Chronological simulation for transmission reliability margin evaluation with time varying loads
暂无分享,去创建一个
[1] G. A. Hamoud,et al. Assessment of available transfer capability of transmission systems , 2000 .
[2] A. David,et al. Transmission congestion management in an electricity market , 1999 .
[3] Feng Xia,et al. A methodology for probabilistic simultaneous transfer capability analysis , 1996 .
[4] A. M. Leite da Silva,et al. Evaluation of transfer capabilities of transmission systems in competitive environments , 2004 .
[5] A.C.G. Melo,et al. Simultaneous transfer capability assessment by combining interior point methods and Monte Carlo simulation , 1997 .
[6] Marija D. Ilic,et al. Transmission capacity in power networks , 1998 .
[7] Robert J. Vanderbei,et al. Linear Programming: Foundations and Extensions , 1998, Kluwer international series in operations research and management service.
[8] Ron Allan,et al. Sequential probabilistic methods for power system operation and planning , 1998 .
[9] Chanan Singh,et al. Calculation of risk and statistical indices associated with available transfer capability , 2003 .
[10] Probability Subcommittee,et al. IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.
[11] Tharam S. Dillon,et al. A bounded set theoretical approach to reliability modelling and calculations for composite generation-transmission systems including systems with unconventional energy sources , 1979 .
[12] Ian Dobson,et al. Quantifying transmission reliability margin , 2004 .
[13] I. Wangensteen,et al. Transmission management in the deregulated environment , 2000, Proceedings of the IEEE.
[14] A. David,et al. Optimal dispatch under transmission contracts , 1999 .
[15] Roy Billinton,et al. Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .
[16] A. Yokoyama,et al. Risk based TRM evaluation by probabilistic approach , 2004, 2004 International Conference on Probabilistic Methods Applied to Power Systems.
[17] Akihiko Yokoyama,et al. Consideration of an appropriate TTC by probabilistic approach , 2004 .
[18] M. R. Haghifam,et al. A probabilistic modeling based approach for Total Transfer Capability enhancement using FACTS devices , 2010 .
[19] A. K. David,et al. Reconciling pool and contract dispatch in open access transmission operations , 1998 .
[20] G. Anders,et al. Available transmission capability-sell firm or interruptible? , 1999 .
[21] Mainak Mazumdar,et al. Influence of temperature and load forecast uncertainty on estimates of power generation production costs , 2000 .
[22] Roy Billinton,et al. Sensitivity of system operating considerations in generating capacity adequacy evaluation , 2010 .
[23] R. N. Allan,et al. Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation , 1994 .
[24] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[25] Roy Billinton,et al. Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads , 1995 .
[26] L. Salvaderi,et al. Monte Carlo approach in planning studies: an application to IEEE RTS , 1988 .
[27] João Peças Lopes,et al. Probabilistic evaluation of reserve requirements of generating systems with renewable power sources: The Portuguese and Spanish cases , 2009 .