The potential of non-manifold topology in the early design stages

The importance of decisions made during the early design stages has prompted researchers to advocate the use of building performance simulation (BPS) during that stage. This paper investigates non-manifold topology (NTM) as a novel approach to 3D modelling that has the potential to be highly compatible with the early design stages and with the input requirements for BPS. The proposed approach avoids the process of simplifying polyhedral models produced by Building Information Modelling (BIM) software to conduct BPS. In particular, NTM allows for a clear segmentation of a building, unambiguous space boundaries, and perfectly matched surfaces and glazing subsurfaces. The NTM approach was tested through a software prototype that integrates 3D modelling software and an energy simulation engine.

[1]  Christoph F. Reinhart,et al.  MODELLING AN EXISTING BUILDING IN DESIGNBUILDER / ENERGYPLUS : CUSTOM VERSUS DEFAULT INPUTS , 2009 .

[2]  Christoph F. Reinhart,et al.  Experimental Validation of Autodesk® 3ds Max® Design 2009 and Daysim 3.0 , 2009 .

[3]  Wassim Jabi The role of artifacts in collaborative design , 1998 .

[4]  Lieve Weytjens,et al.  User preferences for a simple energy design tool: Capturing information through focus groups with architects , 2012 .

[5]  Peter G. Ellis,et al.  Energy Design Plugin: An EnergyPlus Plugin for SketchUp; Preprint , 2008 .

[6]  Daniel Macumber,et al.  OpenStudio: An Open Source Integrated Analysis Platform , 2011 .

[7]  Trung Nguyen Simplifying The Non-Manifold Topology Of Multi-Partitioning Surface Networks , 2011 .

[8]  Christoph Reinhart,et al.  EXPERIMENTAL VALIDATION OF 3 DS MAX ® DESIGN 2009 AND DAYSIM 3 . 0 1 2 , 2009 .

[9]  Vítor Leal,et al.  Building envelope shape design in early stages of the design process: Integrating architectural design systems and energy simulation , 2013 .

[10]  Robert Aish,et al.  Spatial Information Modeling of Buildings Using Non-Manifold Topology with ASM and DesignScript , 2012, AAG.

[11]  Vladimir Bazjanac,et al.  IFC BIM-Based Methodology for Semi-Automated Building Energy Performance Simulation , 2008, ICIT 2008.

[12]  Vladimir Bazjanac,et al.  Bim – Geometry Modeling Guidelines For Building Energy Performance Simulation , 2013, Building Simulation Conference Proceedings.

[13]  Wassim Jabi Parametric spatial models for energy analysis in the early design stages , 2014, ANSS 2014.

[14]  Leila De Floriani,et al.  A two-level topological decomposition for non-manifold simplicial shapes , 2007, Symposium on Solid and Physical Modeling.

[15]  Christoph F. Reinhart,et al.  DIVA 2.0: INTEGRATING DAYLIGHT AND THERMAL SIMULATIONS USING RHINOCEROS 3D, DAYSIM AND ENERGYPLUS , 2011 .

[16]  A. Fleisher Grammatical Architecture? , 1992 .

[17]  Drury B. Crawley,et al.  EnergyPlus: Energy simulation program , 2000 .

[18]  Shady Attia,et al.  Selection criteria for building performance simulation tools: contrasting architects' and engineers' needs , 2012 .

[19]  Charles M. Eastman,et al.  Automated Assessment of Early Concept Designs , 2009 .

[20]  Andrew and Marsh Andrew Roberts,et al.  ECOTECT: Environmental Prediction in Architectural Education , 2001, eCAADe proceedings.

[21]  A. Mahdavi,et al.  COMPLEX BUILDING PERFORMANCE ANALYSIS IN EARLY STAGES OF DESIGN: A solution based on differential modeling, homology-based mapping, and generative design agents , 2001 .

[22]  Nathaniel L. Jones,et al.  Automated translation of architectural models for energy simulation , 2012, ANSS 2012.