Minimizing operators’ walking times into a linear system layout
暂无分享,去创建一个
[1] George B. Dantzig,et al. Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..
[2] Andreas T. Ernst,et al. Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..
[3] Andrew Lim,et al. Manpower allocation with time windows and job teaming constraints , 2003 .
[4] Kenneth R. Baker,et al. Workforce Allocation in Cyclical Scheduling Problems: A Survey , 1976 .
[5] William J. Abernathy,et al. A Three-Stage Manpower Planning and Scheduling Model - A Service-Sector Example , 1973, Oper. Res..
[6] Erik Demeulemeester,et al. Personnel scheduling: A literature review , 2013, Eur. J. Oper. Res..
[7] Leslie C. Edie,et al. Traffic Delays at Toll Booths , 1954, Oper. Res..
[8] Reza Tavakkoli-Moghaddam,et al. Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach , 2013 .
[9] Erhan Erkut,et al. Improving Volunteer Scheduling for the Edmonton Folk Festival , 2004, Interfaces.
[10] Alberto G. Canen,et al. Facility layout overview: towards competitive advantage , 1996 .
[11] Vladimir Marianov,et al. Employee positioning and workload allocation , 2008, Comput. Oper. Res..
[12] Eric S. Grajo. Strategic layout planning and simulation for lean manufacturing a LayOPT tutorial , 1995, WSC '95.