享,去创建一个
P Fessia | E Todesco | F Regis | P Granieri | F Borgnolutti | D Richter
[1] P. Fessia,et al. Heat Transfer in an Enhanced Cable Insulation Scheme for the Superconducting Magnets of the LHC Luminosity Upgrade , 2010, IEEE Transactions on Applied Superconductivity.
[2] Ezio Todesco,et al. High Energy High Intensity Hadron Beams A Solution for Phase-one Upgrade of the LHC Low-beta Quadrupoles Based on Nb-Ti , 2006 .
[3] Electromagnetic Design of the 120 mm Aperture Quadrupole for the LHC Phase One Upgrade , 2009 .
[4] E. Todesco,et al. RANDOM ERRORS IN SUPERCONDUCTING DIPOLES , 2006 .
[5] R Ostojic. LHC Interaction Region Upgrade : Phase I , 2008 .
[6] N. Kimura,et al. The MQXA quadrupoles for the LHC low-beta insertions , 2005 .
[7] E. Todesco,et al. A Method for Coil Design of Superconducting Quadrupoles Based on Sector Coils and Fourier Series , 2010, IEEE Transactions on Applied Superconductivity.
[8] P. Fessia,et al. Electrical and Mechanical Performance of an Enhanced Cable Insulation Scheme for Superconducting Magnets , 2010, IEEE Transactions on Applied Superconductivity.
[9] P. Fessia,et al. Parametric Analysis of Forces and Stresses in Superconducting Quadrupole Sector Windings , 2007, IEEE Transactions on Applied Superconductivity.